Date |
Text |
2008-03-20 08:55:23 | FAILED FOR FOLLOWING REASONS: |
| |
| 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| NOI. |
| YOU CAN GET NOI INFO FROM |
| WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| EFFECTIVE MAY 1, 2003 |
| IF THE TOTAL SITE AREA IS LESS THAN AN ACRE, NOI IS NOT |
| REQUIRED. |
| |
| 2. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION |
| DETAILS,CLOTHES USED FOR SILT FENCE ETC., PLANS SHOWING |
| SILT FENCE AROUND THE SITE & STORM CATCH BASIN DRAINS |
| DURING CONSTRUCTION AND ALL DEMOLITION PHASE.HEIGHT |
| OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST |
| PARTICLES. |
| |
| 3. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO. |
| 4060-07: |
| |
| ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH |
| EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY |
| APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE |
| FOLLOWING: |
| |
| 1. EROSION CONTROL, AND |
| 2. LAND STABILIZATION |
| |
| THE AMOUNT OF THE EROSION CONTROL AND LAND |
| STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER |
| OF RECORD USING THE CURRENT CITY COST SCHEDULE AND |
| VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT. |
| PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION |
| SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION. |
| |
| UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN |
| FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL |
| TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE |
| MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS. |
| |
| A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM |
| THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR. |
| |
| 4. PLEASE SHOW ON DRAWING ALL CITY STANDARDS NOTES FOR |
| SIDEWALK, DRIVEWAY, APPROACH, PARKINGS, HANDICAP |
| PARKINGS, DUMPSTER ENCLOSURE, YOU CAN GET A C D FOR ALL |
| CITY STANDARDS NOTES FROM 1000, 45 STREET, ENGINEERING |
| SERVICES, PHONE# 494-1040 |
| |
| 5. DUMPSTERLOCATION MUST BE ACCESSIBLE FOR PICKUP |
| TRUCK. |
| |
| 6. PLEASE PROVIDE A WATER QUALITY CALCULATIONS. PLEASE |
| SHOW ON CALCULATION THAT YOU HAVE CONSIDERED FLOOD ZONE |
| AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIA AND CROWN OF |
| THE ROAD WHEN YOU DETERMINE THE FIRST FLOOR ELEVATION. |
| FIRST FLOOR ELEVATION SHOULD BE ATLEAST 1 FOOT HIGHER |
| THAN HIGHEST CROWN OF THE ROAD. |
| |
| 7. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE |
| SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM |
| ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC ON DRAWINGS, CALCULATION FOR |
| EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET |
| DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL |
| THESE. PLEASE RESUBMIT GEO-TECH REPORT AND ALL |
| ENVRONMENTAL REPORT. |
| |
| 8. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET |
| FLOODED AND HAVE ENOUGH DRAINS. |
| |
| 9. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO-TECH |
| REPORT&STORM WATER QUALITY CALCULATIONS. STORM |
| WATER CALS MUST BE APPROVED FROM 100045TH STREET |
| ENGINEERING SERVICES BEFORE WE APPROVED. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |