Plan Review Notes
Plan Review Notes For Permit 08110565
Permit Number 08110565
Review Stop E
Sequence Number 3
Notes
Date Text
2009-05-15 14:24:03**DENIED 3RD REVIEW **
  
 1) NOTE: THE PREVIOUS NOTES STATED TO PLEASE BE SURE
 AND UPDATE AND COORDINATE ALL PLANS AND DOCUMENTS WITH
 THE CHANGES OF SITE LIGHTING TO THE BUILDING.
 THE SAME EXACT ENERGY CALCULATIONS WERE SUBMITTED BACK
 WITH NO CHANGES TO THE EXTERIOR LIGHTING IN THE INPUT
 DATA REPORT. PLEASE SEE FBC 13-415.2.ABC.1.3 WHICH
 REQUIRES ALL LIGHTING FOR EXTERIOR PORTIONS TO BE
 FIGURED.
 DO NOT REVISE ONE SHEET ON THE IDR AS WAS SUBMITTED FOR
 BUILDING. THE INFORMATION ON THE IDR WILL AFFECT
 SUMMARY SHEET AND TOTALS ON THE CALCULATIONS. THERE ARE
 MULTIPLE SHEETS IN THE CALCULATIONS SUMMARY AND IDR
 WHICH NEED TO BE REVISED. THE CERTIFICATION SHEETS AS
 WELL ALL NEED TO BE REVISED.
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved