Plan Review Notes
Plan Review Notes For Permit 08050627
Permit Number 08050627
Review Stop M
Sequence Number 1
Notes
Date Text
2008-06-19 10:09:10PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODE &
 REFERENCED CODES WITH 2007 REVISIONS, CITY OF WEST PALM
 BEACH AMENDMENTS TO CHAPTER 1 (W.P.B.), FLORIDA
 ADMINISTRATIVE CODE (F.A.C.), AND FLORIDA STATUTES
 (F.S.).
  
 *** DENIED ***
 1) THE ARCHITECT OCTAVIO L. LIMA LICENSE WAS SUSPENDED
 ON 2-28-09. PLEASE CORRECT.
  
 2) THE ENERGY CALCULATION NEED TO INCLUDE BOTH
 APARTMENTS UNITS ON THE SECOND FLOOR, PER 2004 FBC
 13-101.2. ALSO SUBMIT SEPERATE ENERGY CALCULATIONS FOR
 THE FIRST FLOOR OFFICES, PER 1004 FBC 13-101.1.4.
  
 3) WHEN RESUBMITTING THE ENERGY CALCULATIONS FOR THE
 APARTMENTS USE THE REVISED FORM 600A-2004R (R=REVISED)
 PER 13-600.3.A.
  
 4) SEE RED LINE NOTES ON ENERGY CAL'S FOR MORE
 CORRECTIONS.
  
 5) THE COOLING LOAD CALCULATIONS FOR THE APARTMENT ARE
 CALLING FOR 20,650 TOTAL COOLING BTU'S, THE MECHANICAL
 PLAN EQUIPMENT SCHEDULE SHOWS 28,200 TOTAL COOLING
 BTU'S, THE PLANS CAN ONLY CALL FOR 15% MORE TOTAL
 COOLING BTU'S THAN THE COOLING LOAD CALCULATIONS, PER
 2004 FBC 13-607.1.ABC.1.1. A 2.5 TON SYSTEM IS TO LARGE
 PER COOLING LOAD CAL'S. PLEASE CORRECT.
  
 6) THE COOLING LOAD CALCULATIONS NEED TO INCLUDE BOTH
 APARTMENTS, AS ZONE ONE AND ZONE TWO, PER 2004 FBC
 13-607.1.ABC.1.
  
 7) PLAN A-2 ROOF PLAN SHOWS TWO A/C PACKAGE UNITS FOR
 THE APARTMENTS, PLAN AC-1 GROUND FLOOR SHOWS TWO
 CONDENSER UNITS FOR THE APARTMENTS, PACKAGE UNITS DO
 NOT REQUIRE CONDENSER UNITS, PLEASE CORRECT THE PLANS
 SO IT IS KNOWN WHAT TYPE OF A/C SYSTEMS ARE BEING
 INSTALLED, PER FBC 106.1.1.
  
 8) PLEASE SHOW THE SIZE OF THE SUPPLY AIR DUST GOING TO
 THE SECOND FLOOR FOYER ON PLAN AC-1, PER 2004 WPB AMEND
 106.3.5.4.
  
 9) PLEASE SHOW OUTSIDE AIR CALCULATIONS FOR OFFICE ON
 MECHANICAL PLAN, PER 2004 FBC/M 401.2. AND SHOW ON PLAN
 IF OBTAINED MECHANICALLY, PER 2004 FBC/M 401.5.
  
 10) PLAN AC-2 EQUIPMENT SCHEDULE NEED TO SHOW THE A/C
 SYSTEMS MANUFACTURER'S NAME.
  
 11) PLAN AC-2 EQUIPMENT SCHEDULE IS SHOWING THE EQUIP.
 EER, IT NEEDS TO SHOW THE SEER, PLEASE CORRECT PER 2004
 FBC 13-607.1.ACB.3.1.1.
  
 12) PLAN AC-2 EQUIPMENT SCHEDULE IS SHOWING SPLIT A/C
 SYSTEMS FOR THE APARTMENTS, OTHER PLANS SHOWED PACKAGE
 UNITS, PLEASE SEE NOTE 7 ABOVE. PLEASE CORRECT PER 2004
 FBC 106.3.5.1.4.
  
 13) SEE RED LINE NOTES ON MECHANICAL PLANS AC-1 AND
 AC-2 FOR NEEDED CORRECTIONS.
  
 14) CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL
 CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT
 LAWS, SEE F.B.C. 106.1.1.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729
 E-MAIL; [email protected]