2008-04-01 19:54:58** DENIED4TH REVIEW**
  
 ** PLEASE SEE THERE ARE COMMENTS FROM THE PREVIOUS
 REVIEWS WHICH ARE STILL IN NEED OF ADDRESSING.
  
  
 1) NOTE: PLEASE SEE THE FIRST TWO REVIEWS REQUESTED THE
 ENERGY CALCULATIONS TO BE SUBMITTED AND NOT UNTIL THE
 THIRD REVIEW WERE THESE DOCUMENTS SUBMITTED. THE THIRD
 REVIEW WAS THE FIRST TIME THIS OFFICE WAS TO REVIEW
 PLANS AND CALCULATIONS. THERE WERE COMMENTS WITH
 RESPECT TO THE TWO COMPLETELY DIFFERENT SETS OF
 CALCULATIONS SUBMITTED. THERE WERE ALSO COMMENTS WITH
 RESPECT THAT ALL INFORMATION CONTAINED ON THE PLANS
 NEEDS TO COORDINATE WITH THE INPUT DATA REPORT. SOME
 EXAMPLES WERE GIVEN ON BOTH SETS OF CALCULATIONS
 PREVIOUSLY SUBMITTED FOR THE THIRD REVIEW. PLEASE SEE
 THAT PLANS AND LIGHTING ON THE CALCULATIONS STILL DO
 NOT COORDINATE. PLEASE SEE THERE ARE FIXTURES ON PLANS
 WHICH DO NOT CONTAIN DESIGNATION OR ARE NOT THE SAME AS
 PLACED IN THE INPUT DATA REPORT. THE INPUT DATA REPORT
 WILL BE NOTED AS IDR FOR THE REMAINDER OF THIS
 COMMENT.
 THIS OFFICE WILL GIVE SOME EXAMPLES ONCE AGAIN:
 EXAMPLE:
 PLEASE SEE THE PLANS AND DESIGNATIONS ON FIXTURES FOR
 ROOF TOP FLOODS. (ALSO NOTED AS 20FT POLES) WHAT IS THE
 WATTAGE ON THESE FIXTURES? PLEASE TAKE A LOOK AT THE
 IDR AS THESE FIXTURES COULD NOT BE IDENTIFIED.
 EXAMPLE:
 PLEASE SEE THE IDR WHICH CONTAINS 800W FIXTURES YET THE
 PLANS NOR THE FIXTURE LEGEND SHOW ANY 800W FIXTURES.
 EXAMPLE:
 PLEASE SEE THE IDR WHICH CONTAINS 4000W FIXTURES YET
 THE PLANS NOR THE FIXTURE LEGEND SHOW ANY 4000W
 FIXTURES.
 EXAMPLE: PLEASE SEE THE IDR REPORT INDICATES 169 W AND
 168W FIXTURES, ARE THESE THE *C-EM* FIXTURES? EXAMPLE:
 PLEASE SEE THE FIXTURE *A*, THESE ARE NOTED ON THE
 FIXTURE LEGEND AS 150W/VA RATED FIXTURES, YET THE *AE*
 FIXTURES ARE NOTED ON FIXTURE LEGEND AS *Q100* AND THE
 MANUFACTURES CATALOG INFORMATION STATES 150W. WHICH
 ONES ARE THESE AND PLEASE SEE THE TOTAL AMOUNT OF *A*
 AND *AE* FIXTURES ON PLANS COMPARED TO THE IDR.
 EXAMPLE:
 PLEASE TAKE A LOOK AT THE FIXTURE *B* AND *BE*. EACH OF
 THESE FIXTURES ARE SHOWN RATED ON MANUFACTURE CATALOG
 INFORMATION AS 200VA RATED, HOWEVER BASED ON THE
 FIXTURE LEGEND THE *B* IS SHOWN WITH A 200PMH AND THE
 *BE* FIXTURES ARE SHOWN LIKE THE *AE* FIXTURES WITH A
 Q-100. WHAT ARE THESE? HOW ARE THESE ARE ALL FIGURED
 INTO THE IDR? THE IDR DOES SHOW SOME 100W FIXTURES
 HOWEVER ONLY FOUR.
 EXAMPLE:
 PLEASE SEE IN ZONE #2 WHICH SHOWS 9-32W FIXTURES ON THE
 IDR HOWEVER THE AMOUNT OF THESE FIXTURES BASED ON PLANS
 IS HIGHER. PLEASE TAKE A LOOK AT THE LIGHTING ON THE
 SHEET E1.1 FOR THE ELEVATOR MACHINE ROOMS. THESE SAME
 ROOMS ON THE SHEET E2.2 SHOW MORE FIXTURES THAN ON E1.1
 AND ALSO THESE FIXTURES IN THESE ROOMS ARE LABELED AS
 *B* FIXTURES. HOW ARE THESE NOW *B* FIXTURES IF THE *B*
 FIXTURES ON THE FIXTURE LEGEND ARE 200W MH? PLEASE ALSO
 CORRELATE THE AMOUNT OF FIXTURES.
 EXAMPLE:
 PLEASE SEE THE FIXTURES FOR IN ZONE #4 (OFFICE). PLEASE
 SEE THE AMOUNT OF 64W FIXTURES ON PLANS IS HIGHER THAN
 THE IDR WHICH SHOWS ONLY ONE OF THESE FIXTURES.
 EXAMPLE:
 PLEASE SEE THE TYPE OF FIXTURE BULBS SHOULD COORDINATE
 WITH PLANS. ALL FIXTURES ARE NOTED ON THE IDR AS THE
 FOLLOWING: FLUORESCENT OR METAL HALIDE, HOW IS THIS
 POSSIBLE?
 EXAMPLE:
 PLEASE SEE THE LIGHTING CONTROL METHODS ON THE IDR
 STATES *CENTRAL CONTROL* FOR ALL PARKING LEVEL
 LIGHTING. HOW IS THIS POSSIBLE? ROOF TOP/OUT-DOOR
 LIGHTING WHICH WILL NOT BE INSIDE THE ENCLOSED GARAGE
 WHICH IS GREATLY AFFECT BY DAYLIGHT SHALL BE TURNED OFF
 AS REQUIRED PER 13-415.1.ABC.1.4. SOME OF THE LIGHTING
 ON PLANS DOES THIS AND THE IDR DOES SHOW PHOTO-SENSOR
 CONTROL FOR EXTERIOR LIGHTS ONLY. IN EITHER CASE, THE
 LIGHTING ON PLANS IS NOT ON CONTROL BY CENTRAL
 STATION.
 EXAMPLE:
 PLEASE SEE THE PLANS DOES INCLUDE AN ELECTRIC WATER
 HEATER, HOWEVER THE IDR IS *BLANK*. HOW IS THIS
 POSSIBLE?
 EXAMPLE:
 PLEASE SEE THE PLANS CALL FOR FIXTURES *H* FOR THE
 EXTERIOR AND A NUMBER UNDER THE FIXTURE LEGEND AS A
 *T5C40*. THE ONLY INFORMATION ON A *T5C40* IS THIS IS A
 175W MH BULB, YET THE IDR DOES NOT CONTAIN AN 175W
 BULBS ON THE IDR. PLEASE SEE THE LOAD ON CIRCUIT
 *INGH-15* DOES NOT CORRESPOND TO WHETHER OR NOT THESE
 ARE 40W FIXTURES OR 175W FIXTURES. PLEASE BE SURE TO
 ADJUST ANY LOAD CALCULATIONS ONCE DETERMINED. PLEASE
 SEE FBC 13-415.2, 13-415.2.ABC.1.1, .1.2 AND .1.3.
 13-400.3.B, 13-415.1.B, 13-412 ETC
  
  
 ** THESE ARE SOME EXAMPLES*
 PLEASE BE SURE TO GO THROUGH ALL LIGHTING ON PLANS;
 PLEASE BE SURE TO GO THROUGH ALL CALCULATIONS AND THE
 IDR. PLEASE BE SURE TO ADJUST PHOTO-METRICS ONCE
 COORDINATION IS COMPLETED.
 IT IS IMPORTANT TO NOTE THAT ALL INFORMATION ON THE IDR
 NEEDS TO COORDINATE WITH PLANS NOT ONLY THE COMMENTS
 MADE FOR ELECTRICAL. HOW IS IT POSSIBLE THAT THE IDR
 DOES NOT CONTAIN MANY OTHER DESIGN ASPECTS FOR OTHER
 TRADES SUCH AS BUILDING COMPONENTS?
  
 2) NOTE: THIS IS ONLY BEING NOTED: THE FIXTURES IN
 STAIRS SHOWN AS D AND DDE CONTAIN 3-32W BULBS?
  
 3) NOTE: PLEASE BE SURE THE CERTIFICATION SHEET
 CONTAINS THE SIGNATURE FROM THE OWNER'S
 REPRESENTATIVE.
 FBC 13-103.1
  
 4) NOTE: PLEASE SEE NOTICE IS NOW BEING GIVEN TO FS
 553.80(2)(B) WITH RESPECT TO REPEAT COMMENTS FOR CODE
 COMPLIANCE.
 THIS IS ONLY A NOTICE AT THIS TIME. THE FIRST TWO
 REVIEWS REQUESTED THE CALCULATIONS.
 THE CALCULATIONS HAVE NOW ONLY BEEN REVIEWED TWICE,
 PLEASE BE SURE ALL PLANS AND CALCULATIONS COORDINATE ON
 THE FOLLOWING REVIEW.
 ONE COPY OF PLANS AND THE CALCULATIONS SUBMITTED MAY BE
 RETAINED BY THIS OFFICE.
  
  
 ** THIS OFFICE EXPRESSES THAT IF THERE ARE ANY
 COMMENTS, QUESTIONS OR CLARIFICATION NEEDED TO PLEASE
 DO NOT HESITATE IN CONTACTING THIS OFFICE.
 PLEASE SEE BELOW FOR CONTACT INFORMATION.
  
 ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE PICKED UP FOR
 CORRECTIONS, PLEASE BE SURE TO COMPLETELY REMOVE ALL
 OLD/VOIDED SHEETS AND ONLY INSERT NEW REVISED SHEETS
 INTO TWO COMPLETE SETS FOR REVIEW AND STAMPING. DO NOT
 LEAVE ANY OLD/VOIDED SHEETS IN SETS.
 PLEASE DO NOT ATTACH SUPPORTING DOCUMENTS TO PLANS. ANY
 ADDITIONAL DOCUMENTATION SUCH AS PRODUCT APPROVALS,
 SPEC/CUT SHEETS, CALCULATIONS ETC SHOULD BE PLACED INTO
 TWO SETS/FOLDERS/BINDERS ETC.
 PLEASE KNOW ONLY ONE SET OF THE OLD/VOIDED SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND AVOID ANY
 DELAYS.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved