Plan Review Notes
Plan Review Notes For Permit 08030236
Permit Number 08030236
Review Stop ENG
Sequence Number 1
Notes
Date Text
2008-03-20 08:55:23FAILED FOR FOLLOWING REASONS:
  
 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI).
 PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR
 NOI.
 YOU CAN GET NOI INFO FROM
 WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/
 NOTICE OF INTENT DEP FORM 62-621.300(4)(B),
 EFFECTIVE MAY 1, 2003
 IF THE TOTAL SITE AREA IS LESS THAN AN ACRE, NOI IS NOT
 REQUIRED.
  
 2. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT FENCE ETC., PLANS SHOWING
 SILT FENCE AROUND THE SITE & STORM CATCH BASIN DRAINS
 DURING CONSTRUCTION AND ALL DEMOLITION PHASE.HEIGHT
 OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST
 PARTICLES.
  
 3. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO.
 4060-07:
  
 ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH
 EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY
 APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE
 FOLLOWING:
  
 1. EROSION CONTROL, AND
 2. LAND STABILIZATION
  
 THE AMOUNT OF THE EROSION CONTROL AND LAND
 STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER
 OF RECORD USING THE CURRENT CITY COST SCHEDULE AND
 VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT.
 PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION
 SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION.
  
 UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN
 FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL
 TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE
 MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS.
  
 A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM
 THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR.
  
 4. PLEASE SHOW ON DRAWING ALL CITY STANDARDS NOTES FOR
 SIDEWALK, DRIVEWAY, APPROACH, PARKINGS, HANDICAP
 PARKINGS, DUMPSTER ENCLOSURE, YOU CAN GET A C D FOR ALL
 CITY STANDARDS NOTES FROM 1000, 45 STREET, ENGINEERING
 SERVICES, PHONE# 494-1040
  
 5. DUMPSTERLOCATION MUST BE ACCESSIBLE FOR PICKUP
 TRUCK.
  
 6. PLEASE PROVIDE A WATER QUALITY CALCULATIONS. PLEASE
 SHOW ON CALCULATION THAT YOU HAVE CONSIDERED FLOOD ZONE
 AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIA AND CROWN OF
 THE ROAD WHEN YOU DETERMINE THE FIRST FLOOR ELEVATION.
 FIRST FLOOR ELEVATION SHOULD BE ATLEAST 1 FOOT HIGHER
 THAN HIGHEST CROWN OF THE ROAD.
  
 7. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE
 SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM
 ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE
 CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING
 ELEVATION, ETC ON DRAWINGS, CALCULATION FOR
 EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET
 DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL
 THESE. PLEASE RESUBMIT GEO-TECH REPORT AND ALL
 ENVRONMENTAL REPORT.
  
 8. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND
 YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET
 FLOODED AND HAVE ENOUGH DRAINS.
  
 9. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO-TECH
 REPORT&STORM WATER QUALITY CALCULATIONS. STORM
 WATER CALS MUST BE APPROVED FROM 100045TH STREET
 ENGINEERING SERVICES BEFORE WE APPROVED.
  
 PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR
 PERMITTING PROCESS
  
 RASIK CHOKSHI805-6723


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved