Plan Review Notes
Plan Review Notes For Permit 08120369
Permit Number 08120369
Review Stop M
Sequence Number 1
Notes
Date Text
2009-01-24 16:58:46REVIEW #: 1ST
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PROVIDE COMPLETE SUBMITTALS OF PRODUCT APPROVALS FOR
 LOUVERS TO BE USED ON THIS PROJECT, INCLUDING
 INSTALLATION DETAILS. ENSURE PRODUCT APPROVALS ARE
 CURRENT IN ACCORDANCE WITH FAC RULE 9B-72. PRODUCT
 APPROVALS ARE TO BE APPROVED IN WRITING BY THE DESIGNER
 OF RECORD IN ACCORDANCE WITH FBCB 106.3.3.
  
 2. NOTE #13 ON AC-1 CALLS FOR CONDENSATE TO DISCHARGE
 IN PLANTERS. CONDENSATE LINES SHALL DISCHARGE AT LEAST
 1 FOOT AWAY FROM THE STRUCTURE SIDEWALL IN ACCORDANCE
 WITH FBCB 1503.6.
  
 3. ARCHITECTURAL DOOR SCHEDULE CALLS FOR MECHANICAL
 ROOM 105 DOOR TO BE ???FRP.??? DOES THIS REPRESENT
 FIBERGLASS REINFORCED PLASTIC? MATERIALS EXPOSED WITHIN
 PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME
 SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED
 INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE
 WITH ASTM E 84 PER FBCM 602.2.1. PROVIDE A
 NONCOMBUSTIBLE DOOR AT THIS LOCATION OR PROVIDE ASTM
 E84 DATA FOR THE SPECIFIED DOOR.
  
 4. PROVIDE SHUTOFF DAMPER CONTROLS FOR THE AHU1 OUTSIDE
 AIR INTAKE IN ACCORDANCE WITH FBCB 13-409.1.ABC.3.3.
  
 5. FOR OUTDOOR CONDENSING UNITS: APPLIANCES AND
 SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND
 INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT
 AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH FBCM
 301.13. PROVIDE MANUFACTURERS DATA SHOWING THESE
 CONDENSING UNITS DESIGNED FOR WIND RESISTANCE.
  
 6. PROVIDE CONFIRMATION THAT THE CONDENSING UNITS ARE
 TO BE INSTALLED ABOVE BASE FLOOD ELEVATION IN
 ACCORDANCE WITH FBCM 301.14.
  
 7. PROVIDE ADEQUATE DOCUMENTATION FOR ROOFING SYSTEM TO
 BE USED, CONFIRMING THAT MINIMUM R-20 INSULATION SHALL
 BE PROVIDED ABOVE MECHANICAL ROOM 105 AS REQUIRED BY
 THE MECHANICAL SPECIFICATIONS.
 NOTE: MINIMUM R-19 IS REQUIRED IN ACCORDANCE WITH FBCB
 13-404.1.ABC.2.
  
 8. SHOW HOW WALLS OF MECHANICAL ROOM 105 ARE TO BE
 FINISHED IN ACCORDANCE WITH FBCM 603.8 AND 603.9.
  
 9. ALTHOUGH THE DOOR SCHEDULE CALLS FOR GASKETED FRAME
 AND THRESHOLD, IT IS STRONGLY RECOMMENDED THAT A DUCTED
 RETURN AND OUTSIDE AIR BE PROVIDED IN MECHANICAL ROOM
 105 TO AVOID ANY INCIDENTAL RECIRCULATION OF AIR FROM
 THE MENS RESTROOM AREA INTO THE CONDITIONED VISITOR
 CENTER AREAS. THIS CHANGE WOULD ALSO NEGATE SOME OF THE
 REVIEW COMMENTS LISTED ABOVE. RECIRCULATION OF AIR FROM
 THIS AREA IS PROHIBITED IN ACCORDANCE WITH FBCM
 403.2.1.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved