Plan Review Notes For Permit 07080538 |
Permit Number |
07080538 |
|
Review Stop |
FIRE |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2007-08-30 14:09:20 | *****DENIED***** | | | | | | 1.THE OCCUPANCY CLASSIFICATION IS INDICATED AS A | | BUSINESS OCCUPANCY.IS THIS THE CLASSIFICATION FOR THE | | EXISTING STRUCTURE OR THE PROPOSED? | | | | 2.STRUCTURES UNDERGOING CONSTRUCTION, ALTERATION, OR | | DEMOLITION OPERATIONS SHALL COMPLY WITH NFPA 241. | | | | 3.COMBUSTIBLE WASTE MATERIALS, DUST, AND DEBRIS SHALL | | BE REMOVED FROM THE SITE AT THE END OF EACH SHIFT OR | | MORE FREQUENTLY AS NECESSARY FOR SAFE OPERATION. | | | | 4.THE SCOPE OF WORK SHALL NOT INTERFERE OR HINDER | | EMERGENCY RESPONSE ACCESS TO THE SAID PROPERTY OR | | VICINITY THEREOF (INCLUDING STREETS, ALLEYS, FIRE | | LANES). | | | | 5.THE FIRE PROTECTION SYSTEMS (FIRE SPRINKLER/FIRE | | ALARM) SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES | | DURING ALTERATION. | | | | 6.IF/WHEN IT IS NECESSARY TO SHUT DOWN THE FIRE | | PROTECTION SYSTEM, THE FIRE DEPARTMENT SHALL BE | | NOTIFIED WHEN THE SYSTEM IS SHUT DOWN AND WHEN THE | | SYSTEM IS RETURNED TO SERVICE. | | | | 7.ALL REQUIRED EXIT COMPONENTS, FIRE-RESISTIVE | | ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED. | | | | TO EXPEDITE THE PLAN REVIEW PROCESS, INCLUDE A RESPONSE | | LETTER INDICATING HOW/WHERE EACH ITEM WAS ADDRESSED | | | | | | CAPT. MICHAEL A. WILLIAMS | | FIRE PLAN REVIEW | | 561-805-6722 |
|