Plan Review Notes For Permit 09080073 |
Permit Number |
09080073 |
|
Review Stop |
FIRE |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2009-08-17 11:46:57 | *****FIRE-STAMPED W/PROVISO | | | | | | PLAN SHEETS FP-1 AND FP-2 WERE FIRE-STAMPED ACCORDINGLY | | WITH ATTACHED PROVISO FROM BOTH FIRE AND ENGINEERING; | | READY FOR PERMIT ISSUANCE. | 2009-08-05 15:13:59 | 313 CLEMATIS STREET | | INSTALL NEW FIRE SPRINKLER SYSTEM IN EXISTING BUILDING | | | | 1. THE FIRE DEPARTMENT CONNECTION (FDC) SHALL BE | | EQUIPPED WITH KNOX LOCKING CAPS TO PREVENT VANDALISM OR | | THEFT. | | | | 2. A CHAIN AND LOCK IS REQUIRED ON THE BACKFLOW DEVICE. | | | | 3. THE ENTIRE BUILDING IS REQUIRED TO BE COMPLETELY | | FIRE SPRINKLER PROTECTED. THE INSTALLATION IS TO COMPLY | | WITH NFPA 13, THE STANDARD FOR THE INSTALLATION OF | | AUTOMATIC FIRE SPRINKLERS. | | | | 4. A SPARE SPRINKLER BOX, SPARE SPRINKLERS, AND WRENCH | | IS TO BE PROVIDED. | | | | 5. A GUAGE IS TO BE PROVIDED ON THE RISER. | | | | 6. THE ENTIRE FIRE SPRINKLER SYSTEM IS TO BE PRESSURE | | TESTED AT 200 PSIG FOR A MINIMUM OF AT LEAST TWO HOURS. | | | | 7. THE FIRE DEPARTMENT CONNECTION IS TO BE WITHIN 150 | | FEET OF A FIRE HYDRANT. | | | | 8. A FLOW TEST IS TO BE SCHEDULED AS SOON AS SOON | | POSSIBLE TO VERIFY STATIC AND RESIDENTIAL READINGS. | | | | 9. PLEASE SUBMIT CUT-SHEETS ON THE QUICK RESPONSE | | SPRINKLER HEADS PLANNED FOR USE. | | | | 10. ENSURE THAT HYDRAULIC CALCULATION PLATES AND VALVE | | SIGNS ARE INSTALLED. | | | | | | APPROVED PROVISO | | | | MIKE CARSILLO, BATTALION CHIEF | | BUREAU OFFIRE PREVENTION | | 804-4709 PHONE | | 804-4774 FAX |
|