2008-06-24 19:02:16 | 1. NEW FIRE MAIN PLANNED TO BE INSTALLED SHALL BE |
| PROPERLY SUPPORTED AND RETRAINED. |
| |
| 2. ALL PORTIONS OF THE NEW FIRE MAIN SHALL BE PRESSURE |
| TESTED AT 200 PSIG FOR A MINIMUM OF AT LEAST TWO |
| HOURS. |
| |
| 3. THE NEW FIRE MAIN SHALL BE INSTALLED IN ACCORDANCE |
| WITH NFPA 24, THE STANDARD FOR FIRE SERVICE MAINS AND |
| THEIR APPURTENANCES. |
| |
| 4. THE NEW MAIN SHALL BE INSTALLED IN AN APPROVED AND |
| PROFESSIONAL MANNER. |
| |
| 5. ENTIRE INSTALLATION IS SUBJECT TO FIELD INSPECTION |
| AND APPROVAL. |
| |
| 6. ENTIRE INSTALLATION MUST BE INSPECTED, TESTED, AND |
| APPROVED BY THE BUREAU OF FIRE PREVENTION PRIOR TO THIS |
| LINE BEING PLACED INTO SERVICE. |
| |
| 7. AFTER APPROVAL, THIS INSTALLATION MUST BE PERFORMED |
| IN A TIMELY MANNER AS THE BUILDING IS AND HAS BEEN |
| CURRENTLY ON FIRE WATCH DUE TO A PORTION OF THE |
| UNDERGROUND FIRE MAIN LEAKING. |
| |
| 8. AREAS THAT WERE EXCAVATED OR EXPOSED IN AN ATTEMPT |
| TO LOCATE THE LEAK SHALL BE REPAIRED TO AS NEAR AS |
| ORIGINAL CONDITION AS POSSIBLE TO PREVENT POSSIBLE |
| INJURIES. |
| |
| 9. VERIFICATION THAT ANY SECTIONAL OR ISOLATION VALVES |
| ARE OPENED AND REMAIN IN THAT POSITION AFTER |
| INSTALLATION. |
| |
| 10. METHODS OR DEVICES SHALL BE INSTALLED TO ALLOW FOR |
| INSPECTION OF THIS PIPING ARRANGEMENT AFTER |
| INSTALLATION. |
| |
| |
| MIKE CARSILLO, ACTING ASSISTANT FIRE CHIEF |
| WEST PALM BEACH FIRE RESCUE |
| 804-4709 PHONE |
| 804-4774 FAX |