Date |
Text |
2008-04-26 17:04:20 | DENIED |
| REFERENCE: FBC-2004 PLUMBING |
| FBC-2004 BUILDING |
| FBC-2004 FUEL GAS |
| FBC-2004 CHAPTER 1 |
| FBC-2004 CHAPTER 11 |
| FLORIDA ADMINISTRATIVE CODE |
| FLORIDA STATUTES |
| FHA-98 DESIGN MANUAL |
| CITY WPB MUNICIPAL CODES |
| |
| ****FROM PREVIOUS REVIEW: |
| |
| 1. OK |
| 2. OK |
| 3. OK |
| 4. OK |
| |
| 5. SHT G001 INDEX OF DRAWINGS DOES NOT REFLECT THE |
| SHEETS SUBMITTED. SHTS A-813 THRU A-819 SHOWN ON THE |
| INDEX WERE NOT SUBMITTED. SHTS P-101 THRU P-105, P-201 |
| THRU P-204 SHOWN ON THE INDEX WERE NOT SUBMITTED. SHTS |
| P-101B THRU P-105B, P-201B THRU 204B, P-602 WERE |
| SUBMITTED BUT NOT SHOWN ON THE INDEX. ALSO SHEET TITLES |
| ON SHTS P-101A THRU P-204A & P-101B THRU P-204B DO NOT |
| REFLECT THE INDEX TITLES. PLEASE CORRELATE THE INDEX |
| WITH SHEETS & INFORMATION SUBMITTED. SECTION 106.1.3. |
| ****RESPONSE NOTED, BUT THE INDEX OF DRAWINGS STILL |
| DOES NOT RELFECT THE SHEETS SUBMITTED. MANY SHEETS |
| SHOWN ON THE INDEX WERE NOT SUBMITTED. SOME SHEETS |
| SUBMITTED ARE NOT SHOWN ON THE INDEX. |
| |
| 6. OK |
| 7. OK |
| 8. OK |
| 9. OK |
| 10. OK |
| 11. OK |
| 12. OK |
| 13. OK |
| 14. OK |
| |
| 15. SHT P-001 LAUNDRY EQUIPMENT LOAD SCHEDULE ITEM 02 |
| GAS DRYER INDICATES A 3/4" HOT WATER SUPPLY CONNECTING |
| TO THE DRYER. PLEASE CLARIFY. SUBMIT MANUF. |
| INSTALLATION INSTRUCTIONS. IF REQUIRED, SHOW BACKFLOW |
| METHOD. SECTIONS 106.1.2 & 608. |
| ****RESPONSE NOTED, BUT THE 950XLU IS REQUIRED TO BE A |
| MAXIMUM 30" ABOVE THE FLOOR WITH AN INDIRECT WASTE |
| RECEPTOR, NOT IN THE CEILING AS SHOWN. THIS IS REQUIRED |
| FOR SERVICING AND TESTING. THE REQUIREMENT FOR BACKFLOW |
| PREVENTION CAN BE ACHIEVED WITH A "WATTS N36 VACUUM |
| BREAKER OR EQUIALENT AT THE TOP OF THE DROP TO THE |
| DRYERS. |
| |
| 16. OK |
| |
| 17. SHT P-101A THE CONDENSATE SHALL DRAIN SEPARATELY |
| FROM THE BUILDING AND TERMINATE IN A CATCH BASIN, A |
| DRYWELL, A PLANTED AREA, OR CONNECT TO THE STORM SEWER. |
| IF CONNECTING TO THE STORM SEWER, A RELIEF VENT, |
| (GOOSENECK), IS REQUIRED AS THE CONDENSATE EXITS THE |
| BUILDING. SECTION 314.2.1. |
| ****RESPONSE NOTED, BUT THE CONDENSATE LINE FROM AHU-3 |
| SHALL CONNECT TO THE BUILDING STORM DRAIN LINE, NOT THE |
| BRANCH LINE TO ST-13. |
| |
| 18. OK |
| 19. OK |
| 20. OK |
| 21. OK |
| 22. OK |
| 23. OK |
| 24. OK |
| 25. OK |
| 26. OK |
| 27. OK |
| 28. OK |
| 29. OK |
| 30. OK |
| 31. OK |
| 32. OK |
| 33. OK |
| |
| 34. SHT P-301 NOTE FOR CONTINUATION OF 2-1/2" VENT LINE |
| IS NOT COMPLETE. PLEASE CLARIFY WHERE CONTINUATION CAN |
| BE FOUND. SECTION 106.1.2. |
| ****RESPONSE NOTED, BUT SHT P-101 WAS NOT SUBMITTED OR |
| INDICATED ON SHT G-001A DRAWING INDEX. |
| |
| 35. OK |
| 36. OK |
| |
| 37. SHT P-402 HOT WATER DETAILS. TRAP PRIMERS ARE |
| REQUIRED AT THE FLOOR DRAINS. SECTION 1002.4.-- |
| THERMAL EXPANSION CONTROL REQUIRED FOR WATER HEATERS IN |
| DETAIL NUMBER 13. IF AN EXPANSION TANK WILL BE |
| INSTALLED, SUBMIT CALCULATIONS FOR EXPANSION CONTROL |
| EXPANSION TANKS, (FOR DETAIL # 14 ALSO), & SUBMIT |
| MANUF. SPECIFICATION SHEETS WITH INSTALLION/SIZE CHART. |
| INDICATE MODEL NUMBERS. SECTION 607.3.2. ****RESPONSE |
| NOTED, BUT THE EXPANSION TANK CALCULATION SUBMITTED |
| INDICATES THE REQUIRED SIZE IS 28.5 GAL. THE MODEL |
| INDICATED IS ONLY 25 GAL. TANK NOT APPROVED. |
| |
| 38. SHT P-500 WEST END SANT. RISERS. EVERY VENT STACK |
| SHALL CONNECT TO THE BASE OF THE DRAINAGE STACK PER |
| SECTION 903.4. |
| ****RESPONSE NOTED, BUT NOT ALL STACKS SHOW THE VENT |
| STACKS CONNECTING TO THE DRAINAGE STACKS. PLEASE CHECK |
| ALL STACKS TO MAKE SURE THE VENT STACKS CONNECT TO THE |
| DRAINAGE STACKS. |
| |
| 38A. OK |
| 39. OK |
| 40 OK |
| 41. OK |
| 42. OK |
| 43. OK |
| 44. OK |
| 45. OK |
| 46. OK |
| 47. OK |
| 48. OK |
| 49. OK |
| 50. OK |
| 51. OK |
| |
| 52. SHT P-501 EAST END SANITARY RISER. EVERY VENT STACK |
| SHALL CONNECT TO THE BASE OF THE DRAINAGE STACK PER |
| SECTION 903.4. |
| ****RESPONSE NOTED, BUT NOT ALL STACKS SHOW THE VENT |
| STACKS CONNECTING TO THE DRAINAGE STACKS. PLEASE CHECK |
| ALL STACKS TO MAKE SURE THE VENT STACKS CONNECT TO THE |
| DRAINAGE STACKS. |
| |
| 53. OK |
| 54. OK |
| 55. OK |
| 56. OK |
| |
| 57. SHT P-501 CONNECTIONS TO RISERS SAN-2A & 1A DO NOT |
| REFLECT THE FLOOR PLANS. PLEASE CORRELATE. SECTION |
| 106.1.1. |
| ****RESPONSE NOTED, BUT THE CLEANOUT IS MISSING |
| UPSTREAM OF THE BRANCH LINE TO RISER 2A AND THE OFFSET |
| AT THE BASE OF RISER 1A IS NOT INDICATED. |
| |
| 58. OK |
| |
| 59. SHT P-501 RISER SAN-1/2 3" BRANCH LINE TO LAUNDRY |
| FLOOR DRAIN IS NOT SHOWN ON THE RISER. PLEASE |
| CORRELATE. SECTION 106.1.1. |
| ****RESPONSE NOTED, BUT THE BRANCH LINE TO THE FLOOR |
| DRAIN DOES NOT REFLECT THE FLOOR PLAN, NOR IS IT |
| VENTED. SECTION 901.2.1. |
| |
| 60. OK |
| 61. OK |
| 62. OK |
| 63. OK |
| 64. OK |
| 65. OK |
| 66. OK |
| 67. OK |
| 68. OK |
| 69. OK |
| 70. OK |
| 71. OK |
| 72. OK |
| 73. OK |
| 74. OK |
| 75. OK |
| 76. OK |
| |
| 77. SHT P-600 RISER ST/11 DOES NOT REFLECT THE FLOOR |
| PLAN AT THE OFFSET IN THE MEZZ. LEVEL & OFFSETS FOR |
| ST/11 - STO/11. (SEE P-404A). PLEASE CORRELATE. SECTION |
| 106.1.1. |
