2008-06-30 13:31:25REVIEW #: 2ND
 ACTION: DENIED
  
 FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH
 PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN
 RESPONSES FOR THE PURPOSE OF CONTINUITY.
  
 1. THE REFERENCE STANDARD HAS BEEN CORRECTED. HOWEVER,
 SUPPORTING DOCUMENTATION FOR USE OF THE IAQ PROCEDURE
 WAS NOT PROVIDED AS REQUESTED IN PREVIOUS REVIEW
 COMMENT #1. PROVIDE SUPPORTING DOCUMENTATION IN
 ACCORDANCE WITH ASHRAE 62.1-2004 SECTION 6.3.2 AND FBCB
 106.1.2.
  
 2. THE 40X16 SUPPLY DUCT FROM AHU 1-2 IS PENETRATING A
 FIRE RESISTANCE RATED WALL AT THE ELEVATOR EQUIPMENT
 ROOM #155 WITH NO PROTECTION. SHOW HOW THIS DUCT
 PENETRATION IS TO BE PROTECTED IN ACCORDANCE WITH FBCM
 607.5.
  
 3 AND 4: OK
  
 5. SMOKE DAMPERS HAVE BEEN SHOWN IN REQUIRED LOCATIONS
 IN THE CORRIDOR. HOWEVER, THE DAMPER ACTUATION METHOD
 INDICATED IN KEY NOTE #1 DOES NOT MEET THE REQUIREMENTS
 OF FBCM 607.5.4.1. GIVEN THE HVAC DESIGN AND
 CONFIGURATION OF THE BUILDING, IT APPEARS THAT UNDER
 FBCM 607.5.4.1, OPTIONS 1, 4 OR 5 WOULD BE APPLICABLE.
 THE USE OF ONE DUCT SMOKE DETECTOR AT THE AHU DOES NOT
 MEET ANY OF THE OPTIONS LISTED UNDER THIS SECTION
 BECAUSE IT IS NOT WITHIN 5 FEET OF THE DAMPERS AND IT
 DOES NOT QUALIFY AS TOTAL-COVERAGE SMOKE DETECTION.
 ADDITIONALLY, THE 10X10 AIR TRANSFER OPENING FSD SHALL
 BE ACTUATED BY OPTION 3 OR 4. THE OTHER FIRE/SMOKE
 DAMPERS NOT ASSOCIATED WITH THE CORRIDOR SHALL BE
 ACTUATED BY METHOD 1 OR 3 AS APPROPRIATE FOR THE
 APPLICATION. EXAMPLE:
 THE FIRE/SMOKE DAMPERS IN THE WALL WEST OF
  
 6. OK EXCEPT, PLEASE VERIFY THAT ONE 30X12 TRANSFER AIR
 OPENING IS SUFFICIENT TO RETURN ALMOST 4000 CFM FROM
 THE MAIN LOBBY, RECEPTION AND FORMAL CONFERENCE AREAS
 IN ACCORDANCE WITH FBCM 601.4 AND FBCB 106.1.2.
  
 7 THROUGH 10: OK
  
 11. SMOKE DAMPERS ARE SHOWN ON PLANS AS REQUIRED.
 PLEASE SEE COMMENT #5 REGARDING DAMPER ACTUATION
 REQUIREMENTS.
  
 12. NOTHING IS SHOWN ON THE AHU SCHEDULE REGARDING
 AUXILIARY DRAIN PROTECTION. PLEASE SHOW COMPLIANCE WITH
 FBCM 307.2.3.
  
 13. OK. SEE COMMENT #5 FOR SMOKE DAMPER ACTUATION
 REQUIREMENTS.
  
 14 THROUGH 19: OK
  
 20. MECHANICAL PORTIONS OF THE ENERGY CALCULATIONS ARE
 OK.
  
 21. OK
  
 NOTE: THE PRINTING OF MECHANICAL FLOOR PLANS, M1.01 AND
 M2.01, ARE OF POOR QUALITY. MANY OF THE SMALL NUMBERS
 RELATED TO DUCT SIZES AND AIR TERMINAL DESIGNATIONS
 ILLEGIBLE. CONSTRUCTION DOCUMENTS SHALL BE OF
 SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND
 EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT
 WILL CONFORM TO THE PROVISIONS OF THIS CODE IN
 ACCORDANCE WITH FBCB 106.1.1. WHEN RE-SUBMITTING,
 PLEASE ENSURE THAT ALL RELEVANT INFORMATION ON FLOOR
 PLANS IS CLEAR AND LEGIBLE.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719