Plan Review Notes
Plan Review Notes For Permit 09090218
Permit Number 09090218
Review Stop ENG
Sequence Number 1
Notes
Date Text
2009-10-07 16:14:53FAILED
  
 PLEASE PROVIDE NEW PROPOSED WATER USAGE FLOW
 CALCULATIONS / DEMANDS:
  
 1. THE ADDITION OF SEVERAL FOOD PREPARATION, KITCHEN
 AND UTILITIY AREAS FOR PHASE 1 AND PHASE 2 MAY REQUIRE
 AN UPGRADE TO THE EXISTING WATER SERVICES.
  
 2. PLEASE PROVIDE LOCATION(S), DETAILS AND CAPACITIY OF
 EXISTING GREASE-WASTE TRAPS TO ENSURE CONFORMITY TO
 CWPB'S CONSTRUCTION STANDARDS.
  
 3. PLEASE RESPOND TO PLUMBING REVIEW STOP NO. 10,
 CONCERNING THE RPZV BACKFLOW REQUIREMENT PER MR. KEN
 STEVENS.
  
 REVIEWED BY EMERY P. FABIAN, ENGINEERING SERVICES,
 494-1078 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved