Plan Review Notes For Permit 08120189 |
Permit Number |
08120189 |
|
Review Stop |
Z |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2009-05-27 17:08:45 | FAILED | | | | 1) PROVIDE VERIFICATION OF THE INSTALLATION OF THE | | WESTBOUND LEFT TURN LANE INTO THE PROJECT OR THAT THE | | OKECHOBEE BLVD. CONTRACTOR IS INSTALLING THE TURN LANE | | WITH THE WIDENING CONTRACT. | | | | 2) THE SITE AND LANDSCAPE WORK FOR THIS BUILDING ARE | | REQUIRED AS PART OF THIS PERMIT OR AS A SEPARATE | | PERMIT. IF UNDER A SEPARATE PERMIT, THEN IT SHALL BE | | APPROVED PRIOR TO THE ZONING APPROVAL OF THE INDIVIDUAL | | MODEL. THE WORK SHALL BE COMPLETED PRIOR TO THE USE OF | | THE BUILDING AS A MODEL UNIT. | | | | 3) FIVE PARKING SPACES, ONE OF WHICH SHALL BE ADA | | COMPLIANT, SHALL BE PROVIDED FOR THE MODEL DWELLING | | UNIT. THE DRIVEWAYS MAY BE USED TO MEET THIS | | REQUIREMENT, PROVIDED THAT ALL LANDSCAPE AND THE | | ACCESSIBLE AISLE BE INSTALLED. THE ROADWAY NETWORK TO | | THE PARKING SHALL ALSO BE IN PLACE (CONSTRUCTION SHALL | | HAVE ALL THE REQUIRED PERMITS). | | | | 4) THE PLAT OF THE ENTIRE RESIDENTIAL TRACT, AS WELL AS | | SITE AND LANDSCAPE PLANS SHOWING THE LIMITS OF WORK ARE | | REQUIRED. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1435. |
|