Plan Review Notes
Plan Review Notes For Permit 08050605
Permit Number 08050605
Review Stop E
Sequence Number 2
Notes
Date Text
2008-07-16 10:34:29** DENIEDREVIEW **
  
  
 1) NOTE:PLEASE SEE THE NEW ELECTRICAL PLAN PROVIDED
 ON 8 1/2 BY 11 DOES NOT CORRELATE WITH PLANS. FOR
 EXAMPLE: PLEASE SEE PLANS WHICH ARE DONE BY THE
 ENGINEER REQUIRES A NEW 50AMP FEED FOR THE NEW AQUA
 LOGIC PANEL YET THE SEPARATE PLAN SUBMITTED INDICATES A
 NEW 30AMP FEED. 240.4, 310.16, 408.4 ETC, FBC 106.1.1
 FOR CLARITY AND COORDINATION OF PLANS.
 PLEASE SEE THE ENGINEERED PLANS ARE MISSING AN
 EQUIPMENT GROUNDING CONDUCTOR TO THE NEW PANEL.250.122
 PLEASE SEE ENGINEERS PLANS CALL FOR 3-#8 CONDUCTORS TO
 POOL PUMP IN A 1/2 INCH CONDUIT. PLEASE SEE TABLES IN
 APPENDIX *C* FOR CONDUIT FILL. THIS IS NOT PERMITTED.
  
 PLEASE ADJUST AND COORDINATE PLANS.
  
  
  
  
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved