2008-11-14 15:09:21 | RESIDENTIAL (R3) SHUTTERS BUILDING REVIEW CHECKLIST. |
| REVIEW UNDER 2004 FLORIDA RESIDENTIAL CODE WITH 2007 |
| REVISIONS. |
| |
| 1- ACCORDION SHUTTERS PRODUCT APPROVAL FL5133: |
| SHEETS SUBMITTED ARE 1 THRU 8 OF 16 OF DRAWING 05-208. |
| THEY ARE FOR MID-RISE BERTHA ACCORDION SHUTTERS. THIS |
| HOUSE IS A ONE STORY BUILDING, NOT A MID-RISE BUILDING. |
| NEED TO PROVIDE PROPER DRAWINGS (9 THRU 16 OF 16) WHICH |
| ARE THE DRAWINGS THAT APPLY TO THIS PROJECT. |
| |
| 2- INSTALLATION SCHEDULE SUBMITTED FOR ACCORDION |
| SHUTTERS: CLEARLY IDENTIFY SUBSTRATE WHERE SHUTTERS ARE |
| GOING TO BE ATTACHED. EG: CONCRETE, CONCRETE BLOCK OR |
| WOOD. COLUMN WAS LEFT BLANK. NEED THIS INFORMATION TO |
| VERIFY COMPLIANCE WITH PRODUCT APPROVAL AND DESIGN |
| PRESSURES AS REQUIRED BY SEC. R301 OF 2004 FLORIDA |
| RESIDENTIAL CODE. |
| NOTE: TOP AND BOTTOM SUBSTRATE MUST BE POURED CONCRETE. |
| FILLED CELLS DON'T COUNT AS CONCRETE. NEED TO USE |
| MASONRY ANCHOR SCHEDULE OR PROVIDE PROOF/TESTING THAT |
| FILLED CELLS HAVE THE SAME OR MORE STRENGTH THAN |
| CONCRETE. |
| |
| 3- STORM PANELS: |
| A) FOR A 122" PANEL SPAN NEED TO USE CORRECT ANCHOR |
| SCHEDULE. SEE ANCHOR SCHEDULE ON SHEET 11 OF 17 AND |
| REVISE INSTALLATION SCHEDULE AS REQUIRED. |
| B) CLEARLY MARK SPECIFIC CONNECTION AT TOP AND BOTTOM. |
| EG: 3A (TOP) AND 2(BOTTOM). |
| C) CLEARLY IDENTIFY SUBSTRATE TO RECEIVE SHUTTERS AT |
| TOP AND BOTTOM. EG: CONCRETE OR MASONRY. |
| NOTE: FILLED CELLS NEED TO USE MASONRY ANCHOR SPACING |
| OR PROVIDE PROOF THAT FILLED CELLS ARE EQUIVALENT OR |
| STRONGER THAN POURED CONCRETE. |
| D) REVISE PANEL SPAN ON INSTALLATION SCHEDULE |
| SUBMITTED. IF THE EDGE DISTANCE IS 3.5", THEN THE PANEL |
| SPAN NEEDS TO BE COORDINATED WITH THE OPENING SIZE AND |
| THE EDGE DISTANCE. EDGE DISTANCE DOESN'T INCLUDE STUCCO |
| THICKNESS. ALSO, THE EDGE DISTANCE IS TO THE CENTER OF |
| THE ANCHOR. PANEL SPAN NEEDS TO BE INCREASED AS |
| REQUIRED. |
| E) IF BOTTOM CONNECTION IS ON MASONRY, THEN THE MASONRY |
| ANCHOR SPACING NEEDS TO BE USED. REVISE INSTALLATION |
| SCHEDULE AS REQUIRED. |
| F) CLARIFY HOW ARE SHUTTERS GOING TO BE INSTALLED |
| VERTICALLY OR HORIZONTALLY. INSTALLATION SCHEDULE |
| SUBMITTED SAYS VERTICAL BUT SHUTTER SPAN IS 122" WHICH |
| IS ON THE HORIZONTAL INSTALLATION. |
| NOTE: THIS ALSO AFFECTS THE CONNECTIONS TOP AND BOTTOM |
| SINCE HEADERS CAN'T BE INSTALLED ON HORIZONTAL |
| APPLICATIONS. |
| |
| JULIO GOMEZ |
| BUILDING PLANS EXAMINER |
| (561)805-6712 |