2008-08-15 13:58:35 | RESIDENTIAL (R3) SHUTTERS, BUILDINGG REVIEW CHECKLIST. |
| REVIEW UNDER FBC 2004 WITH 2007 REVISIONS. |
| |
| 1- ACCORDING TO NOTE #3 OF TABLE 1 NOTESON SHEET 7 OF |
| 13,SHUTTER SPANS LESS THAN 32" ARE NOT ACCEPTABLE. |
| SHUTTER SPAN FOR OPENING # 12 IS 14".REVISE AS |
| REQUIRED. |
| |
| 2- SPECIFY BOTTOM ANCHOR SPACING FOR OPENINGS #3 AND |
| #7.INSTALLATION SCHEDULE SUBMITTED WAS LEFT BLANK. |
| |
| 3- MAXIMUM PANEL SPAN FOR DESIGN PRESSURES SHOWN ON THE |
| INSTALLATION SCHEDULE IS 99".SEE TABLE 1 ON SHEET 7 |
| OF 13.OPENINGS #3AND #10EXCEED THE MAXIMUM PANEL |
| SPAN. THESE SHUTTERS CAN'T BE USED. |
| |
| 4- REVISETOP ANCHOR SPACING FOR OPENING #3. SEE |
| ANCHOR SCHEDULE ON SHEET 7 OF 13. CHECK PANEL SPAN AND |
| CONNECTION TYPE AND REVISE AS REQUIRED. |
| |
| 5- INSTALLATION SCHEDULE COLUMN #11 CALLS FOR POURED |
| CONCRETE IN ALL THE OPENINGSAS THE SUBSTRATE TO |
| RECEIVE THE SHUTTERS. TYPICALLY WINDOWS HAVE PRECAST |
| LINTELS OR TIE BEAM ON TOP OF OPENING ANDFILLED CELLS |
| ATWINDOW OPENING.PROVIDE TEST/PROOF THAT WINDOW |
| SILLSARE POURED CONCRETE WITH MIN. 3,000PSIOR USE |
| THE CONCRETE BLOCK ANCHOR SPACING TABLE TO SPECIFY THE |
| ANCHOR SPACING AT BOTTOM OF WINDOW OPENINGS.SEC. |
| 106.1.2 CITY AMENDMENTS TO FBC 2004 TO VERIFY |
| COMPLIANCE WITH THE PRODUCT APPROVAL AND THE DESIGN |
| PRESSURES SEC. R301 OF 2004 FLORIDA RESIDENTIAL CODE. |
| |
| 6- SPECIFIED TAPCONS REQUIRE 2" MIN. EMBEDMENT INTO THE |
| CONCRETE. SEE ANCHOR SCHEDULE SHEET 7 OF 13. |
| INSTALLATION SCHEDULE SPECIFIES 1/4" X 2 1/4" TAPCONS. |
| THIS SIZE OF TAPCON DOESN'T PROVIDE THE MIN. REQUIRED |
| EMBEDEMENT. REVISE TAPCON SIZE AS REQUIRED. |
| |
| 7-ACCORDING TO THE KEY PLAN SUBMITTED ALL THE |
| OPENINGS, INCLUDING THE ENTRY DOOR ARE GOING TO HAVE |
| SHUTTERS.SPECIFY HOWAT LEAST ONE MEANS OF ESCAPE IS |
| PROVIDED TO COMPLY WITH THE EGRESS REQUIREMENTS OF SEC. |
| R310.4 OF 2004 FLORIDA RESIDENTIAL CODE. |
| |
| 8- DRAWINGS SUBMITTED HAVE TOO MANY MARKINGS AND THEY |
| DON'T CORRESPOND TO INFORMATION SUBMITTED IN THE |
| INSTALLATION SCHEDULE. PROVIDE CLEAR DRAWINGS ONLY |
| CIRCLING THE CONDITIONS THAT APPLY TO THIS SPECIFIC JOB |
| TO EXPEDITE THE REVIEW PROCESS AND TO AVOID UNNECESSARY |
| DELAYS AND CONFLICTS WITH THE INFORMATION SUBMITTED. |
| |
| 9- THERE IS A SEPARATE SHEET SUBMITTEDLISTING 12 |
| OPENINGS.WHAT'S THIS FOR?.DIMENSIONS DON'T MATCH |
| DIMENSIONS SHOWN ON THE INSTALLATION SCHEDULE. PROVIDE |
| MATCHING INFORMATION ONLY TO AVOID CONFLICTS OR |
| DELAYS. |
| |
| JULIO GOMEZ |
| BUILDIN PLANS EXAMINER |
| (561)805-6712 |