Plan Review Notes
Plan Review Notes For Permit 08010249
Permit Number 08010249
Review Stop M
Sequence Number 3
Notes
Date Text
2008-06-27 08:36:42************PROVISOS*************
  
 1. COMPLIANCE WITH THE WIND RESISTANCE REQUIREMENTS
 SHALL BE DEMONSTRATED PRIOR TO INSTALLATION AND
 INSPECTION OF OUTDOOR APPLIANCES AND EQUIPMENT EXPOSED
 TO WIND PRESSURES IN ACCORDANCE WITH FBCM 301.13. ANY
 ALTERNATE MATERIALS AND METHODS PROPOSALS SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL IN WRITING.
  
 2. A STAIR PRESSURIZATION TEST SHALL BE PERFORMED PRIOR
 TO FINAL INSPECTION TO VERIFY STAIRWAY DOOR OPENING
 FORCES ARE WITHIN ALLOWED RANGE IN COMPLIANCE WITH FBCB
 11-4.13.11.
  
 3. GREASE DUCT SYSTEMS SERVING A TYPE I HOOD SHALL
 PROVIDE AN AIR VELOCITY WITHIN THE DUCT SYSTEM OF 1,500
 TO 2,500 FEET PER MINUTE. KEF-1 ON SCHEDULE (M-002) IS
 TOO SMALL TO PROVIDE REQUIRED EXHAUST VOLUME AND IS
 SMALLER THAN SUPPLY FAN. DEMONSTRATE COMPLIANCE WITH
 FBCM 506.3.4 AND FBCB 13-409.1.ABC.3.6.1. REVISE PLANS
 PRIOR TO ROUGH INSPECTION.
  
 4. ROOF KEF DETAIL (M-404) SHOWS CLEARANCE UNDER FAN AT
 14 INCHES. CLEARANCE UNDER FAN TO ROOF SHALL BE IN
 ACCORDANCE WITH FBCB TABLE 1509.7. REVISE PLANS PRIOR
 TO ROUGH INSPECTION.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J. REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved