Date |
Text |
2008-01-29 16:34:59 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL, BUILDING PLANS EXAMINER |
| 561-805-6724 [email protected] |
| |
| FBCFLORIDA BUILDING CODE 2004 |
| FBC EBFLORIDA BUILDING CODE 2004 EXISTING BUILDING |
| CODE |
| FBC RFLORIDA BUILDING CODE 2004 RESIDENTIAL |
| FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004 |
| FAC FLORIDA ADMINISTRATIVE CODE |
| FSFLORIDA STATUTE |
| |
| 1.SHUTTER SPAN FOR ACCORDION SHUTTERS SHOULD |
| CORRELATE WITH THE OPENING HEIGHT (BLADE LENGTH). |
| PLEASE REVISE INSTALLATION SCHEDULE. |
| |
| 2.SEE OPENING 5.AN OPENING OF 57", WITH 3" EDGE |
| DISTANCE TOP AND BOTTOM, SHOULD HAVE A SPAN OF |
| APPROXIMATELY 61".SEE THE ANCHOR CHART ON SHEET 8. |
| YOU HAVE HIGHLIGHTED THE "CONCRETE" COLUMN BUT SHOULD |
| BE USING THE "MASONRY" COLUMN AS YOU HAVE SPECIFIED |
| BLOCK AS THE SUBSTRATE ON THE INSTALLATION SCHEDULE. 7" |
| SPACING IS REQUIRED FOR THE BOTTOM. |
| |
| 3.SEE OPENING 8.FOR A SPAN OF APPROXIMATELY 110", |
| (NOTE THAT YOU STATE IT IS 320", PLEASE REVISE) YOU |
| MUST USE THE COLUMN FOR NOTE 3, 3 1/2" AND 5" ANCHOR |
| SPACING REQUIRED.IF THE SUBSTRATE IS CONCRETE, 9" AND |
| 6" REQUIRED, NOT 9" AND 9" AS SPECIFIED ON THE |
| INSTALLATION SCHEDULE. |
| |
| 4.PLEASE CHECK ALL OPENINGS; THESE COMMENTS MAY APPLY |
| TO OTHER OPENINGS AS NOT ALL WERE CHECKED. |