Plan Review Notes
Plan Review Notes For Permit 08110509
Permit Number 08110509
Review Stop B
Sequence Number 1
Notes
Date Text
2008-11-25 15:03:10RESIDENTIAL (R3) SHUTTERS, BUILDING REVIEW CHECKLIST.
 REVIEW UNDER 2004 FLORIDA RESIDENTIAL CODE WITH 2007
 REVISIONS.
  
 1- PROVIDE COMPLETE INSTALLATION SCHEDULE AS REQUIRED
 BY CITY'S IMPLEMENTATION STANDARD FOR WIND-BORNE DEBRIS
 IMPACT PROTECTION. SEE ATTACHED COPY.
 PLEASE MAKE SURE ALL INFORMATION IS PROVIDED TO AVOID
 UNNECESSARY DELAYS.
  
 2- CLEARLY IDENTIFY TOP AND BOTTOM CONNECTIONS. #1 WALL
 MOUNTING INSTALLATION WAS HIGHLIGHTED ON SHEET 5 OF 14
 OF DRAWING 06-015 SUBMITTED.
 NOTE: #1 ONLY APPLIES TO POURED CONCRETE APPLICATIONS
 ONLY. IF OPENING LINTEL IS PRECAST LINTEL OR POURED TIE
 BEAM, THEN THE POURED CONCRETE MOUNTING CONDITION AND
 THE ANCHOR SCHEDULE FOR POURED CONCRETE MAY BE USED. ON
 THE OTHER HAND, WINDOW SILLS ARE NOT TYPICALLY POURED
 CONCRETE BUT FILL CELLS. USE WALL MOUNTING CONDITIONS
 AND ANCHOR SCHEDULE FOR CONCRETE BLOCK INSTALLATION.
 OTHERWISE, PROVIDE PROOF THAT OPENING SILL IS POURED
 CONCRETE WITH THE REQUIRED STRENGTH AS REQUIRED TO USE
 THE POURED CONCRETE TABLES. SEC. 106.1.2 CITY
 AMENDMENTS TO FBC 2004 TO VERIFY COMPLIANCE WITH THE
 DESIGN PRESSURES OF SEC. R301 AND COMPLIANCE WITH
 PRODUCT APPROVAL.
  
 3- PROVIDE RECORDED NOTICE OF COMMENCEMENT AS REQUIRED
 BY SEC. 713.13 FLORIDA STATUTE.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712