2008-12-17 12:00:28 | ***** PASSED WITH PROVISOS ***** |
| |
| #1 PLANS DATED 11/20/08 REFLECT PIPING IN THE R.O.W., |
| THIS IS UNACCEPTABLE! |
| #2 SEE PLANS DATED 11/20/08, I HAVE APPROVED AS |
| REDLINED. PRIVATE PIPING (ON-SITE PIPING MUST STAY |
| ON-SITE OR HUG PROPERTY LINE |
| UNTIL POINT OF CONTACT WITH SEWER LATERAL TIE-IN. ONE |
| CLEAN-OUT IS REQUIRED. |
| #3 (PLUMBING PLAN REVIEW HAS BEEN ADVISED OF THE |
| APPROVAL) |
| #4 CLEAN-OUT MUST HAVE A RING AND COVER AS PER CITY OF |
| WPB APPROVED MATERIAL LIST |
| HTTP://WWW.CITYOFWPB.ORG/ENGINEERING/UPLOADS/2008-10-24 |
| -16-12-10-APPROVEDMATERIALSLIST10-24-08.PDF |
| #5 RIGHT OF WAY PERMIT MUST BE UP TO DATE AND |
| CONTRACTOR MUST CALL FOR INSPECTION PRIOR TO POURING |
| CONCRETE. |
| #6 PLUMBING INSPECTION OF PIPING AND ELEMENTS WITHIN |
| PROXIMITY OF THE ROW MUST ALSO BE CALLED IN AND |
| CLEARED. |
| #7 SIDEWALK MUST MEET ADA ACCESABILITY STANDARDS AND |
| SLOPE. |
| |
| MANUEL J GONZALEZ, PROJECT COORDINATOR |
| LOCATION ADDRESS: |
| CITY OF WEST PALM BEACH |
| ENGINEERING SERVICES DEPARTMENT |
| 1000 - 45TH STREET, SUITE 15 |
| WEST PALM BEACH FL 33407 |
| MAILING ADDRESS: |
| CITY OF WEST PALM BEACH |
| ENGINEERING SERVICES DEPARTMENT |
| P.O. BOX 3506 |
| WEST PALM BEACH FL 33401 |
| TELEPHONE: |
| 45TH STREET OFFICE : 561-494-1040 |
| 45TH DIRECT: 561-494-1085 |
| FAX: 561-494-1117 |
| CITY HALL OFFICE: (561) 805-6723 |
| CITY HALL DIRECT: (561) 805-6327 |
| CITY HALL FAX: (561) 805-6731 OR 805-6676 |
| NEXTEL: 561-644-7301 |
| NEXTEL DIRECT CONNECT: 159*28165*38 |
| EMERGENCIES: |
| CENTRAL OPERATIONS CENTER (DISPATCH) 561-822-2210 |
| E-MAIL: |
| [email protected] |
| |
| |
| |
| |
| |