2009-02-22 11:50:44 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. THE ENERGY CALCULATIONS SUBMITTED WERE NOT SIGNED |
| AND SEALED BY THE PERSON WHO PREPARED THEM. THE PERSON |
| PREPARING THE COMPLIANCE CALCULATION SHALL CERTIFY THAT |
| THE PLANS AND SPECIFICATIONS COVERED BY THE |
| CALCULATION, OR AMENDMENTS THERETO, ARE IN COMPLIANCE |
| WITH CHAPTER 13 OF THE FLORIDA BUILDING CODE IN |
| ACCORDANCE WITH FBC-B 13-103.1.1. |
| |
| 2. N COOLING LOAD CALCULATIONS WERE SUBMITTED FOR THIS |
| REVIEW. THIS CALCULATION SHALL BE ATTACHED TO THE CODE |
| COMPLIANCE FORM (ENERGY CALCULATIONS) SUBMITTED TO THE |
| BUILDING DEPARTMENT WHEN THE BUILDING IS PERMITTED IN |
| ACCORDANCE WITH FBC-B 13-407.1.ABC.1.1. |
| |
| 3. DETAIL 3 ON PAGE 6.1 SHOWS R-19 BATT INSULATION AT |
| BOTTOM OF ROOF TRUSSES WHILE THE ROOFING PRODUCT |
| APPROVAL CALLS FOR A BUILT-UP ROOF SYSTEM. WHICH OF |
| THESE IS CORRECT? PLEASE COORDINATE THIS SYSTEM WITH |
| THE ENERGY CALCULATIONS IN ACCORDANCE WITH FBC-B |
| 13-103.2 AND FBC-B 13-404. ALSO, IF DETAIL #3 SHOWS THE |
| CORRECT ASSEMBLY, THE BUILDING???S THERMAL ENVELOPE |
| WOULD BE LOCATED AT THE FIRE-RATED CEILING ASSEMBLY |
| ATTACHED DIRECTLY TO THE BOTTOM OF THE ROOF TRUSSES. |
| THIS WOULD REQUIRE THE SPACE BETWEEN THE ROOF DECK AND |
| THE BOTTOM OF THE TRUSSES TO BE VENTILATED IN |
| ACCORDANCE WITH FBC-B 1203.2. |
| |
| 4. PROVIDE A COMPLETE SITE PLAN SHOWING LOCATIONS AND |
| DISTANCES FROM PROPERTY LINES AND ADJACENT BUILDINGS. |
| THIS INFORMATION IS NEEDED TO DEMONSTRATE COMPLIANCE |
| WITH SETBACK REQUIREMENTS FOR OUTDOOR MECHANICAL |
| APPLIANCES AS WELL AS COMPLIANCE WITH THE INTAKE AND |
| EXHAUST LOCATION REQUIREMENTS OF FBC-M SECTION 401.5 |
| AND CONDENSATE DISPOSAL REQUIREMENTS OF FBC-M 307.2.1. |
| |
| 5. THE OUTSIDE AIR INTAKES FOR AHU-1 AND AHU-2 APPEAR |
| TO BE LOCATED DIRECTLY ADJACENT TO A PARKING LOT OR |
| DRIVEWAY. MECHANICAL AND GRAVITY OUTSIDE AIR INTAKE |
| OPENINGS SHALL BE LOCATED A MINIMUM OF 10 FEET FROM ANY |
| HAZARDOUS OR NOXIOUS CONTAMINANT SUCH AS STREETS, |
| ALLEYS, PARKING LOTS AND LOADING DOCKS IN ACCORDANCE |
| WITH FBC-M 401.5.1. (SEE COMMENT #4 ABOVE) |
| |
| 6. EXHAUST OUTLETS FOR EF-1 AND EF-2 SHALL BE LOCATED |
| SO AS NOT TO CREATE A NUISANCE. EXHAUST AIR SHALL NOT |
| BE DIRECTED ONTO WALKWAYS IN ACCORDANCE WITH FBC-M |
| 401.5.2. (SEE COMMENT #4 ABOVE) |
| |
| 7. CONDENSATE DRAINS FOR AHU-1 THROUGH AHU-3 APPEAR TO |
| BE DISCHARGING INTO PARKING LOT AREAS. CONDENSATE FROM |
| ALL COOLING COILS SHALL BE CONVEYED FROM THE DRAIN PAN |
| OUTLET TO AN APPROVED PLACE OF DISPOSAL. CONDENSATE |
| SHALL NOT DISCHARGE INTO A STREET, ALLEY OR OTHER AREAS |
| SO AS TO CAUSE A NUISANCE IN ACCORDANCE WITH FBC-M |
| 307.2.1. |
| |
| 8. PAGE 9.1 SHOWS THREE CONDENSING UNITS TO BE |
| INSTALLED OUTDOORS. PROVIDE ENGINEERED DETAIL SHOWING |
| HOW CONDENSERS ARE TO BE ATTACHED TO A MINIMUM 3 1/2 |
| INCH CONCRETE SLAB FOR WIND RESISTANCE AND CLEARANCE |
| FROM GRADE IN ACCORDANCE WITH FBC-M 301.13 AND FBC-M |
| 304.9. |
| |
| 9. PROVIDE MANUFACTURER???S SUBMITTAL DATA SHOWING |
| THESE CONDENSING UNITS ARE DESIGNED FOR WIND |
| RESISTANCE. MECHANICAL APPLIANCES THAT ARE EXPOSED TO |
| WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND |
| PRESSURES ON THE EQUIPMENT AS DETERMINED IN ACCORDANCE |
| WITH FBC-M 301.13. |
| |
| 10. ACOUSTICAL CEILING DETAIL ON PAGE 2.1 SHOWS ONLY 19 |
| INCHES BETWEEN BOTTOM OF ROOF TRUSS AND BOTTOM OF |
| ACOUSTICAL CEILING. THIS WOULD NOT LEAVE ENOUGH ROOM |
| FOR 16X16 I.D. RECTANGULAR OR 20 INCH ROUND I.D. FLEX |
| DUCTS BETWEEN THE ACOUSTICAL CEILING AND THE RATED |
| CEILING ASSEMBLY SHOWN ON PLANS. WILL THIS DUCTWORK BE |
| ABOVE THE RATED ASSEMBLY IN THE ROOF TRUSSES? PLEASE |
| CLARIFY AS THIS HAS MUCH POTENTIAL IMPACT ON THE DESIGN |
| OF THE HVAC DUCTWORK, SUCH AS MINIMUM INSULATION |
| R-VALUE REQUIREMENTS OF FBC-B 13-410.1.ABC.2 AND THE |
| REQUIRED PROTECTION OF PENETRATIONS OF FIRE RESISTANCE |
| RATED ASSEMBLIES IN ACCORDANCE WITH FBC-M 607.6. |
| |
| 11. AT ALL OUTSIDE AIR INTAKES: SHOW, AT A MINIMUM, |
| MANUAL VOLUME DAMPERS IN ACCORDANCE WITH FBC-B |
| 13-409.1.1 AND FBC-B 13-409.1.ABC.3.3. |
| |
| 12. WHAT IS THE MEANS OF CONTROL FOR BATHROOM EXHAUST |
| FANS? PLEASE PROVIDE EXHAUST FAN SCHEDULE ON PLANS AND |
| SHOW HOW THEY WILL BE CONTROLLED. EXHAUST FANS SHALL BE |
| INTERLOCKED WITH RESPECTIVE AHU TO ENSURE ALL AIR |
| SUPPLIED TO TOILET ROOMS IS EXHAUSTED IN ACCORDANCE |
| WITH FBC-M 403.2.1 AND SHALL ALSO BE CAPABLE OF BEING |
| CONTROLLED BY THE TOILET ROOM LIGHT SWITCH TO ENSURE |
| THAT VENTILATION IS PROVIDED DURING THE PERIODS THAT |
| THE ROOM IS OCCUPIED IN ACCORDANCE WITH FBC-M 401.3. |
| NOTE: IF AHUS ARE CONTROLLED BY PROGRAMMABLE |
| THERMOSTATS WITH OCCUPIED AND UNOCCUPIED MODES, LIGHT |
| SWITCH INTERLOCK IS NOT REQUIRED. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |