Date |
Text |
2008-07-25 13:40:39 | FAILED FOR FOLLOWING REASONS: |
| |
| 1. ORDINANCE NO. 4060-07: |
| |
| ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH |
| EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY |
| APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE |
| FOLLOWING: |
| |
| 1. EROSION CONTROL, AND |
| 2. LAND STABILIZATION |
| |
| THE AMOUNT OF THE EROSION CONTROL AND LAND |
| STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER |
| OF RECORD USING THE CURRENT CITY COST SCHEDULE AND |
| VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT. |
| PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION |
| SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION. |
| |
| UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN |
| FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL |
| TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE |
| MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS. |
| |
| A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM |
| THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR. |
| |
| 2.PLEASE SHOW PRE & POST PERVIOUS/IMPERVIOUS AREAS. |
| YOU MAY NEED TO PUT EXFILTRATION TRENCH, ORDRY |
| DETENTION/WET DETENTION AREAS FOR STORM WATER QUALITY. |
| PLEASE RESUBMIT GEO-TECH REPORT FOR K-FACTOR AND ALL |
| ENVRONMENTAL REPORT. |
| |
| 3. PLEASE SHOW TURBIDITY AROUND ALL CATCH BASINS. |
| |
| 4.GEO-TECH REPORT FOR K FACTOR, SOIL CONDUCTIVITY K |
| USED FOR EXFILTRATION TRENCH ,STORM WATER QUALITY |
| CALCULATIONS TO1000 45TH STREET ENGINEERING SERVICES |
| FOR APPROVAL BEFORE WE ISSUE A PERMIT. AFTER 45TH ST |
| ENGINEERING APPROVAL, PLEASE PROVIDE A COPY OF |
| GEO-TECH REPORT,STORM WATER QUALITY CALS TO |
| CONSTRUCTION SERVICE DEPT. FOR ISSUANCE OF PERMIT. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |