Date |
Text |
2007-12-04 13:23:18 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| FBC 2004 CODE FAMILY W/ 2007 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. H2.1.1: ROOM 108 IS SHOWN TO HAVE TYPE P25 WALLS, |
| WHICH GO FROM FLOOR TO DECK (SEE A2.1.1). THERE IS NO |
| MEANS SHOWN ON PLANS FOR RETURN AIR FROM THIS SPACE. |
| SHOW HOW BALANCED RETURN IS TO BE ACHIEVED IN THIS AREA |
| IN ACCORDANCE WITH FBC, M 601.4. |
| |
| 2. H2.1.1: EF 1-3 AND EF 1-5 ARE BOTH LOCATED IN A |
| RETURN AIR PLENUM CEILING. THE DISCHARGE DUCT FROM |
| THESE FANS WILL BE UNDER POSITIVE PRESSURE. EXHAUST |
| DUCTS UNDER POSITIVE PRESSURE SHALL NOT BE LOCATED IN A |
| PLENUM IN ACCORDANCE WITH FBC, M 601.3. SHOW HOW THESE |
| AREAS ARE TO BE EXHAUSTED IN ACCORDANCE WITH THIS |
| SECTION. |
| NOTE: EF 1-1 AND EF 1-2 ARE ISOLATED FROM PLENUM AS |
| BATHROOM WALLS ARE TYPE P25, WHICH GO FROM FLOOR TO |
| DECK. THEREFORE THEY ARE NOT SUBJECT TO THIS COMMENT. |
| |
| 3. H2.1.1: HP 1-7, UNIT IS LOCATED TO PROVIDE SERVICE |
| CLEARANCE FROM WALL AT TELLER STORAGE 120. HOWEVER, |
| THIS PLACES THE UNIT ABOVE THE P25 FLOOR TO DECK TYPE |
| WALL AT STORAGE ROOM 117. HOW WILL THIS UNIT BE |
| SERVICEABLE OR ABLE TO BE REMOVED IF IT IS EMBEDDED IN |
| A FRAMED WALL? PLEASE SHOW ACCESS FOR SERVICE AND |
| REPLACEMENT WHICH IS IN ACCORDANCE WITH FBC, M 306.1. |
| THIS CONDITION WOULD ALSO BE IN CONFLICT WITH HVAC NOTE |
| #1. |
| |
| 4. H2.1.1: EF 1-1, 1-2, 1-3, 1-5 ARE SHOWN DISCHARGING |
| THROUGH A NORTH WALL TO AN AREA MARKED AS "EXISTING." |
| ACCORDING TO BASE BUILDING PLANS, THIS AREA IS PART OF |
| THE ENCLOSED PARKING GARAGE. FIRE RESISTANCE RATED |
| SEPARATION IS REQUIRED IN ACCORDANCE WITH FBC TABLE |
| 302.3.2. SHOW HOW THESE OPENINGS ARE TO BE PROTECTED IN |
| ACCORDANCE WITH FBC, M 607.5. ALSO, FANS ARE |
| DISCHARGING INTO AN ENCLOSED PARKING GARAGE. THIS DOES |
| NOT QUALIFY AS OUTDOORS. THE AIR REMOVED BY EVERY |
| MECHANICAL EXHAUST SYSTEM SHALL BE DISCHARGED OUTDOORS |
| IN ACCORDANCE WITH FBC, M 501.2. |
| |
| 5. H2.1.1 AND H6.1.3:HP 1-1 THROUGH HP 1-6 SHARE A |
| COMMON RETURN AIR PLENUM. AS SUCH, THEY ARE REQUIRED TO |
| HAVE FAN SHUT-DOWN BY SMOKE DETECTOR IN ACCORDANCE WITH |
| FBC, M 606.2.2 AND 606.4. IF DUCT SMOKE DETECTORS ARE |
| USED, THEY SHALL BE TIED INTO THE BUILDING FIRE ALARM |
| SYSTEM IN ACCORDANCE WITH FBC, M 606.4.1. |
| |
| 6. H6.1.3: CONTROL SEQUENCES, THE OUTSIDE AIR DAMPERS |
| (MOTORIZED) ARE SHOWN TO BE OPEN WHENEVER THE HEAT PUMP |
| FANS ARE RUNNING. THESE DAMPERS ARE TO BE SHUT WHENEVER |
| THE SPACES SERVED ARE NOT IN USE AND SHALL BE |
| CONTROLLED IN ACCORDANCE WITH THE SHUTOFF DAMPER |
| CONTROL REQUIREMENTS OF FBC 13-409.1.ABC.3.3. |
| |
| 7. H6.1.3: EACH WATER LOOP HEAT PUMP SHALL HAVE A |
| TWO-POSITION AUTOMATIC VALVE INTERLOCKED TO SHUT OFF |
| WATER FLOW WHEN THE COMPRESSOR IS OFF IN ACCORDANCE |
| WITH FBC 13-411.1.ABC.1.4. SHOW COMPLIANCE WITH THIS |
| SECTION. |
| |
| 8. H7.1.1: VENTILATION AIR CALCULATIONS, BASED ON THE |
| SQUARE FOOTAGE OF DIFFERENT AREAS AS SHOWN ON PG |
| A2.1.5, THE OCCUPANT LOADS USED FOR CALCULATIONS DO NOT |
| CORRESPOND WITH THE OCCUPANT LOADS AS SHOWN ON TABLE |
| 403.3. EXAMPLE: THE LOBBY AREA ON PLANS IS SHOWN TO BE |
| 759SQ.FT. AT AN ESTIMATED OCCUPANT LOAD OF 60/1000, |
| THIS SPACE WOULD HAVE AN OCCUPANT LOAD OF 46 PEOPLE. |
| THERE ARE ALSO NO CALCULATIONS FOR TELLER AREAS OR |
| WORKROOMS. INCLUDE THESE SPACES IN THE OFFICE AREA |
| TOTALS BASED ON THE SQUARE FOOTAGE SHOWN ON A2.1.5. THE |
| OCCUPANT LOAD UTILIZED FOR DESIGN OF THE VENTILATION |
| SYSTEM SHALL NOT BE LESS THAN THE NUMBER DETERMINED |
| FROM THE ESTIMATED MAXIMUM OCCUPANT LOAD RATE INDICATED |
| IN TABLE 403.3. |
| |
| 9. H7.1.1: PROVIDE AN AIR BALANCE SCHEDULE SHOWING THE |
| SPACE TO BE PRESSURIZED WITH RESPECT TO THE OUTDOORS IN |
| ACCORDANCE WITH FBC 13-409.1.ABC.2. THE CURRENT BALANCE |
| OF EXHAUST AIR, RELIEF AIR AND OUTSIDE AIR WOULD PUT |
| THE SPACE IN NEGATIVE PRESSURE. |
| |
| 10. H7.1.2: PROVIDE COOLING LOAD CALCULATIONS OR A |
| SYSTEM SIZING SUMMARY IN ACCORDANCE WITH FBC |
| 13-407.1.ABC.1. HVAC SYSTEMS AND EQUIPMENT SHALL BE |
| SIZED TO PROVIDE NO MORE THAN THE SPACE AND SYSTEM |
| LOADS CALCULATED IN ACCORDANCE WITH THIS SECTION PER |
| FBC 13-407.1.ABC.1.1. |
| |
| 11. A1.1.1: THIS PLAN SHOWS A VACUUM TUBE SYSTEM |
| RUNNING THROUGH THIS TENANT SPACE AS WELL AS CROSSING |
| OVER INTO A SEPARATE PARCEL. A SEPARATE PERMIT WITH |
| FULL ENGINEERED DOCUMENTATION IS REQUIRED FOR THIS |
| SYSTEM IN ACCORDANCE WITH FBC 105.3.1(5). SUBMIT A |
| SEPARATE APPLICATION, ASSOCIATED WITH THE PARCEL WHERE |
| THE EQUIPMENT IS LOCATED, WITH ALL REQUIRED |
| DOCUMENTATION AND MANUFACTURER'S SPECS FOR REVIEW IN |
| ACCORDANCE WITH THIS SECTION. |
| |
| 12. AS THIS TENANT BUILD OUT IS TO TAKE PLACE IN A |
| BUILDING WHICH HAS NOT BEEN COMPLETED, AS A CONDITION |
| OF PERMIT, THE CONSTRUCTION SERVICES DEPARTMENT IS |
| REQUIRING A LETTER OF UNDERSTANDING BETWEEN THE BASE |
| BUILDING CONTRACTOR, THE TENANT CONTRACTOR, AND THE |
| BASE BUILDING DEVELOPER. THIS LETTER SHALL STATE THAT |
| ALL INTERESTED PARTIES SHALL TAKE RESPONSIBILITY FOR |
| THEIR WORK AND ACKNOWLEDGE THAT THE WORK OF ONE |
| CONTRACTOR HAS THE POTENTIAL TO IMPACT THE OTHER?S |
| ABILITY TO OBTAIN FINAL INSPECTIONS. CODE DEFICIENCIES |
| WILL NOT BE OVERLOOKED REGARDLESS OF WHO IS RESPONSIBLE |
| FOR THE RELATED WORK. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |