Date |
Text |
2007-11-10 11:24:02 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| *NOTE* THIS PLAN SUBMITTED FOR PLAN REVIEW ONLY. NO |
| PERMIT APPLICATION HAS BEEN SUBMITTED AT THIS TIME. |
| |
| FBC 2004 CODE FAMILY W/ 2005 AND 2006 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. WALL LOUVERS ARE LISTED AS PANEL WALLS UNDER FAC |
| RULE 9B-72 AND AS SUCH A PRODUCT APPROVAL IS REQUIRED. |
| PROVIDE PRODUCT APPROVALS FOR EACH TYPE OF WALL LOUVER |
| TO BE USED. FOR MORE INFORMATION ON THE FLORIDA PRODUCT |
| APPROVAL SYSTEM PLEASE VISIT: WWW.FLORIDABUILDING.ORG |
| |
| 2. M-1: SUPPLY REGISTERS FOR ELECTRICAL ROOM 107 AND |
| MECHANICAL ROOM 108 ARE SHOWN TO BE FED FROM THE RETURN |
| DUCT FOR AHU-2. ALSO, THE RETURN GRILL FOR ELECTRICAL |
| ROOM 107 IS SHOWN BEING TIED INTO THE SUPPLY BRANCH |
| FROM AHU-2 WHICH FEEDS CONFERENCE ROOM 104. PLEASE |
| CLARIFY HOW EACH DUCT IS SUPPOSED TO FUNCTION. FBC,M |
| 603.1 AND FBC 106.1.1 |
| NOTE: DUE TO THE ABOVE DISCREPANCIES, AIR BALANCES ON |
| THESE SYSTEMS CAN NOT BE REVIEWED AT THIS TIME. |
| |
| 3. M-1: SUPPLY AND RETURN DUCTS CROSSING CORRIDOR AT |
| ROOMS 109 AND 110 ARE SHOWN WITH 3 OUT OF 4 DUCT |
| PENETRATIONS OF WALLS PROTECTED WITH FIRE DAMPERS. ARE |
| THESE WALLS INTENDED TO BE FIRE RESISTANCE RATED? THEY |
| ARE NOT SHOWN AS SUCH BASED ON THE WALL TYPE AS SHOWN |
| ON PAGES A-1 AND A-10. PLEASE COORDINATE THE LOCATIONS |
| OF RATED ASSEMBLIES WITH ARCHITECTURAL DESIGNER, |
| SHOWING OPENING PROTECTIVES WHERE REQUIRED IN |
| ACCORDANCE WITH FBC,M 607.5. |
| NOTE: IF IT IS DETERMINED THAT THESE WALLS REQUIRE A |
| RATING, SHOW ALL 4 PENETRATIONS TO BE PROTECTED IN |
| ACCORDANCE WITH THIS SECTION AND FBC,M 607.8. |
| |
| 4.M-1: EF-3 ON FLOOR PLAN CALLS FOR 690 CFM. FAN |
| SCHEDULE ON M-3 SHOWS EF-3 AT 640 CFM. WHICH IS |
| CORRECT? VERIFY THAT FAN CAN PROVIDE THE MINIMUM |
| VENTILATION AS REQUIRED BY FBC,M TABLE 403.3 FOR LOCKER |
| ROOMS, TOILET ROOMS AND SHOWERS. COORDINATE FLOOR PLANS |
| WITH EQUIPMENT SCHEDULES. |
| |
| 5. M-2: WHAT IS THE MEANS AND LOCATION OF CONDENSATE |
| DISPOSAL? AHU MOUNTING DETAIL SAYS TO SEE PLUMBING |
| PLANS FOR CONTINUATION. NO INFORMATION REGARDING |
| LOCATION OF CONDENSATE DISCHARGE COULD BE FOUND ON |
| PLUMBING PLANS. SHOW CONDENSATE DISPOSAL FOR AHU?S 1,2 |
| AND 6 TO BE IN COMPLIANCE WITH FBC,M 307.2.1 THROUGH |
| 307.2.4 AND FBC 1503.6. |
| |
| 6. M-2: FIRE DAMPER DETAIL CALLS FOR ANGLES TO BE |
| FASTENED TO SLEEVE PER SMACNA RECOMMENDATIONS. FIRE |
| DAMPERS ARE LISTED AND LABELED ASSEMBLIES AND AS SUCH |
| SHALL BE INSTALLED PER THEIR LISTING AND MANUFACTURER?S |
| INSTALLATION INSTRUCTIONS IN ACCORDANCE WITH FBC,M |
| 607.2. UNLESS THIS DETAIL MATCHES THE MANUFACTURER?S |
| INSTRUCTIONS IT SHOULD BE REMOVED FROM PLANS AND |
| REPLACED BY THE MANUFACTURER?S INSTRUCTIONS EITHER ON |
| THE PLANS OR AS A SEPARATE SUBMITTAL. IT MAY BE |
| REPLACED BY A GENERAL NOTE WHICH DEFERS TO |
| MANUFACTURER?S INSTRUCTIONS. |
| |
| 7. M-3: A/C UNIT SCHEDULE, CFM SHOWN ON SCHEDULE FOR |
| AHUS DO NOT MATCH THOSE ON FLOOR PLAN. COORDINATE FLOOR |
| PLANS AND EQUIPMENT SCHEDULE. ALSO, SEE COMMENT #2 |
| ABOVE. |
| |
| 8. A/C UNIT SCHEDULE NOTE #3 INDICATES AHU-3 SHALL BE |
| OF DOUBLE WALL CONSTRUCTION. NO AHU-3 IS SHOWN ON PLANS |
| OR SCHEDULE. PLEASE CLARIFY. FBC 106.1.1. |
| |
| 9. M-3 O.A. SCHEDULE SHOWS AHU-1 SYSTEM DESIGNED FOR |
| 460 CFM. A/C UNIT SCHEDULE INDICATES AHU-1 TO PROVIDE |
| 965 CFM OF O.A. WHICH IS CORRECT? PLEASE CLARIFY AND |
| COORDINATE SCHEDULES. |
| |
| 10. PROVIDE AN ENERGY CODE COMPLIANCE CERTIFICATION |
| FORM (ENERGY CALCULATIONS) IN ACCORDANCE WITH FBC |
| 13-101.1.1 AND FBC 13-103 (ENTIRE SECTION). |
| |
| 11. COOLING LOAD CALCULATIONS SHALL BE ATTACHED TO THE |
| CODE COMPLIANCE FORM SUBMITTED TO THE BUILDING |
| DEPARTMENT AT TIME OF PERMIT APPLICATION IN ACCORDANCE |
| WITH FBC 13-407.1.ABC.1 AND ALL HVAC SYSTEMS AND |
| EQUIPMENT SHALL BE SIZED TO PROVIDE NO MORE THAN THE |
| SPACE AND SYSTEM LOADS CALCULATED IN ACCORDANCE WITH |
| FBC 13-407.1.ABC.1.1. |
| |
| 12. AHU?S 1 AND 2 SHALL BE PROVIDED WITH OFF-HOUR |
| CONTROLS INCLUDING AUTOMATIC SHUTDOWN, SETBACK |
| CONTROLS, OPTIMUM START CONTROLS, SHUTOFF DAMPER |
| CONTROLS AND ZONE ISOLATION IN ACCORDANCE WITH FBC |
| 13-407.1.ABC.2.4. |
| |
| 13. PROVIDE AN AIR BALANCE SCHEDULE SHOWING THE |
| BUILDING TO BE PRESSURIZED WITH RESPECT TO THE OUTDOORS |
| IN ACCORDANCE WITH FBC 13-409.1.ABC.2. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |
| |