2009-01-14 17:25:48 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL, BUILDING PLANS EXAMINER |
| 561-805-6724 [email protected] |
| |
| FBC FLORIDA BUILDING CODE 2004 |
| FBC EB FLORIDA BUILDING CODE 2004 EXISTING BUILDING |
| CODE |
| FBC R FLORIDA BUILDING CODE 2004 RESIDENTIAL |
| FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004 |
| FAC FLORIDA ADMINISTRATIVE CODE |
| FS FLORIDA STATUTE |
| |
| 1. PLLEASE SEE INSTALLATION SCHEDULE. IN THE COLUMN FOR |
| "SPECIFIC ANCHOR TYPE", THE CONNECTION TYPE HAS BEEN |
| WRITTEN (C2). THIS INFORMATION SHOULD BE IN THE FOURTH |
| COLUMN, AND THIS COLUMN SHOULD SPECIFY THE SPECIFIC |
| ANCHOR TYPE; IN THIS CASE, TAPCONS. |
| |
| 2. WHEN SPECIFYING TAPCONS, IF THE PRODUCT APPROVAL |
| PROVIDES MORE THAN ONE CHOICE, PLEASE SPECIFY WHICH |
| TYPE OF TAPCON. THE PRODUCT APPROVAL FOR ACCORDIONS |
| INCLUDES BOTH ITW AND ELCO TAPCON. |
| |
| 3. 1 3/4" TAPCON SPECIFIED; PLEASE NOTE THAT THIS IS |
| THE EMBEDMENT REQUIREMENT. A LONGER TAPCON MUST BE |
| SPECIFIED DUE TO STUCCO AND OTHER FACTORS SUCH AS TRACK |
| OR PANEL THICKNESS. |
| |
| 4. SEE SHEET 6 OF THE ACCORDION PRODUCT APPROVAL. |
| SEVERAL NUMBERS CIRCLED, MOST WHICH DO NOT APPLY TO |
| THIS JOB. ALSO SEE SHEET3; BUILDOUT DETAIL CIRCLED BUT |
| THIS IS NOT SPECIFIED ON THE INSTALLATION SCHEDULE. IF |
| DETAILS ON THE PRODUCT APPROVAL ARE CIRCLED, THIS |
| ASSISTS WITH BOTH PLAN REVIEW AND INSPECTIONS BUT |
| SHOULD CORRELATE WITH THE INSTALLATION SCHEDULE AND THE |
| JOB. |
| |
| 5. CONCRETE SUBSTRATE SPECIFIED. SEE SHEET 6 OF THE |
| ACCORDION PRODUCT APPROVAL. FOR THE ELCO TAPCON, |
| 3320PSI MINIMUM CONCRETE STRENGTH REQUIRED. IF USING |
| THE ANCHOR SPACING FOR A CONCRETE SUBSTRATE, CONTRACTOR |
| IS TO PROVIDE EVIDENCE THAT THE SUBSTRATE MEETS THIS |
| REQUIREMENT. ALTERNATIVELY, THE CONTRACTOR CAN USE THE |
| HOLLOW BLOCK CHART ANCHOR SPACING ON SHEET 7. |
| |
| 6. CONTRACTOR HAS SPECIFIED ANCHOR SPACING WHICH |
| EXCEEDED THE REQUIREMENTS FOR BOTH CONCRETE AND HOLLOW |
| BLOCK FOR BOTH TYPES OF TAPCONS. THEREFORE, THE PLAN |
| WILL BE REDLINED FOR ITEM #3. |