2008-04-26 17:04:20DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 BUILDING
 FBC-2004 FUEL GAS
 FBC-2004 CHAPTER 1
 FBC-2004 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
 FHA-98 DESIGN MANUAL
 CITY WPB MUNICIPAL CODES
  
 ****FROM PREVIOUS REVIEW:
  
 1. OK
 2. OK
 3. OK
 4. OK
  
 5. SHT G001 INDEX OF DRAWINGS DOES NOT REFLECT THE
 SHEETS SUBMITTED. SHTS A-813 THRU A-819 SHOWN ON THE
 INDEX WERE NOT SUBMITTED. SHTS P-101 THRU P-105, P-201
 THRU P-204 SHOWN ON THE INDEX WERE NOT SUBMITTED. SHTS
 P-101B THRU P-105B, P-201B THRU 204B, P-602 WERE
 SUBMITTED BUT NOT SHOWN ON THE INDEX. ALSO SHEET TITLES
 ON SHTS P-101A THRU P-204A & P-101B THRU P-204B DO NOT
 REFLECT THE INDEX TITLES. PLEASE CORRELATE THE INDEX
 WITH SHEETS & INFORMATION SUBMITTED. SECTION 106.1.3.
 ****RESPONSE NOTED, BUT THE INDEX OF DRAWINGS STILL
 DOES NOT RELFECT THE SHEETS SUBMITTED. MANY SHEETS
 SHOWN ON THE INDEX WERE NOT SUBMITTED. SOME SHEETS
 SUBMITTED ARE NOT SHOWN ON THE INDEX.
  
 6. OK
 7. OK
 8. OK
 9. OK
 10. OK
 11. OK
 12. OK
 13. OK
 14. OK
  
 15. SHT P-001 LAUNDRY EQUIPMENT LOAD SCHEDULE ITEM 02
 GAS DRYER INDICATES A 3/4" HOT WATER SUPPLY CONNECTING
 TO THE DRYER. PLEASE CLARIFY. SUBMIT MANUF.
 INSTALLATION INSTRUCTIONS. IF REQUIRED, SHOW BACKFLOW
 METHOD. SECTIONS 106.1.2 & 608.
 ****RESPONSE NOTED, BUT THE 950XLU IS REQUIRED TO BE A
 MAXIMUM 30" ABOVE THE FLOOR WITH AN INDIRECT WASTE
 RECEPTOR, NOT IN THE CEILING AS SHOWN. THIS IS REQUIRED
 FOR SERVICING AND TESTING. THE REQUIREMENT FOR BACKFLOW
 PREVENTION CAN BE ACHIEVED WITH A "WATTS N36 VACUUM
 BREAKER OR EQUIALENT AT THE TOP OF THE DROP TO THE
 DRYERS.
  
 16. OK
  
 17. SHT P-101A THE CONDENSATE SHALL DRAIN SEPARATELY
 FROM THE BUILDING AND TERMINATE IN A CATCH BASIN, A
 DRYWELL, A PLANTED AREA, OR CONNECT TO THE STORM SEWER.
 IF CONNECTING TO THE STORM SEWER, A RELIEF VENT,
 (GOOSENECK), IS REQUIRED AS THE CONDENSATE EXITS THE
 BUILDING. SECTION 314.2.1.
 ****RESPONSE NOTED, BUT THE CONDENSATE LINE FROM AHU-3
 SHALL CONNECT TO THE BUILDING STORM DRAIN LINE, NOT THE
 BRANCH LINE TO ST-13.
  
 18. OK
 19. OK
 20. OK
 21. OK
 22. OK
 23. OK
 24. OK
 25. OK
 26. OK
 27. OK
 28. OK
 29. OK
 30. OK
 31. OK
 32. OK
 33. OK
  
 34. SHT P-301 NOTE FOR CONTINUATION OF 2-1/2" VENT LINE
 IS NOT COMPLETE. PLEASE CLARIFY WHERE CONTINUATION CAN
 BE FOUND. SECTION 106.1.2.
 ****RESPONSE NOTED, BUT SHT P-101 WAS NOT SUBMITTED OR
 INDICATED ON SHT G-001A DRAWING INDEX.
  
 35. OK
 36. OK
  
 37. SHT P-402 HOT WATER DETAILS. TRAP PRIMERS ARE
 REQUIRED AT THE FLOOR DRAINS. SECTION 1002.4.--
 THERMAL EXPANSION CONTROL REQUIRED FOR WATER HEATERS IN
 DETAIL NUMBER 13. IF AN EXPANSION TANK WILL BE
 INSTALLED, SUBMIT CALCULATIONS FOR EXPANSION CONTROL
 EXPANSION TANKS, (FOR DETAIL # 14 ALSO), & SUBMIT
 MANUF. SPECIFICATION SHEETS WITH INSTALLION/SIZE CHART.
 INDICATE MODEL NUMBERS. SECTION 607.3.2. ****RESPONSE
 NOTED, BUT THE EXPANSION TANK CALCULATION SUBMITTED
 INDICATES THE REQUIRED SIZE IS 28.5 GAL. THE MODEL
 INDICATED IS ONLY 25 GAL. TANK NOT APPROVED.
  
 38. SHT P-500 WEST END SANT. RISERS. EVERY VENT STACK
 SHALL CONNECT TO THE BASE OF THE DRAINAGE STACK PER
 SECTION 903.4.
 ****RESPONSE NOTED, BUT NOT ALL STACKS SHOW THE VENT
 STACKS CONNECTING TO THE DRAINAGE STACKS. PLEASE CHECK
 ALL STACKS TO MAKE SURE THE VENT STACKS CONNECT TO THE
 DRAINAGE STACKS.
  
