Plan Review Notes
Plan Review Notes For Permit 08090593
Permit Number 08090593
Review Stop E
Sequence Number 1
Notes
Date Text
2008-10-22 09:06:59 
 ** DENIED REVIEW**
  
  
  
  
 1) NOTE: PLANS HAVE ONLY BEEN SUBMITTED FOR PLAN REVIEW
 AND NOT FOR PERMIT. EVEN ONCE ALL COMMENTS HAVE BEEN
 ADDRESSED AND PERMIT APPLICATION BY A LICENSED
 CONTRACTOR HAS NOT BEEN MADE THE REVIEW WOULD STILL
 REMAIN IN A FAILED STATUS. THERE ARE SEVERAL ITEMS FOR
 LICENSING WHICH IS VERIFIED AT A LATER DATE WHEN
 APPLICATION HAS BEEN MADE.
  
 2) NOTE: THE PROJECT INFORMATION HAS BEEN SENT TO
 ADDRESSING FOR REVIEW. THE PLANS DO NOT INDICATE ANY
 ADDRESS ON THE TITLE BLOCKS AND TWO SEPARATE BUILDINGS
 ARE BEING CONSTRUCTED. KEEP IN MIND IF THESE TWO
 SEPARATE STRUCTURES ARE SUBMITTED ON THE SAME PLANS
 UNDER ONE PERMIT A CERTIFICATE OF OCCUPANCY,
 INSPECTIONS FINALS ETC WOULD BE FOR BOTH. IT WOULD NOT
 BE POSSIBLE TO CO ONE WITH OUT THE OTHER. IF TWO PERMIT
 APPLICATIONS ARE MADE, ONE FOR EACH BUILDING THIS WOULD
 ALLOW EACH TO CONTAIN A CO ETC.
 PLEASE BE SURE ONCE THE ADDRESS FOR EACH BUILDING IS
 ASSIGNED THE TITLE BLOCKS REFLECT EACH.
 61G15-23.002, 61G1-16.004
 FBC 106.1, 106.5
  
 3) NOTE: PLEASE SUBMIT ENERGY CALCULATIONS AND LIGHTING
 PERFORMANCE CALCULATIONS IN COMPLIANCE WITH THE FBC
 13-415.2.ABC.1.1, .1.2 AND .1.3. PLEASE SEE 13-400,
 13-415 ETC
 AS NO CALCULATIONS OR PERFORMANCE CALCULATIONS WERE
 SUBMITTED NO REVIEW OF THESE ITEMS COULD BE DONE.
  
 4) NOTE: PLEASE BE SURE THE FOLLOWING CODES ARE LISTED
 ON THE ELECTRICAL PLANS.
 2004 FBC W/2007 REVISIONS.
 2005 NFPA-70
 2003 NFPA-101
 2002 NFPA-110
  
 5) NOTE: PLEASE KNOW THAT ALL LOW VOLTAGE SYSTEMS ARE
 REQUIRED TO BE UNDER A SEPARATE PERMIT. IF THE PLANS
 SHOW ALL OF THE EQUIPMENT THEN THEY MAY BE REFERENCED
 FOR A TURN AROUND PERMIT ONCE THE BASE BUILDING
 PERMIT(S) ARE ISSUED.
  
 6) NOTE: PLEASE SUBMIT THE MANUFACTURES SPECS/CUT
 SHEETS FOR THE GENERATOR, ATS AND OTHER EQUIPMENT SUCH
 AS THE FUEL TANK. THE FUEL TANKS WILL BE UNDER THE
 REVIEW OF OTHER TRADES.
 110.3, 90.7
 FBC 106.1.2
  
 7) NOTE: PLEASE PROVIDE INFORMATION ON PLANS THAT THE
 MOTORIZED GATES HAVE A FAIL SAFE OR BACK UP FOR
 OPERATION IN THE EVENT OF POWER FAILURE. SEE FIRE
 MARSHAL REVIEW. THIS IS NOTED AS THIS WILL AFFECT THE
 ELECTRICAL PLANS.
  
 8) NOTE: PLEASE PROVIDE A GROUNDING ELECTRODE
 RISER/ATTACHMENT LOCATION FOR ALL TRANSFORMERS.
 250.66,250.50.250.58 ETC
  
 9) NOTE: PLEASE SEE THE LIGHTING CONTROLS TO MEET FBC
 13-415.1.1, .1.2 AND .1.3 ARE IN QUESTION FOR MORE
 INFORMATION. WHAT DOES THE SWITCH 1 DO? THE NOTE ON THE
 PLANS MENTIONS OPERATION HOWEVER DOES THIS DEVICE STILL
 CONTAIN AN AUTOMATED OPERATION TO TURN LIGHTING OFF
 ONCE AN OCCUPANT IS NO LONGER IN THE SPACE?
 PLEASE SEE THE BREAK ROOMS AND OTHER ROOMS SUCH AS
 TRAINING ROOMS MUST MEET 13-415.1.ABC.1.2. ( AREAS 114,
 115 ETC)
 IN LOCATIONS SUCH AS MULIT0GNAG BATH ROOMS PLEASE
 INDICATE THE AUTOMATED DEVICES FOR LIGHTING CONTROLS
 WITH DUAL TECHNOLOGY. IF DEVICE WAS MOTION ONLY THIS
 WOULD AFFECT OTHER AREAS IN THE SAME BATHROOMS WHICH
 MAY BE OCCUPIED YET NO MOTION COULD BE DETECTED.
  
 10) NOTE: PLEASE INDICATE THE CIRCUITING FOR THE
 EMERGENCY BATTERY BACK UP IN ROOM 117 (LADIES
 BATHROOM). 700.12F
  
 11) NOTE: PLEASE SUBMIT PHOTO-METRICS FOR EGRESS PATHS
 UNDER EMERGENCY BACK UP CONDITIONS. THE LIGHTING LEVELS
 UNDER NORMAL ARE NOT NEEDED AS THEY ARE CLEARLY
 SUFFICIENT HOWEVER THE LIGHTING LEVELS UNDER EMERGENCY
 IN SOME AREAS ARE IN QUESTION. PLEASE SEE NFPA-101
 7.9.1 WHICH PERMITS 1FT CANDLE UNDER EMERGENCY
 CONDITIONS.
 FBC 106.1.1, 106.1.2 FOR ADDITIONAL INFORMATION AND
 CLARIFICATION.
  
 12) NOTE: PLEASE VERIFY ALL DISCONNECTING MEANS AT THE
 DETACHED ROOF STRUCTURE PER 225.31-225.39.
 ( MAY BE A SNAP SWITCH)
 GROUNDING REQUIRED PER 250.32 ALREADY SHOWN.
  
 13) NOTE: PLEASE CLARIFY THE SERVER ROOM. IF THIS IS AN
 IT ROOM PLEASE BE SURE ALL ITEMS LISTED IN 645.2 ARE
 MET IN ORDER FOR WIRING METHODS PERMITTED IN 645 TO BE
 USED. IF THESE ITEMS ARE NOT MET THE WIRING METHODS
 WHICH ARE PERMITTED IN 645 ARE NOT PERMITTED TO BE USED
 AND THIS MAY AFFECT FUTURE EQUIPMENT INSTALLATION AND
 WIRING. PLEASE PLACE NOTE ON PLANS THAT WILL STATE:
 *THIS IS NOT AN IT ROOM AND WIRING METHODS OF NEC 645
 ARE NOT PERMITTED*. OR WORDS TO THAT AFFECT.
  
 14) NOTE: PLEASE BE SURE LIGHT POLES ARE STATING THE
 WIND LOAD RATINGS AS NOTED IN THE FBC. THE LIGHT POLE
 CALCULATIONS WILL BE UNDER BUILDING/STRUCTURAL REVIEW.
 THIS IS NOTED FOR INFORMATION ONLY.
  
 15) NOTE: PLEASE COMPLETE ALL ROOM AND AREA
 DESIGNATIONS ON PLANS. THIS MAY BE ALPHA OR NUMERIC.
 MOST AREAS SHOW BOTH AT THIS TIME.
 PLEASE BE SURE THE PANEL SCHEDULES ARE SPECIFIC TO
 ROOMS AND AREAS IN WHICH THEY FEED. FOR EXAMPLE SIMPLY
 STATING *RECEPTACLES* OR * LIGHTING* IS NOT ACCEPTABLE.
 PLEASE SEE THE CHANGE IN THE 2005 NEC (HANDBOOK) WHICH
 EXPLAINS THE CHANGE IN 408.4 FOR MORE SPECIFIC
 DESIGNATIONS. THIS IS NOT ONLY FOR ON-SITE HOWEVER ALSO
 FOR RECORD PLANS.
 THIS WOULD INCLUDE THE CIRCUIT FOR ROLL UP DOOR AT
 MAINT BUILDING.
 FBC 106.1.1, 106.5
  
 16) NOTE: PLEASE SEE THE PLANS SHOW A CIRCUIT TO
 GENERATOR ENCLOSURE HOWEVER BUT NOT FOR A PARTICULAR
 PURPOSE. THE PLANS ALSO SHOW AT THE GENERATOR A
 DESIGNATION TO THE PANEL HOWEVER NOT THE CIRCUIT. IF
 THIS CIRCUIT IS FOR A BATTERY CHARGER, BLOCK HEATER ETC
 PLEASE CHECK WITH THE MANUFACTURE OF ANY PARTICULAR
 GENERATOR AS THEY ARE USUALLY DEDICATED CIRCUITS. BLOCK
 HEATERS CAN BE AS HIGH AS 1500WATTS WHICH WOULD NOT
 PERMIT THE BATTERY CHARGER TO BE ON THE SAME CIRCUIT.
 408.4, 220 ETC
 FBC 106.1.2, 106.1.1
  
 17) NOTE: PLEASE SEE ELECTRICAL ROOM 109 AS THIS STATES
 A LINE NOTE FROM THE TRANSFORMER TO *LP-OP2* HOWEVER
 BASED ON RISER AND DESIGNATION ALREADY USED FOR
 TRANSFORMER IN ROOM 113 THIS IS CONFUSING.
 PLEASE CLARIFY HOW BOTH HAVE THE SAME DESIGNATION?
 FBC 106.1.1,
 NEC 230,450,215 ETC GENERAL COORDINATION
  
 18) NOTE: PLEASE SUBMIT LOAD CALCULATIONS FOR THE
 MDP-OP. AS NO LOADS ARE SHOWN IT IS NOT POSSIBLE TO
 DETERMINE CODE COMPLIANCE FOR ALL EQUIPMENT INCLUDING
 THE LOAD ON THE GENERATOR AND WHETHER OR NOT THE
 GENERATOR IS OF SUFFICIENT SIZE.
 220, 702.5 ETC
 FBC 106.1.1, 106.1.2
 PLEASE BE SURE TO INDICATE ALL CONTINUOUS LOADS AND
 LARGEST MOTOR LOADS AT 125%.
 215.3,230.42
  
 19) NOTE: PLEASE KNOW AS THERE IS INFORMATION NOT YET
 SUBMITTED FOR REVIEW THERE MAY VERY WELL BE NEW
 COMMENTS ON THE FOLLOWING REVIEW WHICH CAN NOT BE MADE
 AT THIS TIME.
  
  
  
  
  
 **IMPORTANT**
 ONCE AUDIT/REVIEWS ARE COMPLETE AND PLANS ARE PICKED UP
 FOR CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE
 ALL OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING.
 DO NOT LEAVE ANY OLD/VOIDED SHEETS IN SETS.
 PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY
 ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS,
 SPEC/CUT SHEETS, CALCULATIONS ETC SHOULD BE PLACED INTO
 TWO SETS/FOLDERS/BINDERS ETC.
 PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP IN THE AUDIT/REVIEW PROCESS AND AVOID
 ANY DELAYS.
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANOR PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  