Plan Review Notes
Plan Review Notes For Permit 07110731
Permit Number 07110731
Review Stop ENG
Sequence Number 1
Notes
Date Text
2007-12-12 10:08:45FAILED FOR FOLLOWING REASONS:
  
 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI).
 PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR
 NOI.
 YOU CAN GET NOI INFO FROM
 WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/
 NOTICE OF INTENT DEP FORM 62-621.300(4)(B),
 EFFECTIVE MAY 1, 2003
  
 2. PLEASE SHOW ON DRAWING ALL CITY STANDARDS NOTES FOR
 SIDEWALK, DRIVEWAY, APPROACH, PARKINGS, HANDICAP
 PARKINGS, DUMPSTER ENCLOSURE, YOU CAN GET A C D FOR ALL
 CITY STANDARDS NOTES FROM 1000, 45 STREET, ENGINEERING
 SERVICES, PHONE# 494-1040
  
 3. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE
 DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION
 MUST BE ACCESSIBLE FOR PICKUP TRUCK.
  
 4. PLEASE SHOW ON CALCULATION THAT YOU HAVE CONSIDERED
 FLOOD ZONE AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIA
 AND CROWN OF THE ROAD WHEN YOU DETERMINE THE FIRST
 FLOOR ELEVATION. FIRST FLOOR ELEVATION SHOULD BE
 ATLEAST 1 FOOT HIGHER THAN HIGHEST CROWN OF THE ROAD.
  
 5. PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA,
 GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU
 ARE DEVELOPING FOR THIS PROJECT . PLEASEMAKE SURE
 THESE AREAS SHOWN ON DRAINAGE DRAWINGS MUST MATCH WITH
 AND USED IN STORM WATER QUALITY CALCULATIONS. PLEASE
 PROVIDE A COPY OF THESE WATER QUALITYCALCULATIONS.
  
 6. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE
 SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM
 ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE
 CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING
 ELEVATION, ETC ON DRAWINGS, CALCULATION FOR
 EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET
 DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL
 THESE.
  
 7. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND
 YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET
 FLOODED AND HAVE ENOUGH DRAINS.
  
 8. PLEASE PROVIDE A COPY OF SFWMD PERMIT,,GEO-TECH
 REPORT &STORM WATER QUALITY CALCULATIONS. STORM WATER
 CALS MUST BE APPROVED FROM 100045TH STREET
 ENGINEERING SERVICES.
  
 9. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT ETC., PLANS SHOWING SILT
 FENCE AROUND THE SITE & CATCH BASINS DURING
 CONSTRUCTION AND ALL DEMOLITION PHASE.HEIGHT OF FENCE
 SHOULD BE HIGH ENOUGH PER FDEP TO STOP DUST PARTICLES.
  
 10. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH
 STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED.
  
 PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR
 PERMITTING PROCESS
  
 RASIK CHOKSHI805-6723
  