Date |
Text |
2007-09-11 10:37:02 | CONSTRUCTION SERVICES DEPARTMENT |
| 200 SECOND STREET, 3RD FLOOR, WEST PALM BEACH, |
| FLORIDA33401 |
| TEL:561-805-6713FAX: |
| 561-805-6731 |
| |
| JAMES JOHNSTON,CBO PERMIT NO 07060182 |
| BUILDING PLAN EXAMINERII PROJECT COOLING TOWER |
| REPLACEMENT |
| E-MAIL:JJOHNSTON @WPB.ORG ADDRESS 515 N. FLAGLER |
| DRIVE |
| CONTRACTOR AIRSTRON, INC. |
| DATE SEPTEMBER 11, 2007 |
| STRUCTURALPLANREVIEW (2) F.S. |
| 713.13 NOTICE OF COMMENCEMENT TO BE FILED WITH THE |
| CLERK OF COURT |
| F.S.713.13 (2) IF THE WORK DESCRIBED |
| IN THE NOTICE OF COMMENCEMENT IS NOT COMMENCED WITHIN |
| 90 DAYS AFTER RECORDING THEREOF, SUCH NOTICE IS NULL |
| AND VOID |
| RESUBMIT A NEWLY RECORDED NOTICE OF COMMENCEMENT PRIOR |
| TO PERMIT ISSUANCE. |
| |
| (4) SHEETS-1 PROVIDE WIND IMPORTANCE FACTOR ON DATA |
| |
| |
| (5) SHEET S-2 SUBMIT DETAIL OFCOOLING TOWER WITH ALL |
| SUPPORTS. IDENTIFY HIGHEST POINT OF |
| |
| TOWER FROM ROOF SLAB |
| |
| (6) SHEET S-1 INFORMATION ON ARBAB ENGINEERING, INC. |
| SHEET 10 OF 25 DOES NOT MATCH |
| |
| SHEET S-1DRAWINGS |
| |
| (7) SHEET S-2 FBC 1905.1.1STRENGTH OF CONCRETE |
| STATE DESIGN STRENGTH FOR FORMED CONCRETE COLUMN |
| |
| (8) SHEET S-1 PROVIDE INFORMATION STATING? |
| MODIFICATION ? OF STUB COLUMN |
| |
| (9) SHEET S-2 SEE PROTECTION OF METALS AS |
| SPECIFIED ON SHEET M-2 ?TYPICAL ROOF MOUNTED |
| |
| PIPING SERVICE SUPPORT INSTALLATION?PROVIDE |
| PROTECTION FOR STRUCTURAL SUPPORTS |
| |
| COMPATIBLE WITH THAT SPECIFIED ON SHEET M-2. |