2008-07-03 11:30:45 | DENIED |
| REFERENCE: FBC-2004 FUEL GAS |
| |
| 1. A SEPARATE GAS PERMIT IS REQUIRED. THE FOLLOWING |
| INFORMATION IS REQUIRED: |
| |
| A. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2004 |
| FUEL GAS CODE.--RISER NOTED, BUT THE ISOMETRIC |
| DRAWING DOES NOT REFLECT THE FLOOR PLAN AT THE WATER |
| HEATERS AND AT THE DRYERS. ALSOTHE LENGTHS OF PIPE |
| ARE NOT CLEAR AS INDICATED. PLEASE SHOW WHERE EACH |
| SECTION OF PIPE BEGINS AND WHERE EACH SECTION OF PIPE |
| ENDS.PLEASE CORRELATE. SECTION 106.1.1. |
| |
| B. SHOW TYPE OF PIPING MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE BEING USED.--THE PIPE |
| SIZES FOR THE RUNS INDICATED AS "A", "C" & "E" ARE |
| INCORRECT SIZES. RUN "A" SHALL BE 4", RUN "C" SHALL BE |
| 2-1/2" AND RUN "E" SHALL BE 2-1/2" PER TABLE 402.4(6). |
| |
| C. TYPE OF GAS, (LP OR NATURAL). |
| |
| D. SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY, (METER), TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| OF CAPACITY TABLES A.3.1(4). |
| |
| E. SUBMIT CALCULATIONS FOR COMBUSTION |
| AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| GAS CODE SECTION 304. |
| |
| F. INDICATE THE DELIVERY PRESSURE (PSI) |
| PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| NATURAL GAS SPECIFY .5 PSI OR 2 PSI.--SHT P-602 |
| INDICATES THE UTILITY COMPANY AS TECO GAS. THE GAS |
| PROVIDER IN WEST PALM BEACH IS FLORIDA PUBLIC UTILITIES |
| AND THEY PROVIDE THE GAS AT 1/2 PSI OR 2 PSI. PLEASE |
| INDICATE THE PROPER PROVIDER AND INDICATE THE CORRECT |
| DELIVERY PRESSURE. |
| |
| G. SUBMIT A DETAIL SHOWING THE TYPE, |
| LOCATION, SIZE AND TERMINATION OF THE |
| GAS VENTS PER FBC-2004 FUEL GAS CODE |
| SECS. 502 THRU 505. |
| |
| H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2. |
| |
| I. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| |
| J. CLEARLY INDICATE ON THE PLAN IF THE |
| LP TANK IS ABOVE OR BELOW GROUND, AND |
| SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| PER NFPA 58. IF THE TANK |
| IS BELOW GROUND THE CONTAINER SHALL BE |
| SECURILY ANCHORED PER NFPA 58 SECTION |
| 3-2.2.7(H). |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE |
| THE REVISION & REMOVE & REPLACE ANY |
| PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| WITH A DESCRIPTION OF THE REVISION MADE, IDENTIFYING |
| THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND |
| WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| ONE SET OF THEM LOOSELY ON TOP OF THE |
| COLLATED PLANS TO BE REVIEWED. PLEASE RESUBMIT THE RED |
| LINED PLUMBING SHEETS FROM THE FIRST REVIEW. THIS WILL |
| HELP EXPEDITE THE PLUMBING/GAS PLAN REVIEW. |
| THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |