2008-07-30 09:23:30 | PLUMBING PLAN REVIEW: |
| DENIED:**FOR PLAN REVIEW ONLY NOT FOR PERMIT** |
| |
| PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH |
| 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO |
| CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE |
| (F.A.C.), AND FLORIDA STATUTES (F.S.). |
| |
| THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| PLUMBING PLAN REVIEW TO MEET CODE COMPLIANCE. |
| |
| 1. SHEET A-0 REQUIRED PLUMBING FIXTURES: THE |
| REQUIREMENTS SHOULD BE BASED ON THE FBC- PLUMBING |
| SECTION TABLE 403.1 FOR MERCANTILE NOT BUSSINESS. |
| PLEASE CORRELATE THE REQUIRED PLUMBING FIXTURES WITH |
| THE OCCUPANCY SUMMARY. PER FBC-2004 PLUMBING SECTION |
| 401.1 SCOPE AND TABLE 403.1 MINIMUM NUMBER OF REQUIRED |
| PLUMBING FIXTURES. |
| |
| 2. SHEET P-1 SANITARY PLUMBING ISOMETRIC DETAIL #2: |
| ONLY THE FIXTURES WITHIN THE BATHROOM GROUP SHALL |
| CONNECT TO THE WET-VENTED HORIZONTAL BRANCH DRAIN. (THE |
| MOP SINK SHALL CONNECT DOWNSTREAM OF THE BATHROOM |
| FIXTURES). PER FBC- PLUMBING SECTION 909.1 WET VENT |
| PERMITTED. |
| |
| 3. SHEET P-1 GENERAL PLUMBING NOTES #15, STATES THE |
| FOLLOWING "FURNISH AND INSTALL APPROVED AIR CHAMBERS AT |
| EACH PLUMBING FIXTURE AND PDI APPROVED SHOCK ARRESTORS |
| ON MAIN LINES AND RISERS". PLEASE KNOW THAT AIR |
| CHAMBERS ARE NOT APPROVED BY FBC-2004 PLUMBING SECTION |
| 604.9 WATER HAMMER AND SHOULD BE DELETED FROM PLANS. |
| 604.9 WATER HAMMER. |
| THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM |
| SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER |
| HAMMER. A WATER-HAMMER ARRESTOR SHALL BE INSTALLED |
| WHERE QUICK-CLOSING VALVES ARE UTILIZED. WATER-HAMMER |
| ARRESTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| MANUFACTURER'S SPECIFICATIONS. WATER-HAMMER ARRESTORS |
| SHALL CONFORM TO ASSE 1010. |
| |
| 4. SHEET P-1 POTABLE WATER PLUMBING ISOMETRIC DETAIL |
| #2: PLEASE PROVIDE THE FOLLOWING PER FBC-2004 PLUMBING |
| SECTIONS. |
| |
| A} DELETE THE AIR CHAMBERS ON THE RISER DIAGRAM. PER |
| SECTION 604.9 WATER HAMMER (REFERENCE COMMENT #3). |
| |
| B} PROVIDE THE REQUIRED THERMAL EXPANSION CONTROL FOR |
| THE WATER HEATER. PER SECTION 607.3 THERMAL EXPANSION |
| CONTROL. |
| |
| 5. SHEET P-1 WATER HEATER DETAIL #6: PLEASE PROVIDE |
| THE FOLLOWING PER FBC-2004 PLUMBING SECTIONS. |
| |
| A} CLEARLY INDICATE THE HEIGHT OF THE WATER HEATER |
| SHELF FROM FINNISH FLOOR TO THE TOP OF THE SHELF. PER |
| SECTION 501.1 SCOPE. |
| |
| B} CLEARLY INDICATE THE REQUIRED TEMPERATURE AND |
| PRESSURE RELIEF VALVE. PER SECTION 504.4 RELIEF VALVE. |
| |
| C} CLEARLY INDICATE THE T & P RELIEF VALVE IN THE TOP |
| 6 INCHES OF THE TANK BEING SERVED. PER SECTION 504.4.1 |
| INSTALLATION. |
| |
| D} CLEARLY INDICATE THAT THE T & P RELIEF VALVE SHALL |
| DISCHARGE FULL SIZE TO A SAFE PLACE OF DISPOSAL SUCH AS |
| THE FLOOR, WATER HEATER PAN, OUTSIDE THE BUILDING OR AN |
| INDIRECT WASTE RECEPTOR. THE DISCHARGE PIPE SHALL NOT |
| HAVE ANY TRAPPED SECTIONS AND SHALL HAVE A VISIBLE AIR |
| GAP OR AIR GAP FITTING IN THE SAME ROOM AS THE WATER |
| HEATER. PER SECTION 504.6.1 DISCHARGE. |
| |
| E} CLEARLY INDICATE THAT THE WATER HEATER PAN SHALL |
| NOT BE LESS THAN 1-1/2 INCHES DEEP AND THE PAN DRAIN |
| PIPE SIZE SHALL BE MINIMUM OF 3/4 INCHES IN DIAMETER. |
| PER SECTION 504.7.1 PAN SIZE AND DRAIN. |
| |
| ********IMPORTANT INFORMATION******** |
| WHEN RESUBMITTING PLANS, PLEASE PROVIDE A COPY OF THE |
| OLD PLANS, CLEARLY INDICATE THE REVISION ON THE NEW |
| PLANS, REMOVE AND REPLACE ANY PAGES AS NECESSARY. A |
| TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| END OF COMMENTS: |
| |
| REVIEW BY: MIKE PERSON |
| PLUMBING PLANS EXAMINER |