Plan Review Notes
Plan Review Notes For Permit 08100593
Permit Number 08100593
Review Stop ENG
Sequence Number 2
Notes
Date Text
2009-01-05 12:03:41WHEN CONTACTING THE REVIEWER PLEASE REFERENCE THE
 PERMIT NUMBER.
 IF YOU HAVE ANY QUESTIONS PLEASE FEEL FREE TO CONTACT
 THE REVIEWER:
 DEAN S. LAUDERMILK, PROJECT COORDINATOR
 LOCATION ADDRESS:
 CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 1000 - 45TH STREET, SUITE 15
 WEST PALM BEACH FL 33407
 MAILING ADDRESS:
 CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 P.O. BOX 3506
 WEST PALM BEACH FL 33401
 TELEPHONE:
 45TH STREET OFFICE : 561-494-1041
 45TH DIRECT: 561-494-1083
 FAX: 561-494-1117
 CITY HALL OFFICE: (561) 805-6723
 CITY HALL DIRECT: (561) 805-6327
 CITY HALL FAX: (561) 805-6731 OR 805-6676
 NEXTEL: 561-644-7338
 NEXTEL DIRECT CONNECT: 159*28165*75
 EMERGENCIES:
 CENTRAL OPERATIONS CENTER (DISPATCH) 561-822-2210
 E-MAIL:
 [email protected]
 FAILED.
 OUTSTANDING ISSUES FROM PREVIOUS REVIEW NOT COMPLETED:
 ITEM #2: PLAN HAS NOT BEEN SUBMITTED TO ENGINEERING
 SERVICES FOR REVIEW.
 ITEM #4 & 6: THE SURVEY IS INCOMPLETE. IT SHOWS NO
 UNDERGROUND EXISTING UTILITY LINES, INCLUDING THE 9
 PLUS OUTFALLS THRU THE SEAWALL. THIS PLAN (SHEET S2)
 SHOWS THE PIER TO BE BUILT ON TOP OF THE 48? OUTFALL
 THRU THE SEAWALL. IF THIS IS WHERE THE OUTFALL IS THEN
 MOVE THE PIER A MINIMUM OF 5? TO THE SIDE OF THE
 OUTFALL OR SHOW REPLACING THE PIPE FROM THE NEW SEAWALL
 30? WEST.
 ITEM #5: ONLY PARTIALLY COMPLETED. EXISTING STORM LINES
 NEED TO BE CUT BACK 10? AND THE PIPE NEEDS TO BE
 REPLACED, THEN A CONCRETE COLLAR NEEDS TO BE POURED
 (SEE S13).
 ITEM #8: THE DETAIL SUPPLIED (SHEET S11) IS
 UNACCEPTABLE. THERE IS A GAP OF APPROXIMATELY 5? WHERE
 THE OLD SEAWALL REMAINS. THERE IS A KEYWAY IN THE
 EXISTING SHEET WALL THAT THE NEW SEAWALL NEEDS TO BE
 BUILT TO. THE KEYWAY IS NOT ?AS SHOWN? ON SHEET S11,
 BUT IS FLUSH WITH THE PILE. THE CONCRETE BEHIND THE
 SHEET WALL IS TEMPORARY AND WAS DESIGNED TO BE REMOVED
 SO FILTER FABRIC CAN GO IN BEHIND THE TIE-IN.
 ITEM #12: POLLUTION CONTROL PLAN FOR THE LAND SIDE
 NEEDS TO BE SUBMITTED. A PLAN WAS EMAILED TO M.
 GONZALEZ, BUT IT DOES NOT MEET THE CRITERIA LISTED IN
 THE LAST REVIEW.
  
 NEW ISSUES:
 1) SHEET S12: A) THE PLAN SHOWS THE TURBIDITY BARRIERS
 TO BE INSTALLED WITH THE CONSTRUCTION BARGE ON THE
 BARRIER, THIS CAN NOT BE ALLOWED, THE BARGE NEEDS TO BE
 INSIDE IN BOTH EXAMPLES SHOWN, OTHERWISE THE DISTURBED
 WATER CAN FLOW UNDER THE BARGE. B) ?SANITARY SEWER? IS
 NOTED TO BE INSTALLED THRU SEAWALL, AND ONLY DOCK ?C?
 IS TO HAVE A FORCE MAIN. PER BOHLER ENGINEERING PLANS
 SUBMITTED TO ENGINEERING SERVICES, EACH OF THE DOCKS
 WILL HAVE A FORCE MAIN AND NONE OF THEM WILL HAVE A
 SANITARY LINE.
  
  
  