2009-05-04 13:12:25 | PASSED WITH PROVISOS: |
| EMAIL: [email protected] |
| OFFICE: 561-494-1083 (ENGINEERING) |
| OFFICE: 561-805-6716 (CONSTRUCTION SERVICES) |
| SHEET C-4: |
| MODIFIED "MANHOLE" S-5 IS SHOWN TO BE A CATCH BASIN, |
| WHICH IS IT? |
| SHEET C-5: |
| 1. ADDED NOTE TO DETAIL FOR WATER SERVICES "SEE DETAIL |
| WS-1 ON SHEET C-7". ONLY 1 OR 2" SERVICES ARE ALLOWED. |
| 3/4" WATER SERVICES ARE NOT ALLOWED, DETAIL WS-1 WILL |
| NEED TO BE FOLLOWED. |
| 2. THE METER SIZE FOR THE IRRIGATION SYSTEM WILL NEED |
| TO BE CHANGED FROM A 3/4" WATER METER TO A 1". A 3/4" |
| METER WILL ONLY SUPPLY 15 GALLONS PER MINUTE (GPM) AT A |
| SAFE, CONTINUOUS OPERATING VOLUME. PER SHEET L-3 |
| (IRRIGATION PLANS), THE GPM USAGES ARE OVER THE SAFE, |
| CONTINUOUS OPERATING VOLUME, WHICH IS ACTUALLY OVER THE |
| ALLOWABLE FOR A 1" METER (25 GPM). EVEN WITH A 1" METER |
| YOU WILL NOT BE ABLE TO MEET THE MINIMUM ALLOWABLE |
| USAGE LEVELS OF A 1" METER, WITHOUT CHANGING THE |
| IRRIGATION SYSTEM DESIGN, WHICH WILL NEED TO BE DONE TO |
| REDUCE FOUR OF THE ZONES TO LESS THAN 25 GPM. THE |
| ALTERNATIVE IS TO INCREASE THE METER SIZE (TO 1-1/2"] |
| AND THE SERVICE SIZE [TO 2"). |
| 3. PER OUR STANDARD DETAILS WATER METERS ARE NOT TO BE |
| PLACED IN SIDEWALKS UNLESS THERE IS NO WHERE ELSE TO |
| PLACE THEM. THESE TWO METERS NEED TO BE INSTALLED IN |
| THE GRASS PARKWAY, SOUTH OF THE SIDEWALK. |
| C-6: |
| 1. THE INTERIOR OPENING OF THE DUMPSTER ENCLOSURE IS |
| SHOWN TO BE 12.5' WIDE, THIS IS SHOWN ON THE PLAN AND |
| IS CORRECT. BUT, THE NOTE DESCRIBES THE GATES TO BE |
| DESIGNED TO "FIT 10' OPENING & GATE POSTS." WE HAVE HAD |
| PROBLEMS WITH ALLOWING THIS COMMENT IN THE PAST. IT IS |
| NOT OUR RESPONSIBILITY TO PICK OUT EVER SMALL DETAIL, |
| BUT BE WARNED, THE OPENING FOR THE GATES WILL NOT ONLY |
| BE 12.5', THE PLACEMENT OF THE POSTS IS ON THE CENTER |
| LINE OF THE 12" THICK BLOCKS, SO AN ADDITIONAL 10" WILL |
| NEED TO BE ADDED TO THE WIDTH OF THE GATES. BE SURE YOU |
| ORDER THE RIGHT MATERIAL. |
| 2. THE FIRST NOTE FOR THE EXFILTRATION TRENCH NEEDS TO |
| BE CHANGED TO READ "SIDES, BOTTOM, AND TOP OF TRENCH TO |
| BE LINED......." |
| L-1: |
| TREES ARE NOT ALLOWED TO BE PLANTED WITH LESS THAN 5' |
| OF CLEARANCE BETWEEN THE OUTSIDE OF THE TREE ROOT BALL |
| AND THE WATER OR SEWER LINE. THE PLAN SHOWS ONE TREE ON |
| TOP OF THE SANITARY SEWER LATERAL, AND THREE MORE TREES |
| THAT APPEAR TO BE TOO CLOSE. THERE ARE 4 TREES THAT |
| APPEAR TOO CLOSE TO THE WATER SERVICE. REMOVE THE |
| TREES, OR INSTALL PALMS AND USE A ROOT BARRIER BETWEEN |
| THE UTILITY AND ROOT BALL. |
| |