2007-07-31 14:11:39 | BUILDING PLAN REVIEW |
| PERMIT: 07070220 |
| ADD: 500 BANYAN BLVD |
| CONT: CATALFUMO |
| TEL: (561)307-4746 |
| |
| FL BLD CODE= 2004 FLORIDA BUILDING CODE |
| W/ 2006 FBC REVISIONS |
| * WEST PALM BEACH AMENDMENTS |
| |
| REVIEW |
| ACTION: DENIED |
| |
| 1)--- VERY IMPORTANT STATEMENT --- |
| PLEASE DO NOT IGNORE! |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL |
| LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH |
| A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE |
| SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE |
| FOUND WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR |
| YOUR ANTICIPATED COOPERATION. |
| |
| 2) )OF THE UTILTY SIGN OFF WE ARE MISSING THE WATER |
| DEPARTMENT OR UTILITIES ENGINEERING DEPARTMENT. SHEET |
| C-9 DOES INDICATE A 14' ALLEYWAY BETWEEN LOT1 AND LOT |
| 10, A COPY OF THE UNITY OF TITLE IS IN HAND. PLEASE |
| UPDATE SHOWING THE ABANDOMENT OF THE ALLEYWAY AND THEN |
| THE SIGN OFF FROM ENGINEERING AND UTILITIES. SHEET |
| S1-1.0INDICATES THERE WILL BE AN FPL DUCTBANK BENEATH |
| THE BUILDING EAST TO WEST PLEASE PROVIDE THE RECORDED |
| UTILITY EASEMENT FOR THIS AREA AS WELL AS FOR THE FPL |
| VAULT. |
| |
| 3) SHEETLS0.0PLEASE CORRECT THE ADDRESS TO 500 |
| BANYAN. |
| |
| 4) NOTE CORRECT FOR BUILDING PLAN LS0.0 FPL VAULT 3HR |
| WALL PLANS INDICATE 90 MINUTE DOORS PLEASE SEE TABLE |
| 715.3 3HR WALLS/ 3 HR OPENING PROTECTIVES. |
| |
| 5)S1-1.0 INDICATES THE USE OF 16" AUGER PILE WHERE AS |
| THE SOILS REPORTS DO NOT REFLECT USING SUCH A SYSTEM. |
| PLEASE PROVIDE THE GEOENGINEERS CALCULATIONS FOR DEPTH |
| OF PILE. |
| |
| 6) SOILS REPORTS SUBMITTED ARE COPIES NOT ORIGINAL |
| SIGNED AND SEALED DOCUMENTS. NOTE THIS WILL BE A |
| THRESHOLD BUILDING REQUIRING THREE DOCUMENTS TO BE |
| SUBMITTED. |
| |
| 7) WPB AMENDMENT 105.13.6. W.P.B. CONSTRUCTION SERVICES |
| DEPARTMENT REQUEST FOR THRESHOLD BUILDINGS A SPECIAL |
| INSPECTOR AS REQUIRED BY S. 553.79(5) FLORIDA STATUTES |
| TO THE MINIMUM INSPECTIONS REQUIRED BY THIS CODE. |
| CONTACT HAROLD PISKURA MANAGER OF THE SPECIAL INSPECTOR |
| PROGRAM AT (561) 805-6711 FOR FURTHER INFORMATION |
| BEFORE THE PERMIT MAY BE ISSUED. |
| |
| 8) S2-4.0 VS DUCT BANK WHICH SYSTEM WILL BE INSTALLED |
| FIRST,DUCT BANK, VIBROFLOTATION OR THE FOUNDATION SEE |
| DETAIL# 8.IF THE DUCT BANK IS PLACED AFTER THE FOOTERS |
| THE SOILS NATURAL REPOSE WILLUNDERMINE THE |
| FOUNDATION. |
| |
| 9)105.13. SPECIAL FOUNDATION PERMIT.WHEN APPLICATION |
| FOR A PERMIT TO ERECT OR ENLARGE A BUILDING HAS BEEN |
| FILED, & PENDING ISSURANCE OF SUCH PERMIT, THE BUILDING |
| OFFICIAL MAY, AT HIS/ HER DISCRETION, ISSUE A SPECIAL |
| PERMIT FOR THE FOUNDATION ONLY, UPON WRITTEN REQUEST OF |
| THE OWNER AND CONTRACTOR. THE HOLDER OF SUCH A SPECIAL |
| PERMIT IS PROCEEDING AT HIS OR HER OWN RISK AND WITHOUT |
| ASSURANCE THAT A PERMIT FOR THE |
| REMAINDER OF THE WORK WILL BE GRANTED AND THAT |
| CORRECTIONS WILL NOT BE REQUIRED IN ORDER TO MEET THE |
| PROVISIONS OF THE TECHNICAL CODE. |
| |
| BUILDING PLAN REVIEW II |
| JIM WITMER C. B. O. |
| |
| TEL: (561)805-6715 |
| FAX: (561)659-8026 |
| E-MAIL: [email protected] |
| |
| |