2007-11-13 14:50:12 | BUILDING REVIEW THIRD CHECKLIST. |
| REVIEW UNDER EXISTING BUILDING CODE 2004, FLORIDA |
| RESIDENTIAL CODE 2004 AND FBC 2004 WITH 2007 |
| REVISIONS. |
| |
| 1- PROVIDE COMPLETE ENGINEERING PACKAGE FOR CHANCE |
| HELICAL PIER FOUNDATION SYSTEM TO BE APPLIED TO THIS |
| HOUSE AS REQUIRED ON SHEET S-1 BY ENGINEER OF RECORD |
| AND BY ICC-ES LISTED REPORT ER-5110.(REPEAT COMMENT). |
| INFORMATION SUBMITTED DOESN'T PROVIDE THIS |
| INFORMATION. |
| |
| |
| ***NOTE: ENGINEERING REQUIREMENTS WHERE DISCUSSED OVER |
| THE PHONE WITH LADY FROM THE COMPANY SUPPLYING THE |
| CHANCE HELICAL FOUNDATION SYSTEM. SHE CALLED ME TO |
| CLARIFYTHAT PRODUCT APPROVAL WAS NOT REQUIRED. SHE |
| TOLD ME THAT THE COMPANY'SENGINEER WILL BE PROVIDING |
| THE REQUIRED ENGINEERING, BUT IT WAS NOT SUBMITTED THIS |
| TIME. |
| |
| 2- ENGINEER OF RECORD LETTER APPROVING THE FOUNDATION |
| SYSTEM NEEDS TO HAVE ENGINEER'S ORIGINAL SEAL AND |
| SIGNATURE AS REQUIRED BY CHAPTER 471 FLORIDA STATE AND |
| SEC. 61G15-23.002 OF FLORIDA ADMINISTRATIVE CODE. |
| |
| 3- SOIL TEST REPORT SUBMITTED: |
| A) ENGINEER NEEDS TO SIGN AND SEAL THE REPORT AND |
| PROVIDE HIS INFORMATION AS REQUIRED BY SEC. |
| 61G15-23.002 OF FLORIDA ADMINISTRATIVE CODE. REPORT |
| SUBMITTED WAS SIGNED ONLY BY THE PROJECT COORDINATOR, |
| DAVID ALKER. |
| |
| B) ENGINEERING FIRM NEEDS TO PROVIDE THE FIRM'S |
| CERTIFICATE OF AUTHORIZATION NUMBER AS REQUIRED BY SEC. |
| 61G15-23.002. |
| |
| 4- TYPICAL STAIR DETAIL 4/A3 DOESN'T MATCH STRUCTURAL |
| PLANS. (REPEAT COMMENT).STRUCTURAL PLANS DON'T SHOW |
| WOOD POSTS. THERE IS NOT 2X6LANDING. REVISE AS |
| REQUIRED. |
| |
| 5-PLEASE MAKE SURE ALL PRODUCT APPROVALS SUBMITTED |
| ARE REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF |
| RECORD AS REQUIRED BY SEC. 106.3.3 CITY AMENDMENTS TO |
| FBC 2004. SOME OF THE PRODUCT APPROVALS WERE NOT |
| STAMPED WITH THE REVIEW STAMP. |
| |
| JULIO GOMEZ |
| BUILDING PLANS EXAMINER |
| (561)805-6712 |