Plan Review Notes
Plan Review Notes For Permit 08010249
Permit Number 08010249
Review Stop E
Sequence Number 27
Notes
Date Text
2009-01-31 10:40:39*** DENIED***
  
 POOL PAK HEATER
  
 1) NOTE: THE SUBMITTAL FOR THIS ITEM WAS NOT STAMPED OR
 REVIEWED BY THE ELECTRICAL ENGINEERING FIRM/DESIGNER OF
 RECORD. COMMENTS WILL ALSO BE MADE AT THIS HEATING UNIT
 IS NOT INCLUDED WITH THE SUBMITTED ENERGY CALCULATIONS.
 FBC13-412, 13-412.1.ABC.3 EQUIPMENT PERFORMANCE
 STANDARDS.
 THE SPECS SUBMITTED CONTAIN IDENTIFICATION OF MULTIPLE
 VOLTAGES. SOME SHEETS HAVE SOME HAND DRAWN CORRECTIONS
 AND OTHER SHEETS STILL HAVE 460/480V CIRCLED. PLEASE
 COORDINATE THESE ITEMS
 PLEASE SEE 13-412.1.ABC.3. WHERE DO THE SUBMITTED
 DOCUMENTS SHOW ANY INFORMATION OR COMPLIANCE WITH THIS
 TABLE FOR MINIMUM REQUIREMENTS?
  
 FBC 106.1.1 FOR COORDINATION AND CLARITY WITH PLANS.
  
  
  
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved