2008-06-19 10:09:10 | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODE & |
| REFERENCED CODES WITH 2007 REVISIONS, CITY OF WEST PALM |
| BEACH AMENDMENTS TO CHAPTER 1 (W.P.B.), FLORIDA |
| ADMINISTRATIVE CODE (F.A.C.), AND FLORIDA STATUTES |
| (F.S.). |
| |
| *** DENIED *** |
| 1) THE ARCHITECT OCTAVIO L. LIMA LICENSE WAS SUSPENDED |
| ON 2-28-09. PLEASE CORRECT. |
| |
| 2) THE ENERGY CALCULATION NEED TO INCLUDE BOTH |
| APARTMENTS UNITS ON THE SECOND FLOOR, PER 2004 FBC |
| 13-101.2. ALSO SUBMIT SEPERATE ENERGY CALCULATIONS FOR |
| THE FIRST FLOOR OFFICES, PER 1004 FBC 13-101.1.4. |
| |
| 3) WHEN RESUBMITTING THE ENERGY CALCULATIONS FOR THE |
| APARTMENTS USE THE REVISED FORM 600A-2004R (R=REVISED) |
| PER 13-600.3.A. |
| |
| 4) SEE RED LINE NOTES ON ENERGY CAL'S FOR MORE |
| CORRECTIONS. |
| |
| 5) THE COOLING LOAD CALCULATIONS FOR THE APARTMENT ARE |
| CALLING FOR 20,650 TOTAL COOLING BTU'S, THE MECHANICAL |
| PLAN EQUIPMENT SCHEDULE SHOWS 28,200 TOTAL COOLING |
| BTU'S, THE PLANS CAN ONLY CALL FOR 15% MORE TOTAL |
| COOLING BTU'S THAN THE COOLING LOAD CALCULATIONS, PER |
| 2004 FBC 13-607.1.ABC.1.1. A 2.5 TON SYSTEM IS TO LARGE |
| PER COOLING LOAD CAL'S. PLEASE CORRECT. |
| |
| 6) THE COOLING LOAD CALCULATIONS NEED TO INCLUDE BOTH |
| APARTMENTS, AS ZONE ONE AND ZONE TWO, PER 2004 FBC |
| 13-607.1.ABC.1. |
| |
| 7) PLAN A-2 ROOF PLAN SHOWS TWO A/C PACKAGE UNITS FOR |
| THE APARTMENTS, PLAN AC-1 GROUND FLOOR SHOWS TWO |
| CONDENSER UNITS FOR THE APARTMENTS, PACKAGE UNITS DO |
| NOT REQUIRE CONDENSER UNITS, PLEASE CORRECT THE PLANS |
| SO IT IS KNOWN WHAT TYPE OF A/C SYSTEMS ARE BEING |
| INSTALLED, PER FBC 106.1.1. |
| |
| 8) PLEASE SHOW THE SIZE OF THE SUPPLY AIR DUST GOING TO |
| THE SECOND FLOOR FOYER ON PLAN AC-1, PER 2004 WPB AMEND |
| 106.3.5.4. |
| |
| 9) PLEASE SHOW OUTSIDE AIR CALCULATIONS FOR OFFICE ON |
| MECHANICAL PLAN, PER 2004 FBC/M 401.2. AND SHOW ON PLAN |
| IF OBTAINED MECHANICALLY, PER 2004 FBC/M 401.5. |
| |
| 10) PLAN AC-2 EQUIPMENT SCHEDULE NEED TO SHOW THE A/C |
| SYSTEMS MANUFACTURER'S NAME. |
| |
| 11) PLAN AC-2 EQUIPMENT SCHEDULE IS SHOWING THE EQUIP. |
| EER, IT NEEDS TO SHOW THE SEER, PLEASE CORRECT PER 2004 |
| FBC 13-607.1.ACB.3.1.1. |
| |
| 12) PLAN AC-2 EQUIPMENT SCHEDULE IS SHOWING SPLIT A/C |
| SYSTEMS FOR THE APARTMENTS, OTHER PLANS SHOWED PACKAGE |
| UNITS, PLEASE SEE NOTE 7 ABOVE. PLEASE CORRECT PER 2004 |
| FBC 106.3.5.1.4. |
| |
| 13) SEE RED LINE NOTES ON MECHANICAL PLANS AC-1 AND |
| AC-2 FOR NEEDED CORRECTIONS. |
| |
| 14) CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT |
| CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF |
| THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL |
| CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT |
| LAWS, SEE F.B.C. 106.1.1. |
| |
| MECHANICAL PLAN REVIEW BY; |
| TOM GORDON (561) 805-6729 |
| E-MAIL; [email protected] |