| ****RESPONSE NOTED, BUT THE OFFSET BELOW THE ROOF IS |
| NOT SHOWN ON THE RISER DIAGRAM. |
| |
| 78. SHT P-600 THE BRANCH CONNECTION FOR RISER ST/12 |
| DOES NOT REFLECT THE FLOOR PLAN. PLEASE CORRELATE. |
| SECTION 106.1.1. |
| ****RESPONSE NOTED, BUT COMMENT NOT ADDRESSED. |
| |
| 79. OK |
| |
| 80. SHT P-600 RISER STO/13 STARTS OUT ON THE RIGHT SIDE |
| OF ST/13 AT THE ROOF LEVEL BUT CROSSES TO THE LEFT SIDE |
| AT THE MEZZ. LEVEL TO THE 1ST FLOOR. THE RISER DIAGRAM |
| DOES NOT REFLECT THIS. PLEASE CLARIFY. PLEASE |
| CORRELATE. SECTION 106.1.1. |
| ****RESPONSE NOTED, BUT COMMENT NOT ADDRESSED. |
| |
| 81. OK |
| 82. OK |
| 83. OK |
| |
| 84. SHT P-601 CONDENSATE SHALL DRAIN SEPARATELY FROM |
| THE BUILDING. SECTION 314.2.1. (SEE COMMENT # 17). |
| ****RESPONSE NOTED, BUT THE CONDENSATE LINE FROM AHU-3 |
| SHALL CONNECT TO THE BUILDING STORM DRAIN LINE, NOT THE |
| BRANCH LINE TO ST-13. |
| |
| 85. OK |
| 86. OK |
| 87. OK |
| 88. OK |
| 89. OK |
| |
| 90. A SEPARATE GAS PERMIT IS REQUIRED. THE FOLLOWING |
| INFORMATION IS REQUIRED: |
| |
| A. OK |
| B. OK |
| C. OK |
| D. OK |
| E. OK |
| F. OK |
| G. OK |
| |
| H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2. |
| ****RESPONSE NOTED, BUT THE MANUF. SHEET WERE NOT |
| SUBMITTED. (THIS CAN BE PROVISO'D UNTIL THE GAS |
| APPLICATION IS APPLIED FOR). |
| |
| I. N/A |
| J. N/A |
| |
| **********NEW COMMENTS********** |
| |
| 1B. SHT P-104A FIXTURES ARE NOT SHOW ON THE FLOOR PLAN |
| FOR THE BATHROOM AT RISER SAN/10B. SECTION 106.1.2. |
| PLEASE SHOW ALL FIXTURES ON THE FLOOR PLAN. |
| |
| 2B. THE GAS REGULATOR SUBMITTAL IS NOT APPROVED FOR ALL |
| GAS APPLIANCES. THE ONLY SIZE INDICATED IN THE |
| SUBMITTAL IS 3/4" BUT THE SHUT OFF VALVE AND REGULATOR |
| SHALL BE SIZED PER THE PIPE SIZE REQUIRED TO EACH |
| APPLIANCE. |
| |
| 3B. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| VALVE TO BE BELOW CEILING. MANUAL SHUT |
| OFF VALVE TO BE UPSTREAM. UNION TO BE |
| DOWN STREAM OF MANUAL VALVE. THIS IS REQUIRED FOR THE |
| GRIDDLE. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE |
| THE REVISION & REMOVE & REPLACE ANY |
| PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| WITH A DESCRIPTION OF THE REVISION MADE, IDENTIFYING |
| THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND |
| WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| ONE SET OF THEM LOOSELY ON TOP OF THE |
| COLLATED PLANS TO BE REVIEWED. PLEASE RESUBMIT THE RED |
| LINED PLUMBING SHEETS FROM THE FIRST REVIEW. THIS WILL |
| HELP EXPEDITE THE PLUMBING/GAS PLAN REVIEW. |
| THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |