Date |
Text |
2008-12-16 16:13:09 | DENIED |
| REFERENCE; |
| FBC-2004 FUEL GAS |
| FBC-2004 CHAPTER 1 |
| |
| |
| 1. SHT MP-1 SEPARATE GAS PERMIT REQUIRED. GAS RISER |
| DIAGRAM. THE PIPE SIZE TO THE POOL HEATER SHALL BE |
| 1-1/4" PER TABLE 402.4(20). ALSO CORRECT GAS LOAD |
| CALCULATIONS TABLE. |
| |
| 2. SHT MP-1 GAS NOTES NUMBER ONE SHALL ALSO INDICATE |
| THE 2005, 2006 & 2007 AMENDMENTS TO THE FBC-2004. |
| SECTION 106.1.1. |
| |
| 3. SHT MP-1 GAS NOTES NUMBER EIGHT MAKES A REFERENCE TO |
| A "FUTURE" GENERATOR. THIS IS NOT SHOWN ON THE GAS |
| RISER DIAGRAM. PLEASE CLARIFY. SECTION 106.1.1. |
| |
| 4. SUBMIT CALCULATIONS FOR COMBUSTION |
| AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| GAS CODE SECTION 304. (SEE THE WATER HEATER) |
| |
| 5. PLEASE INDICATE HOW THE MAKEUP AIR FOR THE CLOTHES |
| DRYER IS ADDRESSED. SECTION 304.4. |
| |
| 6. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE |
| THE REVISION & REMOVE & REPLACE ANY |
| PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| WITH A DESCRIPTION OF THE REVISION MADE, |
| IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND |
| WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| ONE SET OF THEM LOOSELY ON TOP OF THE |
| COLLATED PLANS TO BE REVIEWED. |
| THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |
| |