2007-10-24 13:48:29 | ***FAILED**** PLEASE PROVIDE THE FOLLOWING: |
| |
| |
| 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| NOI. |
| YOU CAN GET NOI INFO FROM |
| WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| EFFECTIVE MAY 1, 2003 |
| 2. PLEASE SHOW ON DRAWINGSDUMPSTER LOCATION ON DWG, |
| LOCATION MUST BE ACCESSIBLE FOR PICKUP TRUCK. YOUR NOTE |
| ON SHEET C-10, SAYS "DUMPSTER AND RECEPTACLES WILL BE |
| MANUALLY ROLLED OUT........." YOU NEED TO GET AN |
| APPROVAL FROM CITY'S SANITATION DEPT FOR PICKUP. |
| 3. PLEASE SHOW ON STORM WATER CALCULATTION THAT YOUR FF |
| ELEVATION IS HIGH ENOUGH ANDHAVE CONSIDERED FLOOD |
| ZONE AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIA TO |
| DETERMINE THE FIRST FLOOR ELEVATION, PARING LOT |
| ELEVATION, CROWN OF THE ROAD ELEVATION, SIDEWALK ETC. |
| ALSO, PLEASE SHOW WORST CROWN OF THE ROAD ELEVATION ON |
| THE DRAWINGS. |
| 4. PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA, |
| GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU |
| ARE DEVELOPING FOR THIS PROJECT . PLEASEMAKE SURE |
| THESE AREAS SHOWN ON DRAINAGE DRAWINGS MUST MATCH WITH |
| AND USED IN STORM WATER QUALITY CALCULATIONS. |
| 5. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE |
| SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM |
| ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC ON DRAWINGS, |
| 6.IN YOURCALCULATION FOR EXFILTRATION TRENCHES, PER |
| SFWMD YOU NEED TOTAKE WORST ONE EITHER 1" OVER ENTIRE |
| AREA OR 2.5" CRITERIA FOR % OF IMPERVIOUS AREA. SO, |
| PLEASE RECALCULATE LENGTH OF EXFILTRATION TRENCH. ALSO, |
| PLEASE SHOW DRY DETENTION/WET DETENTION AREAS IN STORM |
| WATER CALS I YOU HAVE THEM. |
| 7. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| YOUR SITE FOR STORM WATER DRAIN. |
| 8. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, &STORM |
| WATER QUALITY CALCULATIONS. STORM WATER CALS MUST BE |
| APPROVED FROM 100045TH STREET ENGINEERING SERVICES |
| BEFORE WE ISSUE PERMIT. |
| 9. POLLUTION PREVENTION DETAILS:CLOTHES USED FOR SILT |
| FENCE ETC., HEIGHT OF FENCE SHOULD BE HIGH(5' OR MORE) |
| ENOUGH PER FDEP TO STOP DUSTPARTICLES. |
| 10. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED. |
| |
| PLEASE RESPOND EACH OF THE ABOVE ITEMSIN DETAIL TO |
| EXPEDITE YOUR PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |