Plan Review Notes
Plan Review Notes For Permit 07061019
Permit Number 07061019
Review Stop G
Sequence Number 3
Notes
Date Text
2007-10-29 10:55:14DENIED 3RD TIME
 REFERENCE:
 ** FBC-2004 WITH 05 & 06 REVISIONS, FUEL GAS.
 ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION
 REQUIREMENTS.
 ** FBC-2004 CHAPTER 1, THE CITY OF
 WEST PALM BEACH AMENDMENTS.
 ** FLORIDA ADMINISTRATIVE CODE (FAC).
 ** FLORIDA STATUTES (FS).
  
 THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR
 GAS PLAN REVIEW TO MEET CODE COMPLIANCE ON THE
 RESUBMITTED DRAWINGS:
  
 1. AS ASKED FOR ON PREVIOUS PLAN REVIEWS: THE
 RESUBMITTED PLANS NEED THE EXISTING BTU LOAD OF GAS
 SYSTEM, AND THE PROPOSED BTU LOAD OF THE GENERATOR. PER
 106.1.2, ADDITIONAL INFORMATION REQUIRED.
  
 2. AS ASKED FOR ON PREVIOUS PLAN REVIEWS: THE
 RESUBMITTED PLANS NEED THE LONGESTS LENGTH OF THE GAS
 SYSTEM. (THIS INCLUDES THE EXISTING GAS SYSTEM) PER
 106.1.2, ADDITIONAL INFORMATION REQUIRED.
  
 3. AS ASKED FOR ON PREVIOUS PLAN REVIEWS: THE
 MANUFACTURER SPECIFICATION SHEETS FOR THE GENERATORS
 2ND STAGE REGULATOR NEED THE MANUFACTURER'S NAME (THIS
 IS NOT INDICATED ON THE SUBMITTED DATA SHEETS), AND A
 LISTING FROM A NATIONALLY RECOGNIZED TESTING LABORATORY
 (THIS IS NOT INDICATED ON THE SUBMITTED DATA SHEETS)
 PER 106.1.2, ADDITIONAL INFORMATION REQUIRED.
  
 4. FBC-2004 CHAPTER 1,SECTION 106.3.4.3:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING. PLEASE DO
 THIS PRIOR TO RESUBMITTING.
  
 END OF COMMENTS:
  
 REVIEW BY: MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved