Date |
Text |
2007-12-11 10:15:47 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| FBC 2004 CODE FAMILY W/ 2007 STATE AMENDMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. M-0.1.1: VENTILATION DESIGN CRITERIA NOTE #1 STATES |
| THE VENTILATION RATE PROCEDURE IS PER ASHRAE 62 |
| ADDENDUM N. THIS ADDENDUM IS PART OF ASHRAE 62-2001. |
| ALL MECHANICAL SYSTEMS SUBMITTED FOR PERMIT AFTER DEC. |
| 8, 2006 SHALL BE DESIGNED TO EITHER FBC, M SEC.403 OR |
| ASHRAE 62.1-2004 W/ APPROVED ADDENDA IN ACCORDANCE WITH |
| FBC, M 403.4. DECLARE THE METHOD USED AND SHOW THE |
| VENTILATION SYSTEM TO BE DESIGNED IN ACCORDANCE WITH |
| THE SPECIFIED METHOD. VENTILATION AND EXHAUST SYSTEMS |
| CAN NOT BE REVIEWED AT THIS TIME. |
| |
| 2. M-2.1.0: BASED ON LOCATIONS OF RATED WALLS AS SHOWN |
| ON PG A-2.1.3, THERE ARE SEVERAL DUCTS PENETRATING |
| RATED WALL ASSEMBLIES WITHOUT OPENING PROTECTIVES (SUCH |
| AS FIRE DAMPERS) AS REQUIRED BY FBC, M 607.5. EXAMPLES: |
| THERE IS AN 8 INCH ROUND SUPPLY AND AN 8X6 RETURN |
| PENETRATING THE CORRIDOR WALL AT STORAGE ROOM 142 |
| WITHOUT ANY OPENING PROTECTIVES SHOWN AT THESE |
| LOCATIONS. THIS OCCURS IN SEVERAL LOCATIONS THROUGHOUT |
| CORRIDOR 173. PLEASE CHECK ALL AREAS AND SHOW HOW THESE |
| OPENINGS ARE TO BE PROTECTED. |
| |
| 3. M-2.1.0: CORRIDORS 173 AND 167 ARE SHOWN TO BE 1 |
| HOUR FIRE RESISTANCE RATED ON PG A-2.1.3. A LISTED |
| SMOKE DAMPER DESIGNED TO RESIST THE PASSAGE OF SMOKE |
| SHALL BE PROVIDED AT EACH POINT A DUCT OR AIR TRANSFER |
| OPENING PENETRATES A CORRIDOR ENCLOSURE REQUIRED TO |
| HAVE SMOKE AND DRAFT CONTROL DOORS IN ACCORDANCE WITH |
| SECTION 715.3.3. SEE FBC 716.5.4.1. |
| NOTE: FBC 715.3.3 REQUIRES DOORS IN A 1 HOUR FIRE |
| RESISTANCE RATED CORRIDOR TO MEET THE REQUIREMENTS FOR |
| A SMOKE-AND DRAFT-CONTROL DOOR ASSEMBLY TESTED IN |
| ACCORDANCE WITH UL 1784, WHICH TRIGGERS THE REQUIREMENT |
| FOR SMOKE DAMPERS IN FBC 716.5.4.1. |
| |
| 4. M-2.1.0: CORRIDORS 111, 118 AND 120 ARE NOT SHOWN ON |
| PLANS TO BE FIRE RESISTANCE RATED. HOWEVER, BASED ON |
| THE REQUIREMENTS OF FBC TABLE 1016.1, THESE CORRIDORS |
| MAY BE REQUIRED TO BE RATED. PLEASE SEE BUILDING PLAN |
| REVIEW FOR REQUIREMENTS RELATED TO THIS ISSUE. |
| NOTE: IF THESE CORRIDORS ARE REQUIRED TO BE RATED, THEY |
| ARE SUBJECT TO THE SAME REQUIREMENTS AS STATED IN |
| COMMENTS 2 AND 3 ABOVE. PLEASE COORDINATE WITH |
| ARCHITECT TO ASSURE LOCATIONS OF RATED ASSEMBLIES AND |
| OPENING PROTECTIVES CORRESPOND ON ALL PLANS. |
| |
| 5. M-2.1.0: ROOM 127 BOYS RESTROOM SHOWS 8 INCH ROUND |
| DUCT TURNING DOWN WITH A FIRE DAMPER. THIS FIRE DAMPER |
| APPEARS TO BE IN MID-AIR AND SERVING NO PURPOSE. IS |
| THIS DAMPER INTENDED TO BE LOCATED AT THE WALL |
| PENETRATION RATHER THAN IN THE VERTICAL DUCT? PLEASE |
| CLARIFY. FIRE DAMPERS SHALL BE INSTALLED IN ACCORDANCE |
| WITH THE REQUIREMENTS OF THIS SECTION, AND THE |
| MANUFACTURER?S INSTALLATION INSTRUCTIONS AND LISTING IN |
| ACCORDANCE WITH FBC, M 607.2. |
| |
| 6. M-2.1.0: EXHAUST DISCHARGE FOR RESTROOMS 127 AND 128 |
| APPEARS TO BE DISCHARGING ONTO A WALKWAY. OUTDOOR |
| EXHAUST OPENINGS SHALL BE LOCATED SO AS NOT TO CREATE A |
| NUISANCE. EXHAUST AIR SHALL NOT BE DIRECTED ONTO |
| WALKWAYS IN ACCORDANCE WITH FBC, M 401.5.2. |
| |
| 7. M-2.1.0 AND M-2.2.0: THREE DUCTS FROM AHU-7 ON 2ND |
| FLOOR ARE SHOWN PENETRATING BLOCK WALL WHEN LEAVING |
| ROOM 214 AND RUNNING IN TRUSSES ABOVE CORRIDOR 167. |
| THIS CORRIDOR IS SHOWN AS FIRE RESISTANCE RATED. |
| OPENING PROTECTIVES ARE REQUIRED TO MAINTAIN FIRE |
| RATING AT THIS LOCATION IN ACCORDANCE WITH FBC, M 607.5 |
| AND FBC, M 607.5.4. |
| |
| 8. M-2.2.0: DUCT PENETRATIONS AT BLOWER ROOM 208 DO NOT |
| SHOW OPENING PROTECTIVES. SHOW HOW THESE OPENINGS ARE |
| TO BE PROTECTED IN ACCORDANCE WITH FBC, M 607.5. |
| |
| 9. M-2.2.0: FIRE DAMPERS ARE SHOWN AT DUCT PENETRATIONS |
| OF NON-RATED WALLS AT ROOMS 212 AND 214. FIRE DAMPERS |
| CAN NOT BE INSTALLED IN ACCORDANCE WITH THEIR LISTING |
| IF THEY ARE NOT INSTALLED IN RATED ASSEMBLIES. SHOW |
| COMPLIANCE WITH FBC, M 607.2. IF RATED WALLS ARE |
| REQUIRED AT THESE LOCATIONS, PLEASE COORDINATE WITH |
| ARCHITECTURAL PLANS. IF RATED WALLS ARE NOT REQUIRED AT |
| THESE LOCATIONS, PLEASE REMOVE FIRE DAMPERS FROM THESE |
| WALLS IN ORDER TO COORDINATE WITH ARCHITECTURAL PLANS. |
| |
| 10. M-2.2.0: CATWALKS ARE SHOWN ABOVE THE SANCTUARY TO |
| PROVIDE ACCESS TO ROOF HATCH AND MOTORIZED DAMPERS AT |
| RELIEF VENTS. DETAIL 7 ON PG S-7 HAS NO DIMENSIONS |
| RELATED TO SPACING AND HEIGHTS OF GUARDS FOR THE |
| CATWALKS. PLEASE PROVIDE ALL DIMENSIONAL INFORMATION TO |
| SHOW COMPLIANCE WITH FBC, M 304.10. |
| |
| 11. M-4.1.0: DETAIL 4, FCU-1 IS SHOWN APPROX. 2 FEET |
| FROM THE WALL OF THE STAIRWELL. SHOW HOW MINIMUM |
| SERVICE ACCESS CLEARANCE IS TO BE ACHIEVED IN |
| ACCORDANCE WITH FBC, M 306.1 AND MANUFACTURER?S |
| INSTRUCTIONS. |
| |
| 12. M-4.1.0: OUTSIDE AIR INTAKES, WALL LOUVERS ARE |
| DEFINED AS PANEL WALLS PER FAC RULE 9B-72. AS SUCH, A |
| PRODUCT APPROVAL IS REQUIRED. PROVIDE A COMPLETE |
| PRODUCT APPROVAL FOR THE TYPE OF LOUVERS TO BE USED TO |
| SHOW COMPLIANCE WITH FBC, M 401.5.1. FOR MORE |
| INFORMATION ON THE FLORIDA PRODUCT APPROVAL SYSTEM, |
| PLEASE VISIT: WWW.FLORIDABUILDING.ORG |
| |
| 13. M-6.0.2: DETAIL 1, FIRE DAMPERS, SMOKE DAMPERS, |
| COMBINATION FIRE/SMOKE DAMPERS AND CEILING DAMPERS |
| LOCATED WITHIN AIR DISTRIBUTION AND SMOKE CONTROL |
| SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| REQUIREMENTS OF THIS SECTION, AND THE MANUFACTURER?S |
| INSTALLATION INSTRUCTIONS AND LISTING IN ACCORDANCE |
| WITH FBC, M 607.2. PLEASE VERIFY THAT THE DETAIL ON |
| PLANS IS IN CONFORMANCE WITH THE DAMPER MANUFACTURER?S |
| INSTALLATION INSTRUCTIONS OR THE PLANS MAY DEFER TO THE |
| MANUFACTURER?S INSTRUCTIONS. |
| |
| 14. M-6.0.2: DETAIL 2, THE THROUGH-PENETRATION FIRESTOP |
| SYSTEM SHOWN SAYS AT BOTTOM ?PIPE/INSULATED.? HOWEVER, |
| THIS DETAIL DOES NOT ACCOMMODATE INSULATED PIPE, RATHER |
| IT CALLS FOR PACKING MATERIAL TO BE USED AS A FORM. |
| ALSO PLEASE NOTE THAT THIS DETAIL IS FOR IRON/STEEL |
| PIPE PENETRATING CONCRETE ASSEMBLIES ONLY, NOT FOR |
| COPPER OR FOR PENETRATING FRAMED/GYPSUM ASSEMBLIES. |
| PLEASE VERIFY THAT THIS SYSTEM MEETS ALL THE NEEDS FOR |
| THIS PROJECT OR PROVIDE ADDITIONAL THROUGH-PENETRATION |
| SYSTEMS FOR OTHER CONDITIONS NOT COVERED BY THIS |
| ASSEMBLY. FBC 712.3 AND 712.4. |
| |
| 15. M-7.0.1: SEQUENCE OF OPERATION: EXHAUST FANS ARE |
| SHOWN TO BE CONTROLLED BY THE EMS. HOWEVER, FAN |
| SCHEDULE ON M-5.0.1 CALLS FOR FANS TO BE CONTROLLED BY |
| EITHER INTERLOCK WITH AHU OR LIGHT SWITCH. PLEASE |
| CLARIFY HOW THE FANS ARE TO BE CONTROLLED AND MEET THE |
| REQUIREMENTS OF FBC, M 401.3. |
| |
| 16. M-7.0.1: SYSTEMS WITH DESIGN OUTSIDE AIR CAPACITIES |
| GREATER THAN 3,000 CFM (1.4 M3/S) SERVING AREAS HAVING |
| AN AVERAGE DESIGN OCCUPANCY DENSITY EXCEEDING 100 |
| PEOPLE PER 1,000 FEET (93 M3) SHALL INCLUDE MEANS TO |
| AUTOMATICALLY REDUCE OUTSIDE AIR INTAKE BELOW DESIGN |
| RATES WHEN SPACES ARE PARTIALLY OCCUPIED. SHOW |
| VENTILATION CONTROLS FOR HIGH-OCCUPANCY AREAS IN |
| COMPLIANCE WITH FBC 13-409.1.ABC.3.5. |
| |
| 17. M-7.0.1: SHOW OPTIMUM START CONTROLS IN ACCORDANCE |
| WITH FBC 13-407.1.ABC.2.4.2. |
| |
| 18. ENERGY CALCULATIONS: THE SIGNATURE OF MR. WAMSLEY |
| ON THE FRONT PAGE, WITH THE SEAL AFFIXED, AS WELL AS |
| THE SIGNATURE ON THE CERTIFICATIONS PAGE ARE |
| PHOTOCOPIES ON ALL 3 SETS OF CALCULATIONS SUBMITTED. A |
| PROFESSIONAL ENGINEER SHALL SIGN HIS NAME AND AFFIX HIS |
| SEAL TO ALL PLANS, SPECIFICATIONS, REPORTS, FINAL BID |
| DOCUMENTS PROVIDED TO THE OWNER OR THE OWNER?S |
| REPRESENTATIVE, OR OTHER DOCUMENTS PREPARED OR ISSUED |
| BY SAID REGISTRANT AND BEING FILED FOR PUBLIC RECORD IN |
| ACCORDANCE WITH FAC RULE 61G15-23.002(1). ONLY ORIGINAL |
| SIGNATURES SHALL BE PROVIDED AND SEALED IN ACCORDANCE |
| WITH THIS RULE. PROVIDE ENERGY CALCULATIONS WITH |
| ORIGINAL SEAL AND SIGNATURE OF THE DESIGNER RESPONSIBLE |
| FOR THEIR PREPARATION IN ACCORDANCE WITH FBC |
| 13-103.1.1.1. |
| |
| 19. ENERGY CALCULATIONS: THE COMPLIANCE FORM WAS NOT |
| SIGNED BY THE OWNER OR THE OWNER?S AGENT. THE |
| BUILDING?S OWNER, THE OWNER?S ARCHITECT, OR OTHER |
| AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL |
| CERTIFY THAT THE BUILDING IS IN COMPLIANCE WITH THE |
| CODE IN ACCORDANCE WITH FBC 13-103.1.2. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |