Date |
Text |
2008-07-22 16:21:07 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. M-4: ELECTRICAL ROOM 123 IS SHOWN ON PAGES LS-1 AND |
| A-1 TO BE 1-HOUR FIRE RESISTANCE RATED. MECHANICAL |
| FLOOR PLAN SHOWS TWO UNPROTECTED DUCT PENETRATIONS INTO |
| THIS ROOM. PLEASE COORDINATE THE LOCATIONS OF RATED |
| WALL ASSEMBLIES WITH LS AND A PAGES, SHOWING DUCT |
| PENETRATIONS TO BE PROTECTED IN ACCORDANCE WITH FBCM |
| 607.5. |
| |
| 2. M-4: LAUNDRY ROOM 135 SHOWS 2 CLOTHES DRYERS. NOTE |
| #6 CALLS FOR TWO 6? ROUND DUCTS. IT IS NOT KNOWN |
| WHETHER THESE ARE DOMESTIC OR COMMERCIAL DRYERS. PLEASE |
| PROVIDE SUBMITTAL WITH MANUFACTURER?S INSTALLATION |
| INSTRUCTIONS TO SHOW COMPLIANCE WITH THE FOLLOWING |
| REQUIREMENTS: |
| |
| A) CLOTHES DRYERS SHALL BE EXHAUSTED IN ACCORDANCE WITH |
| THE MANUFACTURER?S INSTRUCTIONS PER FBCM 504.1. |
| DOMESTIC DRYERS GENERALLY REQUIRE 4? ROUND DUCTS. |
| LARGER DUCTS REDUCE AIR VELOCITY AND CONTRIBUTE TO THE |
| BUILD-UP OF LINT WITHIN THE EXHAUST DUCTS. |
| |
| B) INSTALLATIONS EXHAUSTING MORE THAN 200 CFM SHALL BE |
| PROVIDED WITH MAKEUP AIR IN ACCORDANCE WITH FBCM 504.5. |
| IT IS NOT KNOWN THE RATE OF EXHAUST FOR THE TWO DRYERS |
| COMBINED. THERE IS NO MAKEUP AIR SHOWN ON FLOOR PLANS |
| AS THERE IS EQUALIZED SUPPLY AND EXHAUST IN THE ROOM. |
| |
| 3. M-4: SOME DUCT SIZES ARE MISSING ON FLOOR PLANS. |
| EXAMPLES: RETURN DUCT FOR TELE CLOSET 137, ROUND TRUNK |
| LINE UPSTREAM OF TB 1-4, EXHAUST RISER FOR EF 1-1. |
| PLEASE CHECK ALL DUCTS FOR SIZING AND PROVIDE MISSING |
| INFORMATION ON PLANS. AN AIR DISTRIBUTION SYSTEM SHALL |
| BE DESIGNED AND INSTALLED TO SUPPLY THE REQUIRED |
| DISTRIBUTION OF AIR IN ACCORDANCE WITH FBCM 603.1. |
| |
| 4. M-8: DETAILS 2 AND 3REFERENCE STRUCTURAL PLANS FOR |
| CURB ATTACHMENT DETAIL. NO SUCH DETAIL COULD BE LOCATED |
| IN STRUCTURAL PLANS. PROVIDE DETAIL SHOWING CURBS, FANS |
| AND VENTS DESIGNED AND INSTALLED TO RESIST WIND |
| PRESSURES IN ACCORDANCE WITH FBCM 301.13. |
| |
| 5. EXHAUST FANS AND DRYER VENT OUTLET ARE LOCATED ON A |
| ROOF EXCEEDING 16? IN HEIGHT. WHERE EQUIPMENT AND |
| APPLIANCES REQUIRING ACCESS ARE INSTALLED ON ROOFS OR |
| ELEVATED STRUCTURES AT A HEIGHT EXCEEDING 16 FEET, SUCH |
| ACCESS SHALL BE PROVIDED BY A PERMANENT APPROVED MEANS |
| OF ACCESS, THE EXTENT OF WHICH SHALL BE FROM GRADE OR |
| FLOOR LEVEL TO THE EQUIPMENT AND APPLIANCES? LEVEL |
| SERVICE SPACE IN ACCORDANCE WITH FBCM 306.5. SUCH |
| ACCESS SHALL NOT REQUIRE CLIMBING OVER OBSTRUCTIONS |
| GREATER THAN 30 INCHES IN HEIGHT. PAGE A-2 ON THE |
| EXISTING PORTION MAKES REFERENCE TO SOME TYPE OF LADDER |
| ON ROOF BUT NO ADDITIONAL INFORMATION COULD BE FOUND. |
| PLEASE PROVIDE SUFFICIENT DETAIL TO DEMONSTRATE |
| COMPLIANCE WITH THIS SECTION. |
| |
| 6. ENERGY CALCULATIONS: A FULL REVIEW OF THE ENERGY |
| CODE COMPLIANCE FORMS CAN NOT BE DONE AT THIS TIME |
| BECAUSE THE INPUT DATA REPORT WAS NOT INCLUDED IN THE |
| SUBMISSION. SEE ?IMPORTANT NOTE? ON PAGE 2. ALSO SEE |
| THE INPUT REPORT IS CALLED FOR (AND CHECKED) ON THE |
| CHECKLIST ON PAGE 7. |
| |
| EVEN THOUGH THE ENERGY CALCULATIONS ARE NOT BEING |
| REVIEWED, THE FOLLOWING CORRECTIONS SHOULD BE MADE |
| PRIOR TO RESUBMISSION: |
| |
| A) ENERGY CODE CALCULATIONS SHALL BE MADE A PART OF THE |
| PLANS AND SPECIFICATIONS OF THE BUILDING AND THE PLANS |
| AND SPECIFICATIONS SHALL BE PREPARED BY AN ENGINEER OR |
| ARCHITECT LICENSED TO PRACTICE IN THE STATE OF FLORIDA |
| IN ACCORDANCE WITH FBCB 13-103.2. THE CERTIFICATIONS |
| PAGE STATES THE CALCULATIONS WERE PREPARED BY ?JARMO J. |
| VALIMAKI.? IS THIS PERSON A FLORIDA LICENSED ENGINEER |
| OR ARCHITECT? ALSO, THE PERSON PREPARING THE COMPLIANCE |
| CALCULATION SHALL CERTIFY (BY SIGNING AND SEALING) THAT |
| THE PLANS AND SPECIFICATIONS COVERED BY THE CALCULATION |
| ARE IN COMPLIANCE WITH CHAPTER 13 OF THE FLORIDA |
| BUILDING CODE IN ACCORDANCE WITH FBCB 13-103.1.1. |
| |
| B) A SYSTEM SIZING SUMMARY HAS BEEN ATTACHED TO THE |
| ENERGY CALCULATIONS. THE SUMMARY SHALL BE SIGNED AND |
| SEALED BY THE MECHANICAL ENGINEER IN ACCORDANCE WITH |
| FBCB 13-407.1.ABC.1 EXCEPTION 1. |
| |
| C) THE SUMMARY CALLS FOR A REQUIRED TOTAL COOLING |
| CAPACITY OF 132,072 BTU/H. THE NEW CHILLER IS SHOWN ON |
| SCHEDULE AS 24 TONS, WHICH IS MORE THAN DOUBLE THE |
| REQUIRED COOLING CAPACITY SHOWN ON THE SUMMARY. HVAC |
| SYSTEMS AND EQUIPMENT SHALL BE SIZED TO PROVIDE NO MORE |
| THAN THE SPACE AND SYSTEM LOADS CALCULATED IN |
| ACCORDANCE WITH FBCB 13-407.1.ABC.1. |
| |
| NOTE: ALSO, CHECK THE HOT WATER PIPING INSULATION |
| THICKNESS IN THE CALCULATIONS AGAINST THE THICKNESSES |
| WHICH ARE CALLED FOR IN THE JOB SPECIFICATIONS. |
| |
| PLEASE RESPOND TO EACH COMMENT IN WRITING, WITH AN |
| EXPLANATION OF HOW THE COMMENTS WERE ADDRESSED AS WELL |
| AS WHERE THE RELATED INFORMATION CAN BE LOCATED. THIS |
| WILL HELP TO FACILITATE TIMELY SUBSEQUENT REVIEWS. ALSO |
| PLEASE PROVIDE ONE SET OF OLD, VOIDED PLANS FOR |
| REFERENCE. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |