Date |
Text |
2009-03-12 10:43:46 | RE-ROOF BUILDING REVIEW SECOND CHECKLIST. |
| |
| THE FOLLOWING ITEMS WERE NOT ADDRESSED FROM THE FIRST |
| CHECKLIST: |
| |
| 1- A) CONTRACTOR TO SELECT ON PRODUCT APPROVAL |
| SUBMITTED THE SPECIFIC APPROVED ASSEMBLY TO BE |
| INSTALLED (REPEAT COMMENT. THIS WAS NOT DONE). |
| CONTRACTOR WROTE "GAF 1-1/4 RING SHANK" NEXT TO THIS |
| COMMENT, BUT THIS DOESN'T ADDRESS THE QUESTION ASKED. |
| |
| B) INDICATE SPECIFIC BASE SHEET FASTENING OPTION. |
| REPEAT COMMENT. THIS WAS NOT DONE). |
| |
| ***NOTE: KEEP IN MIND THAT APPROVED ASSEMBLY IS FOR AN |
| INSULATED ASSEMBLY SINCE PERMIT APPLICATION CALLS FOR |
| INSULATION BOARD TO BE INSTALLED. |
| |
| 2- PROVIDE RAS 117 CALCULATIONS FOR NAIL ENHANCING AT |
| PERIMETER AND CORNER AREAS AS REQUIRED BY GENERAL |
| LIMITATION #7 ON LAST PAGE OF NOA 07-0111.03 SUBMITTED |
| (REPEAT COMMENT. THIS WAS NOT DONE). CONTRACTOR WROTE " |
| FIELD -47.3PSF, PER. -79.4PSF, CORNER -119.5PSF" NEXT |
| TO THE COMMENT, BUT THIS DOESN'T ADDRESS THE QUESTION |
| ASKED. THESE ARE JUST THE DESIGN PRESSURES THAT NEED TO |
| BE RESISTED. STILL NEED TO PROVIDE INFORMATION SHOWING |
| HOW THE FASTENERS WILL BE INSTALLED TO MEET THOSE |
| DESIGN PRESSURES. |
| |
| 3- PROVIDE RE-RECORDED NOTICE OF COMMENCEMENT. THE ONE |
| THAT WAS PROVIDED IS EXPIRED BECAUSE IT WAS RECORDED ON |
| 12/01/2008. NOTICE OF COMMENCEMENT IS EXPIRED AFTER 90 |
| DAYS IF WORK IS NOT STARTED (SEC. 713.13 FLORIDA |
| STATUTE). NEED TO PROVIDE RE-RECORDED NOTICE OF |
| COMMENCEMENT. |
| |
| JULIO GOMEZ |
| BUILDING PLANS EXAMINER |
| (561)805-6712 |