2007-10-26 14:53:54 | DENIED |
| REFERENCE: |
| ** FBC-2004 WITH 05 & 06 REVISIONS, FUEL GAS. |
| ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION |
| REQUIREMENTS. |
| ** FBC-2004 CHAPTER 1, THE CITY OF |
| WEST PALM BEACH AMENDMENTS. |
| ** FLORIDA ADMINISTRATIVE CODE (FAC). |
| ** FLORIDA STATUTES (FS). |
| |
| THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| GAS PLAN REVIEW TO MEET CODE COMPLIANCE: |
| |
| CONTRACTOR INFORMATION |
| NOTE: GAS PERMIT REQUIRED. GAS CONTRAC- |
| TOR TO SUBMIT PLANS WITH PERMIT APPLICA- |
| TION. ALL GAS INSPECTIONS TO BE COMPLETE |
| BEFORE FINAL GEN/COM INSPECTION. |
| |
| ******IMPORTANT INFORMATION****** |
| AS OF 8/25/06 GENERATOR (GEN/RES AND |
| GEN/COM) PERMIT APPLICATIONS SHALL NOT |
| BE ACCEPTED UNLESS THE ELECTRICAL INFOR- |
| MATION AND GAS (OR DIESEL) INFORMATION |
| IS ALL SUBMITTED AT THE SAME TIME. THE |
| GENERATOR, ELECTRICAL AND GAS/DIESEL IN- |
| FORMATION WILL BE ROUTED TOGETHER. THIS |
| WILL ENSURE THAT ALL OF THE INFORMATION (PARTICULARLY |
| THE MANUFACTURER'S SPECI- |
| FICATIONS AND INSTALLATION INSTRUCTIONS) |
| ARE AVAILABLE TO ALL PLAN REVIEWERS. |
| |
| 1. PER FBC-2004 CHAPTER 1, SECTION 106.1: SUBMITTAL |
| DOCUMENTS. CONSTRUCTION |
| DOCUMENTS, SPECIAL INSPECTION AND |
| STRUCTURAL OBSERVATION PROGRAMS, AND |
| OTHER DATA SHALL BE SUBMITTED IN TWO OR |
| MORE SETS WITH EACH APPLICATION FOR A |
| PERMIT. |
| |
| 2. PROVIDE TWO (2) COPIES OF A SITE PLAN OR SURVEY |
| THAT CLEARLY INDICATES THE PROPOSED LOCATION OF THE |
| GENERATOR INDICATING ALL DIMENSIONS FROM PROPERTY LINES |
| AND ADJACENT DWELLING STRUCTURES. |
| |
| 3. PROVIDE MANUFACTURER'S SPECFICATIONS FOR THE |
| PROPOSED GENERATOR INDICATING RECOMMENDED SET BACKS |
| FROM STRUCTURES. |
| |
| 4. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE, CORRESPONDING |
| LENGTHS, AND THE TYPE OF PIPE MATERIAL BEING USED ON |
| THE EXISTING SYSTEM PER FBC-2004 FUEL GAS CODE. |
| |
| 5. WHAT IS THE TYPE OF GAS BEING USED? (LP OR |
| NATURAL) |
| |
| 6. BTU LOAD OF EACH APPLIANCE AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU |
| 402.4(33). |
| **NOTE: WHAT IS THE BTU LOAD OF THE EXISTING |
| GENERATOR? |
| |
| 7. SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY, (METER), TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| OF CAPACITY TABLES A.3.1(4). |
| **NOTE: WHAT IS THE LONGEST LENGTH OF THE EXISTING GAS |
| SYSTEM? |
| |
| 8. INDICATE THE DELIVERY PRESSURE (PSI) |
| PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| **NOTE:WHAT IS THE DELIVERY PRESSURE OF THE EXISTING |
| GAS SYSTEM? |
| |
| 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2. |
| **NOTE: IF GAS DELIVERY PRESSURE IS GREATER THAN 2 PSI |
| PLEASE SUBMIT TWO (2) COPIES OF THE MP REGULATORS BEING |
| USED WITH THE MAKE, MODEL NUMBER, BTU LOAD CAPACITY, |
| AND A LISTING FROM A NATIONALLY RECOGNIZED TESTING |
| LABORATORY. |
| |
| 10. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| |
| 11. CLEARLY INDICATE ON THE PLAN IF THE |
| LP TANK IS ABOVE OR BELOW GROUND, AND |
| SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| PER NFPA 58. IF THE TANK |
| IS BELOW GROUND THE CONTAINER SHALL BE |
| SECURILY ANCHORED PER NFPA 58 SECTION |
| 6.6.1. |
| |
| END OF COMMENTS: |
| |
| REVIEW BY: MIKE PERSON |
| PLUMBING PLANS EXAMINER |
| (561) 805-6730 |
| FAX (561) 805-6731 |