Date |
Text |
2007-07-11 16:48:43 | *** DENIED *** |
| 1) PLEASE PROVIDE COMBUSTION AND MAKE-UP AIR, AND |
| CALCULATIONS FOR GAS CLOTHES DRYERS AS THEY ARE IN A |
| CONFINED SPACE, SEE 2004 FBC/FG 304. |
| |
| 2) PLEASE RE-CALCULATE OUTSIDE AIR CALCULATIONS. MY |
| CALCULATIONS SHOW THAT ZONE 1 REQUIRES 1,000 CFM'S, |
| ZONE 2 REQUIRES 531 CFM'S, AND ZONE 3 REQUIRES 750 |
| CFM'S, SEE 2004 FBC/M TABLE 403.3 'SPECIALTY SHOPS' |
| 'BEAUTY' . |
| |
| 3) SEE A/C SYSTEMS ON MECHANICAL PLANS ARE NOT LABELED |
| CORRECT, CHECK THE WSHP SCHEDULE. |
| |
| 4) SEE RETURN AIR GRILL FROM UNIT 2 IS COMMON DUCTED TO |
| UNIT 3 GRILL ALSO AND THIS WOULD REQUIRE SMOKE DETECTOR |
| IN THE SUPPLY AND RETURN DUCTS, PER 2004 FBC/M 606.2.2. |
| IF THE ERV SUPPLIED OUTSIDE AIR TO UNIT 3 RETURN AIR |
| GRILL THEN THE RETURNS WOULD NOT BE A COMMON RETURN AND |
| NOT REQUIRE SMOKE DETECTORS IN THE RETURNS, ONLY THE |
| SUPPLIES. |
| |
| 5) PLEASE SHOW THE LOCATION OF THE DUCT SMOKE DETECTORS |
| ON THE PLANS, ALSO THE ERV. SEE 2004 FBC/M 606.1. |
| |
| 6) PLEASE LIST THE ERV IN THE EQUIPMENT SCHEDULE. |
| |
| 7) PLEASE SUBMIT DETAILED MANUFACTURER'S |
| SPECIFICATION'S AND INSTALLATION INSTRUCTIONS FOR THE |
| ERV. |
| |
| 8) PLEASE SHOW THE CFM'S FOR THE BATHROOM EXHAUST FANS |
| ON THE MECHANICAL PLANS. |
| |
| 9) THE FAN SCHEDULE IS SHOWING EF-2 AT 750 CFM'S, BUT |
| IN THE NAILS ROOM IT SHOWS 1200 CFM'S, PLEASE CORRECT. |
| |
| 10) IF EF-2 IS REMOVING 1200 CFM'S AND OUTSIDE AIR INTO |
| THE BUILDING IS ONLY 650 CFM'S THE BUILDING WOULD BE IN |
| A NEGATIVE PRESSURE, PLEASE CORRECT. |
| |
| MECHANICAL PLAN REVIEW BY; |
| TOM GORDON (561) 805-6729. |