Date |
Text |
2009-06-17 11:31:47 | FAILED |
| |
| PROVIDE RESPONSES IN WRITING. |
| |
| NOTE: THE PLANS SHOW WORK ON 3 PARCELS - BANK, |
| COMMERCIAL AND ENTRY ROAD - EACH HAVING A DISTINCT PCN. |
| PER ROBERT BROWN, ASSISTANT CONSTRUCTION SERVICES |
| DIRECTOR, A SEPARATE BUILDING PERMIT IS REQUIRED FOR |
| THE WORK ON EACH PARCEL. |
| |
| 1) PROVIDE PROOF THAT THE FOLLOWING CONDITIONS FROM |
| ORDINANCE NO. 4162-08 HAVE BEEN MET: |
| |
| A. THE DEVELOPER SHALL INSTALL A TRAFFIC SIGNAL AT THE |
| INTERSECTION OF OKEECHOBEE BOULEVARD AND BENOIST FARMS |
| ROAD, UPON MEETING THE WARRANTS IDENTIFIED IN THE |
| LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL |
| DEVICES (MUTCD). THE TRAFFIC DATA SHALL BE COLLECTED |
| DURING PEAK SEASON OR ADJUSTED TO PEAK SEASON |
| CONDITIONS BASED ON PALM BEACH COUNTY CRITERIA FOR TWO |
| (2) CONSECUTIVE YEARS AFTER THE FINAL CERTIFICATE OF |
| OCCUPANCY FOR THE OAKTON COMMONS CPD IS ISSUED. PRIOR |
| TO THE ISSUANCE OF THE FIRST BUILDING PERMIT FOR THE |
| FIRST COMMERCIAL BUILDING WITHIN THE OAKTON COMMONS CPD |
| FOLLOWING THE ADOPTION OF THIS ORDINANCE, THE DEVELOPER |
| SHALL PROVIDE WRITTEN VERIFICATION FROM THE PALM BEACH |
| COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT THAT ANY |
| REQUIRED BOND HAS BEEN POSTED AND A PUBLIC FACILITIES |
| AGREEMENT HAS BEEN EXECUTED WITH THE COUNTY. IF A BOND |
| AND/OR PUBLIC FACILITIES AGREEMENT IS NOT REQUIRED, |
| THEN IT SHALL BE STATED IN THE WRITTEN VERIFICATION |
| FROM PALM BEACH COUNTY. |
| |
| B. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY |
| FOR ANY NEW BUILDING(S) WITHIN THE OAKTON COMMONS CPD, |
| THE DEVELOPER SHALL PROVIDE THE FOLLOWING EXCLUSIVE |
| TURN LANES AT THE PROJECT ACCESS DRIVEWAYS, WHERE NOT |
| EXISTING, WHICH SERVICE THE NEW BUILDING(S) FROM THE |
| REQUIRED TURN LANE(S): |
| |
| 1. EXCLUSIVE WEST BOUND RIGHT-TURN LANE ALONG |
| OKEECHOBEE BOULEVARD, ONTO THE PROJECT ACCESS AT THE |
| INTERSECTION OF BENOIST FARMS ROAD. |
| 2. EXCLUSIVE EAST BOUND LEFT-TURN LANE ALONG OKEECHOBEE |
| BOULEVARD, ONTO THE PROJECT ACCESS AT THE INTERSECTION |
| OF BENOIST FARMS ROAD. |
| 3. WEST BOUND RIGHT-TURN LANE ALONG OKEECHOBEE |
| BOULEVARD, ONTO THE WESTERN PROJECT ACCESS LOCATION. |
| 4. NOTWITHSTANDING THE FOREGOING PROVISIONS, IF |
| CONSTRUCTION OF THE TURN LANE(S) IS INCLUDED IN THE |
| FLORIDA DEPARTMENT OF TRANSPORTATION/PALM BEACH COUNTY |
| CONTRACT TO WIDEN OKEECHOBEE BOULEVARD, THE CITY SHALL |
| NOT DELAY THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY |
| SOLELY BECAUSE THE FDOT/COUNTY ROAD CONTRACTOR HAS NOT |
| COMPLETED INSTALLATION OF THE TURN LANE(S) PRIOR TO THE |
| DEVELOPER'S REQUEST FOR THE CERTIFICATE OF OCCUPANCY. |
| |
| C. THE DEVELOPER SHALL PROVIDE THE CITY'S PLANNING AND |
| ZONING DEPARTMENT DOCUMENTATION FROM PALM BEACH COUNTY |
| OR THE FLORIDA DEPARTMENT OF TRANSPORTATION THAT THE |
| EXCLUSIVE TURN LANE(S) HAS BEEN BUILT TO THE APPLICABLE |
| STANDARDS OR EVIDENCE THAT THE CONSTRUCTION OF THE TURN |
| LANE(S) IS INCLUDED IN THE CONTRACT TO WIDEN OKEECHOBEE |
| BOULEVARD AND WILL BE CONSTRUCTED BY FDOT/COUNTY'S |
| CONTRACTOR. |
| |
| D. THE DEVELOPER SHALL RECORD, IN THE PUBLIC RECORDS OF |
| PALM BEACH COUNTY, ALL REQUIRED CROSS ACCESS AND CROSS |
| PARKING AGREEMENTS WITHIN THE OAKTON COMMONS CPD PRIOR |
| TO THE ISSUANCE OF THE FIRST BUILDING PERMIT. |
| |
| E. PRIOR TO THE SUBMITTAL OF THE FIRST BUILDING PERMIT |
| FOR THE COMMERCIAL POD, THE DEVELOPER SHALL RECORD AN |
| EASEMENT TO ALLOW FOR JOINT USE OF THE COMMERCIAL |
| PARKING FOR PARK AND RIDE PURPOSES. THE EASEMENT |
| LANGUAGE SHALL BE REVIEWED AND APPROVED BY THE PLANNING |
| AND ZONING DEPARTMENT AND THE OFFICE OF THE CITY |
| ATTORNEY PRIOR TO RECORDATION. |
| |
| 2) PROVIDE PROOF THAT THE FOLLOWING CONDITIONS FROM THE |
| APRIL 23, 2009, BANK MINOR AMENDMENT APPROVAL LETTER |
| HAVE BEEN MET: |
| |
| A. THE LANDSCAPE PLANS SUBMITTED WITH THE BUILDING |
| PERMIT SHALL INCLUDE A NOTE THAT THE PUBLIC |
| RIGHTS-OF-WAY BETWEEN STREET OR SIDEWALK SURFACES AND |
| REQUIRED BUFFER STRIPS AND LANDSCAPED OPEN SPACE AREAS |
| ADJACENT TO OKEECHOBEE BOULEVARD SHALL BE SODDED AND |
| IRRITATED. |
| |
| B. THE EAST SIDE OF THE ENTRY ROAD WITHIN TRACT A SHALL |
| BE PLANTED WITH MATERIAL CONSISTENT WITH THE LANDSCAPE |
| PROPOSED ON THE WEST SIDE OF THE ENTRY ROAD. THE |
| SPECIFIC MATERIAL SHALL BE APPROVED BY THE PLANNING AND |
| ZONING DEPARTMENT PRIOR TO INSTALLATION AND REFLECTED |
| ON THE LANDSCAPE PLANS. |
| |
| 3) THERE ARE A NUMBER OF DISCREPANCIES AMONG THE LATEST |
| PLANS APPROVED BY THE PLANNING AND ZONING DEPARTMENT |
| AND THE SITE, LANDSCAPE AND CIVIL PLANS SUBMITTED AS |
| PART OF THE PERMIT. ADDITIONALLY, THERE ARE |
| DISCREPANCIES AMONG THE PLANS SUBMITTED AS PART OF THE |
| PERMIT. ALL PLANS SHALL BE INTERNALLY CONSISTENT AS |
| WELL AS BE CONSISTENT WITH THE PLANS APPROVED BY THE |
| PLANNING AND ZONING DEPARTMENT. SAMPLE OF |
| INCONSISTENCIES IDENTIFIED BELOW: |
| |
| A. THE PHASE LINE ON THE SITE AND CIVIL PLANS |
| INCORRECTLY DO NOT INCLUDE THE LANDSCAPE AREA AT THE |
| TERMINATION OF THE ENTRY DRIVE AND THE AREA BY THE TURN |
| AROUND. |
| |
| B. THE LANDSCAPE PLAN SHOWS DIFFERENT LANDSCAPE AROUND |
| THE BUILDING AND THE SIGN THAN WHAT WAS APPROVED BY |
| PLANNING AND ZONING. |
| |
| C. THE CIVIL PLANS SHOW THE WATER MAIN EAST OF THE |
| BUILDING DIFFERENT THAN THE APPROVED PLANS AND THE |
| SUBMITTED LANDSCAPE PLANS. ADDITIONALLY, THE LOCATION |
| OF THE WATER MAIN ON THE CIVIL PLANS HAS IT PASS UNDER |
| A TREE. |
| |
| D. THE LOCATION OF THE LIGHT POLES ON THE SOUTH SIDE |
| OF THE BUILDING AND IN THE PARKING ROW NORTH OF THE |
| BUILDING DIFFER ON THE SITE PLAN AND THE LANDSCAPE AND |
| LIGHTING PLANS. |
| |
| E. THE PARKING DETAIL ON SHEET 6 OF 7 DOES NOT MATCH |
| THE SIZE OF THE PARKING SPACES ON THE SITE PLAN |
| (10'X20' VS 9'X18'). |
| |
| F. THE CIVIL PLANS SHOW AN ARC ON THE WEST SIDE OF THE |
| ENTRY ROAD WITH A MODIFIED SIDEWALK THAT IS NOT SHOWN |
| ON ANY OTHER PLANS NOR ON ANY APPROVED PLANS. |
| |
| 4) NOTE THAT CHANGES TO THE PLANS WILL REQUIRE A NEW |
| MINOR AMENDMENT APPROVAL BY THE PLANNING AND ZONING |
| DEPARTMENT. |
| |
| 5) NO INFORMATION WAS PROVIDED ON THE PAVERS USED IN |
| VARIOUS AREAS OF THE SITE. |
| |
| 6) THE SIGNS AND AWNINGS WILL REQUIRE SEPARATE PERMITS |
| - NOTE THAT THE ELEVATIONS SHOW THE AWNINGS LABELED AS |
| METAL, WHILE THE DATA CHART CALLS THEM OUT AS METAL |
| FRAME WITH CANVAS. THE ELEVATIONS SHALL BE CORRECTED. |
| |
| 7) THE LANDSCAPE PLANS ARE MISSING THE REQUIRED |
| CALCULATIONS, EX. XERISCAPE TABLE, PLANT NUMBER |
| COMPLIANCE LIST, ETC. |
| |
| 8) THE LANDSCAPE PLAN SHALL SHOW THE TREES THAT WILL BE |
| RELOCATED INTO THE 50 FOOT NATURAL AREA BUFFER ADJACENT |
| TO RIVERWALK. THE SITE WAS CLEARED DUE TO EXCESSIVE |
| EXOTICS AND THUS NOW IS NO LONGER IN A NATURAL BUFFER |
| STATE. |
| |
| 9) PROVIDE IRRIGATION FOR THE RELOCATED TREES INTO THE |
| NATURAL AREA LISTED IN #8 ABOVE. |
| |
| 10) CORRECTLY SHOW THE TRANSITION BETWEEN THE PARKING |
| AND THE PRESERVE AREA ON THE SITE AND LANDSCAPE PLANS |
| FOR THE LIMITS OF WORK. THERE SEEM TO BE CONTRADICTIONS |
| WITH THE DETAIL AND THE LIMITS OF WORK (PHASE LINE). |
| |
| 11) WHAT ARE THE LIMITS OF THE CIVIL WORK? THE WATER |
| AND SEWER PLANS SEEM TO INDICATE THAT LINES FOR THE |
| ENTIRE OAKTON COMMONS CPD WILL BE INSTALLED AT THIS |
| TIME, WHILE THE PAVING AND DRAINAGE PLANS SEEM TO ONLY |
| APPLY TO THE BANK AND ENTRYWAY PARCELS. |
| |
| 12) CALL OUT THE CURBS AS "D" CURBS ON THE CIVIL PLANS. |
| |
| 13) WHAT IS THE 10" SCH 80 PVC LINE AT THE SOUTHWEST |
| CORNER OF THE BUILDING? IT MAY NOT BE LOCATED UNDER A |
| TREE AS SHOWN. |
| |
| 14) PLEASE NOTE THE FOLLOWING REQUIREMENTS PRIOR TO THE |
| FINAL CERTIFICATE OF OCCUPANCY FOR THE BANK: |
| |
| A. THE REQUIRED PARK AND RIDE SIGNAGE SHALL BE |
| INSTALLED. NOTE: THESE SHALL BE SHOWN ON THE SIGN |
| PERMIT. |
| |
| B. EASEMENTS SHALL BE GRANTED TO THE CITY FOR THE WATER |
| METERS WITHIN THE PARCEL BOUNDARIES. |
| |
| C. TWO (2) COPIES OF THE FINAL REVISED ARCHITECTURAL |
| PLANS, REFLECTING THE FOOTPRINT CHANGE APPROVED ABOVE, |
| SHALL BE PROVIDED TO THE PLANNING AND ZONING DEPARTMENT |
| PRIOR TO THE CERTIFICATE OF OCCUPANCY FOR THE BANK |
| BUILDING. |
| |
| 15) AN APPROVED MINOR PLANNED DEVELOPMENT IS REQUIRED |
| FOR THE ULTIMATE LANDSCAPE WITHIN THE 10 FOOT PRESERVE |
| BUFFER. |
| |