2007-06-23 17:59:57 | *** UNSAT *** |
| |
| |
| 1) NOTE:PLEASE SEE THE SUBMITTED PLANS MAY NOT BE |
| DONE BY AN ELECTRICAL CONTRACTOR. THIS SCOPE OF WORK |
| INCLUDING ELECTRICAL, SLAB WORK ETC SHALL BE DONE BY A |
| PROFESSIONAL ENGINEER AS REQUIRED UNDER FS 471.003 THE |
| DOCUMENTS SUBMITTED DOE NOT CORRELATE FOR ELECTRICAL. |
| NO REVIEW WAS DONE AS ENGINEERED PLANS ARE NEEDED AND |
| THE SHEETS SUBMITTED DO NOT CORRELATE. PLEASE SEE |
| BUILDING REVIEW COMMENTS AS ENGINEERING WILL ALSO BE |
| REQUIRED FOR SLAB AND ATTACHMENT. THE 6INCH SLAB AS |
| SHOWN DOES NOT PROVIDE THE INFORMATION NEEDED. PLEASE |
| PROVIDE COMPLETED PLANS FOR ALL ELECTRICAL AND OTHER |
| WORK FOR REVIEW. |
| FBC 106.1, 106.3.5.1.2, 106.1.2 |
| |
| 2) NOTE: PLEASE KNOW THE FOLLOWING CODES WILL BE |
| REQUIRED ON PLANS FOR DESIGN AND SCOPE OF WORK. 2004 |
| FBC W/2006 REVISIONS. |
| 2002 NFPA-110 |
| 2005 NFPA-70 |
| ** PLEASE BE SURE TO SEE COMMENTS FROM OTHER TRADES FOR |
| OTHER CODES WHICH MAY BE REQUIRED. |
| |
| 3) NOTE: PLEASE SUBMIT TWO COMPLETE PACKAGES OF |
| MANUFACTURE SPECS/CUT SHEETS FOR ALL EQUIPMENT |
| INCLUDING THE FOLLOWING. |
| THESE PACKAGES SHOULD BE BOUND TOGETHER IN SOME FASHION |
| WITH TABS OF SOME SORT TO LABEL EACH IN PACKAGE. |
| GENERATOR, MAIN SWITCHGEAR, ATS, GENERATOR ENCLOSURE, |
| FUEL TANK(S) ETC. |
| NEC 110.3, 90.7. |
| FBC 106.1.2 |
| * SOME OF THESE WERE SUBMITTED, HOWEVER NOT ALL WHICH |
| IS NEEDED. |
| |
| 4) NOTE: PLEASE SEE THE VALUE FOR COMPLETE SCOPE OF |
| WORK SHALL INCLUDE ALL LABOR , MATERIALS, EQUIPMENT, |
| GENERATOR, ATS, MAIN(S), DESIGN COSTS ETC EVEN IF ANY |
| OF THIS IS OWNER SUPPLIED. |
| FBC 108.3 |
| |
| 5) NOTE: PLEASE SEE 250.6, 250.24 AS NO * EQUIPMENT |
| GROUNDING CONDUCTOR * IS INSTALLED BEFORE THE FIRST |
| MEANS OF DISCONNECT. |
| |
| 6) NOTE: PLEASE BE SURE COMPLETE LOAD CALCULATIONS ARE |
| SUBMITTED FOR EXISTING SERVICE. |
| PLEASE CLARIFY HOW THE 2000AMP SERVICE IS NOW BEING |
| DOWN-SIZED TO 1400AMPS?? |
| |
| ** ALL COMMENTS ABOVE SHOULD BE FORWARDED TO THE |
| ENGINEER WHO WILL BE TAKING OVER PROJECT. |
| |
| * ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW II |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |