Plan Review Notes
Plan Review Notes For Permit 09010335
Permit Number 09010335
Review Stop M
Sequence Number 1
Notes
Date Text
2009-02-22 11:50:44REVIEW #: 1ST
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. THE ENERGY CALCULATIONS SUBMITTED WERE NOT SIGNED
 AND SEALED BY THE PERSON WHO PREPARED THEM. THE PERSON
 PREPARING THE COMPLIANCE CALCULATION SHALL CERTIFY THAT
 THE PLANS AND SPECIFICATIONS COVERED BY THE
 CALCULATION, OR AMENDMENTS THERETO, ARE IN COMPLIANCE
 WITH CHAPTER 13 OF THE FLORIDA BUILDING CODE IN
 ACCORDANCE WITH FBC-B 13-103.1.1.
  
 2. N COOLING LOAD CALCULATIONS WERE SUBMITTED FOR THIS
 REVIEW. THIS CALCULATION SHALL BE ATTACHED TO THE CODE
 COMPLIANCE FORM (ENERGY CALCULATIONS) SUBMITTED TO THE
 BUILDING DEPARTMENT WHEN THE BUILDING IS PERMITTED IN
 ACCORDANCE WITH FBC-B 13-407.1.ABC.1.1.
  
 3. DETAIL 3 ON PAGE 6.1 SHOWS R-19 BATT INSULATION AT
 BOTTOM OF ROOF TRUSSES WHILE THE ROOFING PRODUCT
 APPROVAL CALLS FOR A BUILT-UP ROOF SYSTEM. WHICH OF
 THESE IS CORRECT? PLEASE COORDINATE THIS SYSTEM WITH
 THE ENERGY CALCULATIONS IN ACCORDANCE WITH FBC-B
 13-103.2 AND FBC-B 13-404. ALSO, IF DETAIL #3 SHOWS THE
 CORRECT ASSEMBLY, THE BUILDING???S THERMAL ENVELOPE
 WOULD BE LOCATED AT THE FIRE-RATED CEILING ASSEMBLY
 ATTACHED DIRECTLY TO THE BOTTOM OF THE ROOF TRUSSES.
 THIS WOULD REQUIRE THE SPACE BETWEEN THE ROOF DECK AND
 THE BOTTOM OF THE TRUSSES TO BE VENTILATED IN
 ACCORDANCE WITH FBC-B 1203.2.
  
 4. PROVIDE A COMPLETE SITE PLAN SHOWING LOCATIONS AND
 DISTANCES FROM PROPERTY LINES AND ADJACENT BUILDINGS.
 THIS INFORMATION IS NEEDED TO DEMONSTRATE COMPLIANCE
 WITH SETBACK REQUIREMENTS FOR OUTDOOR MECHANICAL
 APPLIANCES AS WELL AS COMPLIANCE WITH THE INTAKE AND
 EXHAUST LOCATION REQUIREMENTS OF FBC-M SECTION 401.5
 AND CONDENSATE DISPOSAL REQUIREMENTS OF FBC-M 307.2.1.
  
 5. THE OUTSIDE AIR INTAKES FOR AHU-1 AND AHU-2 APPEAR
 TO BE LOCATED DIRECTLY ADJACENT TO A PARKING LOT OR
 DRIVEWAY. MECHANICAL AND GRAVITY OUTSIDE AIR INTAKE
 OPENINGS SHALL BE LOCATED A MINIMUM OF 10 FEET FROM ANY
 HAZARDOUS OR NOXIOUS CONTAMINANT SUCH AS STREETS,
 ALLEYS, PARKING LOTS AND LOADING DOCKS IN ACCORDANCE
 WITH FBC-M 401.5.1. (SEE COMMENT #4 ABOVE)
  
 6. EXHAUST OUTLETS FOR EF-1 AND EF-2 SHALL BE LOCATED
 SO AS NOT TO CREATE A NUISANCE. EXHAUST AIR SHALL NOT
 BE DIRECTED ONTO WALKWAYS IN ACCORDANCE WITH FBC-M
 401.5.2. (SEE COMMENT #4 ABOVE)
  
 7. CONDENSATE DRAINS FOR AHU-1 THROUGH AHU-3 APPEAR TO
 BE DISCHARGING INTO PARKING LOT AREAS. CONDENSATE FROM
 ALL COOLING COILS SHALL BE CONVEYED FROM THE DRAIN PAN
 OUTLET TO AN APPROVED PLACE OF DISPOSAL. CONDENSATE
 SHALL NOT DISCHARGE INTO A STREET, ALLEY OR OTHER AREAS
 SO AS TO CAUSE A NUISANCE IN ACCORDANCE WITH FBC-M
 307.2.1.
  
 8. PAGE 9.1 SHOWS THREE CONDENSING UNITS TO BE
 INSTALLED OUTDOORS. PROVIDE ENGINEERED DETAIL SHOWING
 HOW CONDENSERS ARE TO BE ATTACHED TO A MINIMUM 3 1/2
 INCH CONCRETE SLAB FOR WIND RESISTANCE AND CLEARANCE
 FROM GRADE IN ACCORDANCE WITH FBC-M 301.13 AND FBC-M
 304.9.
  
 9. PROVIDE MANUFACTURER???S SUBMITTAL DATA SHOWING
 THESE CONDENSING UNITS ARE DESIGNED FOR WIND
 RESISTANCE. MECHANICAL APPLIANCES THAT ARE EXPOSED TO
 WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND
 PRESSURES ON THE EQUIPMENT AS DETERMINED IN ACCORDANCE
 WITH FBC-M 301.13.
  
 10. ACOUSTICAL CEILING DETAIL ON PAGE 2.1 SHOWS ONLY 19
 INCHES BETWEEN BOTTOM OF ROOF TRUSS AND BOTTOM OF
 ACOUSTICAL CEILING. THIS WOULD NOT LEAVE ENOUGH ROOM
 FOR 16X16 I.D. RECTANGULAR OR 20 INCH ROUND I.D. FLEX
 DUCTS BETWEEN THE ACOUSTICAL CEILING AND THE RATED
 CEILING ASSEMBLY SHOWN ON PLANS. WILL THIS DUCTWORK BE
 ABOVE THE RATED ASSEMBLY IN THE ROOF TRUSSES? PLEASE
 CLARIFY AS THIS HAS MUCH POTENTIAL IMPACT ON THE DESIGN
 OF THE HVAC DUCTWORK, SUCH AS MINIMUM INSULATION
 R-VALUE REQUIREMENTS OF FBC-B 13-410.1.ABC.2 AND THE
 REQUIRED PROTECTION OF PENETRATIONS OF FIRE RESISTANCE
 RATED ASSEMBLIES IN ACCORDANCE WITH FBC-M 607.6.
  
 11. AT ALL OUTSIDE AIR INTAKES: SHOW, AT A MINIMUM,
 MANUAL VOLUME DAMPERS IN ACCORDANCE WITH FBC-B
 13-409.1.1 AND FBC-B 13-409.1.ABC.3.3.
  
 12. WHAT IS THE MEANS OF CONTROL FOR BATHROOM EXHAUST
 FANS? PLEASE PROVIDE EXHAUST FAN SCHEDULE ON PLANS AND
 SHOW HOW THEY WILL BE CONTROLLED. EXHAUST FANS SHALL BE
 INTERLOCKED WITH RESPECTIVE AHU TO ENSURE ALL AIR
 SUPPLIED TO TOILET ROOMS IS EXHAUSTED IN ACCORDANCE
 WITH FBC-M 403.2.1 AND SHALL ALSO BE CAPABLE OF BEING
 CONTROLLED BY THE TOILET ROOM LIGHT SWITCH TO ENSURE
 THAT VENTILATION IS PROVIDED DURING THE PERIODS THAT
 THE ROOM IS OCCUPIED IN ACCORDANCE WITH FBC-M 401.3.
 NOTE: IF AHUS ARE CONTROLLED BY PROGRAMMABLE
 THERMOSTATS WITH OCCUPIED AND UNOCCUPIED MODES, LIGHT
 SWITCH INTERLOCK IS NOT REQUIRED.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]