Plan Review Notes For Permit 09050385 |
Permit Number |
09050385 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2009-05-27 15:06:55 | 2007 FBC | | LEVEL 2 ALTERATION | | | | DENIED BY BUILDING | | | | 1) A MINIMUM OF TWO SETS OF PLANS ARE REQUIRED TO BE | | SUBMITTED FOR PERMIT. FBC 106.1* CITY AMENDMENTS. | | | | 2) THE WRONG EDITION OF FBC IS SPECIFIED. THIS PROJECT | | IS UNDER THE 2007 FBC. PLEASE CORRECT. | | | | 3) SPECIFY THE LEVEL OF ALTERATION ON THE PLANS. FBC | | EXISTING BUILDING SECTION 401.4 | | | | 4) ON SHEET A-2 STEEL COLUMN 2 IS MISLABELED AS S.C. 1 | | ON THE FOUNDATION PLAN. PLEASE CORRECT. | | | | 5) ON SHEET A-1 THE DOOR AND WINDOW NOTES APPEAR TO | | INDICATE THE REPLACEMENT OF WINDOWS AND DOORS. PLEASE | | SPECIFY WHICH WINDOWS AND DOORS WILL BE REPLACED. | | SUBMIT 2 COPIES OF PRODUCT APPROVALS, AS REQUIRED BY | | FAC RULE 9B-72, FOR THE WINDOWS AND DOORS THAT ARE | | BEING REPLACED. IF NONE ARE TO BE REPLACED PLEASE | | CLARIFY. | | | | 6) ENGINEERED SHOP DRAWINGS AND CALCULATIONS FROM THE | | SPECIALTY CONTRACTOR WILL BE REQUIRED FOR THE HELICAL | | PIERS USED TO REINFORCE THE EXISTING FOUNDATION AT THE | | STEEL COLUMN LOCATIONS. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|