Plan Review Notes For Permit 09010335 |
Permit Number |
09010335 |
|
Review Stop |
ENG |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2009-08-21 10:48:00 | 1. PLAN HAS NOT BEEN APPROVED BY ENGINEERING SERVICE | | DEPARTMENT. THIS IS REQUIRED PRIOR TO APPLYING FOR A | | CONSTRUCTION SERVICES PERMIT. APPROPRIATE PLAN SHEETS | | NEED TO BE SUBMITTED TO ENGINEERING SERVICES FOR | | REVIEW; | | PLAN FOR PARKING LOT WITH STORMWATER CALCULATIONS NEED | | TO BE SUBMITTED. | | TAP FOR SEWER SERVICE (WORK IN ROW) NEEDS TO BE | | CREATED, OR SHOWING TIEING INTO EXISTING WATER SERVICE | | NEEDS TO BE SHOWN, IT IS NOT IN THE SUBMITTAL. | | TAP FOR WATER SERVICE (WORK IN ROW NEEDS TO BE CREATED, | | OR SHOWING TIEING INTO EXISTING WATER SERVICE NEEDS TO | | BE SHOWN, IT IS NOT IN THE SUBMITTAL. | | | | 2. ITEMS THAT APPEAR WRONG: | | THREE SETS OF PLANS SUBMITTED, THE SINGLE SEPARATE SET | | HAS A DIFFERENT PLUMBING LAY-OUT IN IT, WHICH SET OF | | DRAWINGS IS CORRECT. | | WHERE DOES THE ROOF OF THE NEW BUILDING DRAIN TO, IT IS | | NOT SHOWN ON THE PLANS. | | LANDSCAPE PLAN SUBMITTED, BUT NO IRRIGATION PLAN, HOW | | IS IRRIGATION TO BE SERVED, THRU SAME METER, OR A | | SEPARATE METER? TEE, NEEDS TO BE SHOWN ON PLUBING PLAN | | IF PART OF THE SAME SERVICE. | | IRRIGATION SYSTEM WILL NEED TO SHOW FLOW TO EACH ZONE, | | FLOW TO EACH ZONE CAN NOT EXCEED ALLOWABLE FOR METER | | SIZE. | | |
|