Plan Review Notes
Plan Review Notes For Permit 09080424
Permit Number 09080424
Review Stop E
Sequence Number 1
Notes
Date Text
2009-09-18 13:34:09** FAILED REVIEW **
  
 1) NOTE: PERMIT HAS NOT BEEN APPLIED FOR UNDER A
 LICENSED CONTRACTOR.
  
 2) NOTE: THE SUBMITTED RISER AS SHOWN ON E5.1 CONTAINS
 A SUBSTANTIAL AMOUNT OF CODE VIOLATIONS. THE RISER
 SHOWN FOR FEEDS TO FIRE PUMP AND SEVERAL OTHER ASPECTS
 OF SERVICE AS SHOWN IN VIOLATION OF TOO MANY CODES TO
 NOTE. THE APPLIED SCOPE OF WORK IS FOR THE SECOND FLOOR
 TENANT. PLEASE ONLY INCLUDE ELECTRICAL FOR THIS
 RELEVANT SPACE AND EQUIPMENT ONLY.
 ** IT SHOULD BE NOTED IF THE ELECTRICAL AS SHOWN ON
 RISER IS THE ACTUAL INSTALLATION THERE SHOULD BE
 CONCERNS OVER THE INSTALLATION AS SHOWN.
 THERE ARE SEVERAL ITEMS SHOWN ON RISER WHICH ARE LIFE
 SAFETY AND FIRE HAZARDS CONCERNS. IF RISER IS ACCURATE
 THEN THESE ITEMS SHOULD BE ADDRESSED BY THE APPROPRIATE
 PARTIES RESPONSIBLE FOR THE BUILDING.
 PLEASE SEE NFPA-110, NFPA-20 AND NFPA-70 FOR LIFE
 SAFETY, LEGALLY REQUIRED SYSTEMS ALONG WITH FIRE PUMP
 INSTALLATION MINIMUMS.
  
 ** THIS WAS NOTED ON A PREVIOUS PLAN REVIEW SEVERAL
 YEARS AGO.
  
 2) NOTE: THERE ARE INCONSISTENCIES WITH RISER ON PLANS
 SUBMITTED FOR THIS SPACE AND PREVIOUSLY REVIEWED PLANS.
 THE PLAN REVIEW ON SUITE #200 AND #202 HAD COMMENTS
 WITH THE RESPECT TO LOADS ON PANEL 2MA. THIS WOULD
 AFFECT THE LOAD SHOWN ON 1MA ON THIS PLANS.
 THIS RISER IS COMPLETELY DIFFERENT.
  
 A) THERE ARE NO OTHER PANELS ON THE LOAD SIDE OF THE
 TRANSFORMER FED FROM 2MA EXCEPT 2LA.
 B) THE PANEL SCHEDULE FOR 1MA STATES IT HAS A FEED TO
 PANEL 1XA, HOWEVER BASED ON THE RISER 1XA IS NOT EVEN
 FED FROM 1MA.
 C) PANEL 1MA DOES NOT LIST ANY OTHER PANELS SUCH AS
 2MA. IS THIS A FEED-THRU PANEL?
  
 PLEASE SEE 450 FOR MAXIMUM ALLOWABLE LOADS. PLEASE SEE
 NEC 220.12,220.14,220.42,220.44 ETC ALONG WITH
 215.3,230.42.
 LOAD CALCULATIONS SHOULD BE DONE TO ACCURATELY DEPICT
 ACTUAL LOAD ON SERVICE EQUIPMENT, TRANSFORMER
 PLEASE COORDINATE ALL EQUIPMENT FOR COMPLETED REVIEW.
 PLEASE SHOW EQUIPMENT SPECIFIC TO SCOPE OF WORK AND ANY
 EQUIPMENT WHICH IS BEING AFFECTED BY NEW WORK.
  
 3) NOTE: PLEASE BE SURE ALL SHEETS ARE SIGNED THE SAME.
 INITIALS ON SOME SHEETS?
 FS 471.025
  
 4) NOTE: LIGHTING CIRCUITS FOR SUITE #103 NEED TO BE
 SPECIFIC AND IDENTIFIED ON 1MA. ONLY STATES *LTS*.
 PLEASE BE SURE THIS IS SPECIFIC AS REQUIRED BY REVISED
 408.4.
 ** IF THIS WAS THE ONLY COMMENT OR ONE OF MINOR
 COMMENTS IT WOULD HAVE BEEN REDLINED.
  
 5) NOTE: PANEL 1LA IS SHOWN AS A THREE PHASE PANEL.
 HOWEVER BASED ON THE PANEL SCHEDULE ITSELF, THIS IS
 ALSO SHOWN AS A SINGLE PHASE PANEL. WHICH IS IT?
 PLEASE COORDINATE SO THAT AN ACCURATE REVIEW OF CODE
 REQUIRED CALCULATIONS CAN BE DONE.
 215.5, 230,240, 220. GIVEN AS GENERAL CHAPTERS AS THERE
 ARE SEVERAL CODES WHICH WOULD APPLY.
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved