Plan Review Notes
Plan Review Notes For Permit 08120427
Permit Number 08120427
Review Stop E
Sequence Number 3
Notes
Date Text
2009-03-25 14:56:40PLANS ROUTED TO DOUG WISE'S OFFICE. THERE IS A NEW C-3
 WHICH PREVIOUSLY HAD ZONING AND ENGINEERING STAMPS.
2009-03-25 14:55:48 
 **** PROVISO ***
  
 ** THIS PROVISO HAS BEEN ISSUED TO PROJECT WITH THE
 FOLLOWING CONDITIONS. ALL ITEMS IN NOTES BELOW MUST BE
 SUBMITTED, REVIEWED AND STAMPED WITH A PASSED STATUS
 BEFORE INSTALLATION OF ELECTRICAL EQUIPMENT OR
 INSPECTIONS.
 ANY INSTALLATION OF EQUIPMENT OR INSPECTIONS IN WHICH
 THE NOTES HAVE NOT BEEN ADDRESSED MAY CREATE A DELAY IN
 THE PROJECT OR REMOVAL OF INSTALLED EQUIPMENT. THIS
 WOULD BE AT THE SOLE RESPONSIBILITY AND EXPENSE OF THE
 CONTRACTORS INVOLVED WITH PROJECT.
  
 1) NOTE: THIS IS THE *THIRD* REQUEST FOR THE
 MANUFACTURES SPECS/CUT SHEETS ON THE TWO PROPOSED MTS
 PANELS/DEVICES AS SHOWN ON RISER. THE POWER PROTECTION
 SPECS WERE SUBMITTED WITH LISTING AS UL 891. THIS DOES
 NOT PROVIDE ANY INFORMATION FOR LISTING OF TRANSFER
 EQUIPMENT.
 THERE ARE NO SUBMITTALS IN PACKAGE FOR ANY OF THE OTHER
 EQUIPMENT AS REQUESTED. THERE IS HOWEVER SPECS FOR THE
 METER CENTER AND OTHER EQUIPMENT WHICH WAS NEVER
 REQUESTED ON ANY OF THE PREVIOUS REVIEWS.
 702.6, 701.7, 110.3, 90.7 ETC
  
 2) NOTE: THE LIGHTING DETAILS ON SHEET E-9 WAS NOT
 REVISED TO SHOW LIGHTING BEING FED TO NEW HOUSE PANEL
 AT THE EQUIPMENT/STRUCTURE LOCATION. NO LIGHTING SHALL
 BE FED FROM HOUSE PANEL AT OFFICE BUILDING.
 THE OVER CURRENT PROTECTION AND CONDUCTORS SHOWN ON E-9
 ARE ALSO NOT THE SAME AS THE NEW ON E-9. PLEASE
 COORDINATE AND REVISE ALL AS NEEDED.
 AS REQUESTED ON PREVIOUS REVIEWS. PLEASE SHOW LOCATIONS
 OF ALL LIGHTING FIXTURES. PLEASE SHOW ALL CIRCUITING ON
 PLANS AND BE SURE THIS INFORMATION IS COORDINATED WITH
 PANEL SCHEDULES.
 408.4, 310.16, 240.4 ETC
  
 3) NOTE: PLEASE BE SURE TO INDICATE THE AIC RATINGS FOR
 ALL EQUIPMENT ON THE RISER/PLANS. ALL EQUIPMENT SHALL
 BE RATED FOR THE AVAILABLE FAULT CURRENT WHETHER FROM
 THE UTILITY TRANSFORMER OR ANY FUTURE GENERATORS. 110.9
  
 PLEASE SUBMIT THE ABOVE INFORMATION AS A REVISION
 BEFORE INSPECTIONS AND INSTALLATION.
 IF THERE ARE ANY QUESTIONS OR IF ANY OF ABOVE COMMENTS
 ARE NOT TYPED IN A CLEAR MANNER, PLEASE DO NOT HESITATE
 IN CONTACTING THIS REVIEWER.
  
 DEWEY PALMER
 BUILDING PLANS EXAMINER II/ ELECTRICAL
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved