Date |
Text |
2008-09-30 16:53:27 | REVIEW #: |
| ACTION: |
| |
| FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. PAGE A.02: THERE ARE SEVERAL SYMBOLS ON THE |
| REFLECTIVE CEILING PLAN WHICH DO NOT APPEAR ON THE |
| SYMBOL LEGEND. PLEASE PROVIDE CLARIFICATION AND |
| IDENTIFICATION OF EACH ITEM TO BE INSTALLED IN THE |
| CEILING. THIS CEILING SPACE IS TO SERVE AS A RETURN AIR |
| PLENUM AND ALL ITEMS IN THIS PLENUM MUST BE IDENTIFIED |
| TO DEMONSTRATE COMPLIANCE WITH FBCM 602.2. |
| |
| 2. PAGE A.02: NOTE ON THIS PAGE INDICATES R-19 |
| INSULATION TO BE INSTALLED ABOVE THE CEILING. THIS |
| CEILING SERVES AS A PLENUM AND THEREFORE THE INSULATION |
| AND THERMAL BARRIER MUST BE ABOVE THE PLENUM SPACE. |
| CAVITIES BENEATH A ROOF DECK WHICH WILL BE USED AS |
| SUPPLY OR RETURN PLENUMS SHALL HAVE AN INSULATED ROOF. |
| THE INSULATION SHALL HAVE AN R-VALUE OF AT LEAST R-19 |
| IN ACCORDANCE WITH FBCB 13-404.1.ABC.2. ALSO, ROOF |
| INSULATION SHALL NOT BE INSTALLED ON A SUSPENDED |
| CEILING WITH REMOVABLE CEILING PANELS IN ACCORDANCE |
| WITH FBCB 13-404.1.ABC.1. |
| |
| 3. KITCHEN EXHAUST SYSTEM: THERE IS NOT ENOUGH |
| INFORMATION PROVIDED WITH THIS SUBMITTAL TO DO A |
| THOROUGH REVIEW OF THE COMMERCIAL KITCHEN GREASE |
| EXHAUST SYSTEM. SEPARATE PLANS AND PERMIT APPLICATIONS |
| WILL BE REQUIRED FOR THE HOOD AND HOOD SUPPRESSION |
| SYSTEMS. HOWEVER, THE FOLLOWING CONDITIONS ARE EVIDENT |
| ON THESE PLANS AND SHALL BE ADDRESSED PRIOR TO PERMIT |
| ISSUANCE: |
| |
| 4. EXHAUST OUTLETS SHALL BE PERMITTED TO TERMINATE |
| THROUGH EXTERIOR WALLS WHERE THE SMOKE, GREASE, GASES, |
| VAPORS, AND ODORS IN THE DISCHARGE FROM SUCH |
| TERMINATIONS DO NOT CREATE A PUBLIC NUISANCE OR A FIRE |
| HAZARD IN ACCORDANCE WITH FBCM 506.3.12.2. SINCE THIS |
| FAN DOES NOT APPEAR TO BE IN A LOCATION ACCESSIBLE TO |
| THE PUBLIC, FIRE HAZARD IS THE PRIMARY CONCERN HERE, |
| ALTHOUGH GREASE ACCUMULATION ON WALKING SURFACES MAY |
| ALSO CREATE A HAZARD. |
| |
| 5. EXHAUST OUTLETS SHALL BE LOCATED NOT LESS THAN 10 |
| FEET ABOVE THE ADJOINING GRADE LEVEL IN ACCORDANCE WITH |
| FBCM 506.3.12.3. BASED ON THE HEIGHT OF THE BALCONY |
| ABOVE IT DOES NOT APPEAR FEASIBLE TO INSTALL A FAN |
| WHERE THE BOTTOM OF THE FAN WILL BE A MINIMUM OF 10 |
| FEET ABOVE GRADE. |
| |
| 6. EXHAUST FANS SHALL BE POSITIONED SO THAT THE |
| DISCHARGE WILL NOT IMPINGE ON THE ROOF, OTHER EQUIPMENT |
| OR APPLIANCES OR PARTS OF THE STRUCTURE IN ACCORDANCE |
| WITH FBCM 506.5.2. THE LOCATION OF THE FAN AS SHOWN ON |
| THE PLANS WILL BE DIRECTLY ADJACENT TO THE ROOF/BALCONY |
| ABOVE, PROMOTING GREASE ACCUMULATION ON THE STRUCTURE |
| AND CREATING A FIRE HAZARD. SEE ALSO COMMENT 3A ABOVE. |
| |
| 7. EXHAUST AIR SHALL NOT BE DIRECTED ONTO WALKWAYS IN |
| ACCORDANCE WITH FBCM 401.5.2. |
| |
| 8. DETAIL #9 ON PAGE M0.5 SHOWS THE KITCHEN EXHAUST |
| DUCT SIZED AT 16X20. WITH A VOLUME OF 1930 CFM AS SHOWN |
| ON THE EQUIPMENT SCHEDULE, THE VELOCITY OF THE EXHAUST |
| AIR WITHIN THE GREASE DUCT WILL BE APPROXIMATELY 869 |
| FPM. GREASE DUCT SYSTEMS SERVING A TYPE I HOOD SHALL BE |
| DESIGNED AND INSTALLED SO AS TO PROVIDE AN AIR VELOCITY |
| WITHIN THE DUCT SYSTEM OF NOT LESS THAN 1,500 FEET PER |
| MINUTE AND NOT GREATER THAN 2,500 FEET PER MINUTE IN |
| ACCORDANCE WITH FBCM 506.3.4. |
| |
| 9. THE AIR BALANCE SCHEDULE DOES NOT CORRESPOND WITH |
| THE INFORMATION ON FLOOR PLANS AND SCHEDULES. EXAMPLE: |
| THERE IS NO INFORMATION ON THE PLANS REGARDING THE BATH |
| EXHAUST, UTILITY EXHAUST OR WATER HEATER EXHAUST. THESE |
| APPLIANCES SHALL BE LISTED IN THE EQUIPMENT SCHEDULE IN |
| ACCORDANCE WITH FBCB 106.3.5 AND FBCM 301.1. |
| |
| 10. THE REFLECTIVE CEILING PLAN SHOWS A RETURN AIR |
| GRILL IN THE KITCHEN ADJACENT TO THE KITCHEN HOOD. AS |
| THIS UNIT PROVIDES AIR FOR STORAGE, OFFICE AND RESTROOM |
| SPACES, IT IS NOT DEDICATED TO THE KITCHEN AREA |
| EXCLUSIVELY. RETURN AIR INTAKE SHALL BE PROHIBITED IN |
| NON-DEDICATED KITCHEN HVAC SYSTEMS IN ACCORDANCE WITH |
| FBCM 407.1. |
| |
| 11. PAGE M0.4 FLOOR PLAN SHOWS CEILING MOUNTED EXHAUST |
| FANS IN BATHROOM AND UTILITY ROOM. PLAN ALSO INDICATES |
| A POWER VENT TYPE SYSTEM FOR THE WATER HEATER. THESE |
| SYSTEMS CAN NOT BE INSTALLED IN A RETURN AIR PLENUM |
| CEILING. EXHAUST DUCTS UNDER POSITIVE PRESSURE, |
| CHIMNEYS, AND VENTS SHALL NOT EXTEND INTO OR PASS |
| THROUGH PLENUMS IN ACCORDANCE WITH FBCM 601.3. |
| |
| 12. PLEASE IDENTIFY ON PLANS THE LOCATION OF EACH FIRE |
| DAMPER AT EACH DUCT PENETRATION OR TRANSFER OPENING. |
| THE SPECIFIC LOCATION AND INSTALLATION DETAILS OF EACH |
| FIRE DAMPER, CEILING DAMPER AND SMOKE DAMPER SHALL BE |
| SHOWN AND PROPERLY IDENTIFIED ON THE BUILDING PLANS BY |
| THE DESIGNER IN ACCORDANCE WITH FBCM 607.8. |
| |
| 13. MECHANICAL PLAN INDICATES GAS WATER HEATER IN THE |
| UTILITY ROOM WITH POWER VENT. PLUMBING AND |
| ARCHITECTURAL PLANS SHOW THIS WATER HEATER IN THE |
| MECHANICAL ROOM WHICH SERVES AS A RETURN AIR PLENUM. |
| WHICH IS CORRECT? COMBUSTION WATER HEATERS AND |
| ATMOSPHERIC COMBUSTION FURNACES SHALL NOT BE LOCATED IN |
| MECHANICAL CLOSETS USED AS RETURN AIR PLENUMS IN |
| ACCORDANCE WITH FBCM 603.9. |
| |
| 14. PLEASE INDICATE ON PLANS THE TYPE OF WALL FINISHES |
| TO BE USED ON THE TYPE 1 AND TYPE 2 WALLS AT THE |
| MECHANICAL ROOM. THE WALL SCHEDULE INDICATES THE TYPE 1 |
| WALLS FINISHED ON 1 SIDE AND THE TYPE 2 WALLS WITH NO |
| FINISH. THIS ROOM IS BEING USED AS A PLENUM. THE PLENUM |
| SHALL BE LINED WITH AN APPROVED AIR BARRIER AND |
| INSULATED IN ACCORDANCE WITH FBCM 607.8, 607.9 AND FBCB |
| TABLE 13-410.1.ABC.2.2. SEE FBCM 603.9.1 FOR A LIST OF |
| APPROVED AIR BARRIERS. |
| |
| 15. COOLING LOAD CALCULATIONS: THESE CALCULATIONS |
| INDICATE TOTAL OUTSIDE AIR OF 400 CFM WHILE THE PLANS |
| INDICATE THAT A MINIMUM OF 1930 CFM IS REQUIRED FOR |
| KITCHEN EXHAUST MAKEUP AIR. PLEASE CLARIFY. ALSO, PAGE |
| A0.1 INDICATES REMOTE CONDENSERS FOR THE REFRIGERATORS |
| AND FREEZERS ARE TO BE LOCATED IN THE CLOSET. THESE ARE |
| HEAT PRODUCING APPLIANCES. ARE THEY ACCOUNTED FOR IN |
| THE CALCULATIONS? ARE THESE CONDENSERS APPROVED FOR |
| INSTALLATION IN A PLENUM? SEE FBCB 13-407.1.ABC.1 AND |
| FBCM 602.2. |
| |
| 16. NOTE I ON FAN COIL SCHEDULE INDICATES THAT THE OA |
| DAMPER IS ONLY TO BE OPEN DURING OCCUPIED HOURS AS SET |
| BY THE BAS. THIS DAMPER, AND THE RELATED FAN COIL UNIT |
| SHALL BE INTERLOCKED WITH THE KITCHEN HOOD EXHAUST |
| SYSTEM TO ENSURE THAT THE DAMPER IS OPEN AND THE FAN |
| COIL IS OPERATING DURING ALL COOKING OPERATIONS, |
| REGARDLESS OF THE SETTINGS OF THE BAS. FOR MECHANICAL |
| MAKEUP AIR SYSTEMS, THE EXHAUST AND MAKEUP AIR SYSTEMS |
| SHALL BE ELECTRICALLY INTERLOCKED TO ENSURE THAT MAKEUP |
| AIR IS PROVIDED WHENEVER THE EXHAUST SYSTEM IS IN |
| OPERATION IN ACCORDANCE WITH FBCM 508.1. |
| |
| 17. THERE IS NO INDICATION ON MECHANICAL OR ELECTRICAL |
| PLANS THAT THERE IS A DUCT SMOKE DETECTOR INSTALLED ON |
| THE FAN COIL UNIT. FAN SHUT DOWN BY SMOKE DETECTOR IS |
| REQUIRED IN ACCORDANCE WITH FBCM 606.2. DUCT SMOKE |
| DETECTORS SHALL BE CONNECTED TO THE BUILDING FIRE ALARM |
| SYSTEM IN ACCORDANCE WITH FBCM 606.4. |
| |
| PLEASE RESPOND TO EACH COMMENT IN WRITING WITH A |
| DESCRIPTION OF HOW EACH COMMENT WAS ADDRESSED AND WHERE |
| THE RELEVANT INFORMATION CAN BE FOUND. THIS WILL ASSIST |
| IN FACILITATING A TIMELY REVIEW. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |
| |