2009-01-13 10:20:59ELECTRICAL POLE BUILDING REVIEW THIRD CHECKLIST.
 REVIEW UNDER FBC 2004 WITH 2007 REVISIONS.
  
 1- PERMIT APPLICATION IS FOR THE LIFT STATION
 ELECTRICAL WORK ONLY. A SEPARATE PERMIT APPLICATION IS
 REQUIRED FOR THE LIFT STATION. THE FOLLOWING COMMENTS
 APPLY ONLY TO THE ELECTRICAL WORK ON PERMIT APPLICATION
 SUBMITTED.
  
 2- LIGHT POLE ENGINEERED CALCULATIONS SUBMITTED:
 A) "ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME,
 ADDRESS AND NUMBER ON EACH SHEET" AS REQUIRED BY SEC.
 61G15-23.002(2) OF FLORIDA ADMINISTRATIVE CODE AND
 CHAPTER 471 FLORIDA STATUTE.
  
 B) NEED TO PROVIDE THE ENGINEERING FIRM "PRINCIPAL
 ENGINEERING" CERTIFICATE OF AUTHORIZATION NUMBER AS
 REQUIRED BY SEC. 61G15-23.002(2) OF FLORIDA
 ADMINISTRATIVE CODE AND CHAPTER 471 FLORIDA STATUTE.
  
 C) ALL SHEETS NEED TO BE SIGNED AND SEALED WITH
 ORIGINAL SEAL AND SIGNATURE, NOT COPY OF THE SIGNATURE.
 SEE FLORIDA ADMINISTRATIVE CODE SECTION AND FLORIDA
 STATUTE SECTION CITED ABOVE. CALCULATIONS SUBMITTED ARE
 SEALED ONLY ON THE FRONT PAGE AND THE SIGNATURE IS A
 PHOTOCOPY. RESUBMIT CALCULATIONS COMPLYING WITH ALL THE
 ADMINISTRATIVE CODE AND FLORIDA STATUTE REQUIREMENTS.
  
 3- PROVIDE COMPLETE SPECIFICATIONS FOR PRE-STRESSED
 CONCRETE POLE TO VERIFY COMPLIANCE WITH THE ENGINEERED
 CALCULATIONS REQUIRED ON ITEM #1 ABOVE. ENGINEER TO
 REVIEW THOSE SHOP DRAWINGS PRIOR TO SUBMITTAL TO THIS
 OFFICE.
  
 4- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. NEED TO UPDATE PERMIT VALUATION TO INCLUDE ALL
 ENGINEERING FEES AND ALL CONTRACTOR LABOR AND MATERIALS
 AS REQUIRED BY SEC. 108.3 CITY AMENDMENTS TO FBC 2004.
  