 38A. OK
 39. OK
 40 OK
 41. OK
 42. OK
 43. OK
 44. OK
 45. OK
 46. OK
 47. OK
 48. OK
 49. OK
 50. OK
 51. OK
  
 52. SHT P-501 EAST END SANITARY RISER. EVERY VENT STACK
 SHALL CONNECT TO THE BASE OF THE DRAINAGE STACK PER
 SECTION 903.4.
 ****RESPONSE NOTED, BUT NOT ALL STACKS SHOW THE VENT
 STACKS CONNECTING TO THE DRAINAGE STACKS. PLEASE CHECK
 ALL STACKS TO MAKE SURE THE VENT STACKS CONNECT TO THE
 DRAINAGE STACKS.
  
 53. OK
 54. OK
 55. OK
 56. OK
  
 57. SHT P-501 CONNECTIONS TO RISERS SAN-2A & 1A DO NOT
 REFLECT THE FLOOR PLANS. PLEASE CORRELATE. SECTION
 106.1.1.
 ****RESPONSE NOTED, BUT THE CLEANOUT IS MISSING
 UPSTREAM OF THE BRANCH LINE TO RISER 2A AND THE OFFSET
 AT THE BASE OF RISER 1A IS NOT INDICATED.
  
 58. OK
  
 59. SHT P-501 RISER SAN-1/2 3" BRANCH LINE TO LAUNDRY
 FLOOR DRAIN IS NOT SHOWN ON THE RISER. PLEASE
 CORRELATE. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT THE BRANCH LINE TO THE FLOOR
 DRAIN DOES NOT REFLECT THE FLOOR PLAN, NOR IS IT
 VENTED. SECTION 901.2.1.
  
 60. OK
 61. OK
 62. OK
 63. OK
 64. OK
 65. OK
 66. OK
 67. OK
 68. OK
 69. OK
 70. OK
 71. OK
 72. OK
 73. OK
 74. OK
 75. OK
 76. OK
  
 77. SHT P-600 RISER ST/11 DOES NOT REFLECT THE FLOOR
 PLAN AT THE OFFSET IN THE MEZZ. LEVEL & OFFSETS FOR
 ST/11 - STO/11. (SEE P-404A). PLEASE CORRELATE. SECTION
 106.1.1.
 ****RESPONSE NOTED, BUT THE OFFSET BELOW THE ROOF IS
 NOT SHOWN ON THE RISER DIAGRAM.
  
 78. SHT P-600 THE BRANCH CONNECTION FOR RISER ST/12
 DOES NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE.
 SECTION 106.1.1.
 ****RESPONSE NOTED, BUT COMMENT NOT ADDRESSED.
  
 79. OK
  
 80. SHT P-600 RISER STO/13 STARTS OUT ON THE RIGHT SIDE
 OF ST/13 AT THE ROOF LEVEL BUT CROSSES TO THE LEFT SIDE
 AT THE MEZZ. LEVEL TO THE 1ST FLOOR. THE RISER DIAGRAM
 DOES NOT REFLECT THIS. PLEASE CLARIFY. PLEASE
 CORRELATE. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT COMMENT NOT ADDRESSED.
  
 81. OK
 82. OK
 83. OK
  
 84. SHT P-601 CONDENSATE SHALL DRAIN SEPARATELY FROM
 THE BUILDING. SECTION 314.2.1. (SEE COMMENT # 17).
 ****RESPONSE NOTED, BUT THE CONDENSATE LINE FROM AHU-3
 SHALL CONNECT TO THE BUILDING STORM DRAIN LINE, NOT THE
 BRANCH LINE TO ST-13.
  
 85. OK
 86. OK
 87. OK
 88. OK
 89. OK
  
 90. A SEPARATE GAS PERMIT IS REQUIRED. THE FOLLOWING
 INFORMATION IS REQUIRED:
  
 A. OK
 B. OK
 C. OK
 D. OK
 E. OK
 F. OK
 G. OK
  
 H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 ****RESPONSE NOTED, BUT THE MANUF. SHEET WERE NOT
 SUBMITTED. (THIS CAN BE PROVISO'D UNTIL THE GAS
 APPLICATION IS APPLIED FOR).
  
 I. N/A
 J. N/A
  
 **********NEW COMMENTS**********
  
 1B. SHT P-104A FIXTURES ARE NOT SHOW ON THE FLOOR PLAN
 FOR THE BATHROOM AT RISER SAN/10B. SECTION 106.1.2.
 PLEASE SHOW ALL FIXTURES ON THE FLOOR PLAN.
  
 2B. THE GAS REGULATOR SUBMITTAL IS NOT APPROVED FOR ALL
 GAS APPLIANCES. THE ONLY SIZE INDICATED IN THE
 SUBMITTAL IS 3/4" BUT THE SHUT OFF VALVE AND REGULATOR
 SHALL BE SIZED PER THE PIPE SIZE REQUIRED TO EACH
 APPLIANCE.
  
 3B. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE. THIS IS REQUIRED FOR THE
 GRIDDLE.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER,
 WITH A DESCRIPTION OF THE REVISION MADE, IDENTIFYING
 THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE
 ALL VOID SHEETS FROM ALL PLANS AND PLACE
 ONE SET OF THEM LOOSELY ON TOP OF THE
 COLLATED PLANS TO BE REVIEWED. PLEASE RESUBMIT THE RED
 LINED PLUMBING SHEETS FROM THE FIRST REVIEW. THIS WILL
 HELP EXPEDITE THE PLUMBING/GAS PLAN REVIEW.
 THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved